Loading...
HomeMy WebLinkAboutF16-0034_FP1_1478901391.pdfKevin P. Murray Digitally signed by Kevin P. Murray DN: C=US, E=kmurray@frontierfireprotection.com, O=Frontier Fire Protection Inc., CN=Kevin P. Murray Date: 2016.06.13 14:33:07-06'00' 12" inch. correct drawings. approved as noted. Isolation valves and control valves shall be accessible from floor with out ladder. Standpipes to be interconnected . Vail Fire & Emergency Services 06/28/16