HomeMy WebLinkAboutF16-0034_FP1_1478901391.pdfKevin P. Murray
Digitally signed by Kevin P. Murray
DN: C=US,
E=kmurray@frontierfireprotection.com,
O=Frontier Fire Protection Inc.,
CN=Kevin P. Murray
Date: 2016.06.13 14:33:07-06'00'
12" inch. correct
drawings.
approved as noted.
Isolation valves and
control valves shall be
accessible from floor
with out ladder.
Standpipes to
be
interconnected
.
Vail Fire & Emergency Services
06/28/16