HomeMy WebLinkAboutB17-0092 Utility Verification Form 181 W Meadow Dr.pdf UTILITY APPROVAL&VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and
also to verify service availability and location for new construction and should be used in conjunction with preparing your
utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted
to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM-
MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact
The Town of Vail. 181 W Meadow Drive
Subject Property Address: Vail, Co 81632 Lott"' Block/11/A Subdivision I f 111. 2L
Primary Contact 1 Owner Representative:_ Phone. 720-309-8858
Steve Sego /Project: 1 Plans Dated: 6/30/2017
Primary Contact/Owner Representative Signature
Authorized Signature Comments Date
CENTURY LINK
970.328.8288(tel)
970.328.8282(fax)
Contacts: Kelly McClernon
kelly.mcclernon@centurylink.com
XCEL HIGH PRESSURE GAS
970.244.2788(tel)
970.390.4777(cell) r
970.244.2661 (fax) *07Contact: Ron SmithAZ_‘tEett
ran.smith@xcelenergy.com
HOLY CROSS ENERGY
970.947.5425(tel)
970.94 (fax) � 5122/17
Contact:1: Jeff Jeff Vroom
jvroom@holycross.com
XCEL Energy -
970.262.4032(tel)
970.262.4038(fax) 7/26/17
7126117
Contacts: Britt Mace itCA--
brittany.mace@xcelenergy.com
EAGLE RIVER WATER&SANITATION
DISTRICT ry a .
970.477.5449(tel) I f
970.845.7218(fax) 'rr
Contact:Tug Birk
dbirk@erwsd.org
COMCAST CABLE
970.930.4713(tel) /1/0 Co.t,r ,c
303.603.1004(fax) 111111111r. 7/4,/)1:7
Contact: Michael Johnson l
Michaeljohnson@cable.comcast.com
CDOT(Only in CDOT Right-of-way)
970.683.6284(tel)
Contact: Dan Roussin
Daniel.roussin@dot.state.co.us
NOTES:
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the
Public Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for •
re-approval &re-verification if the submitted plans are altered in any way after the authorized signature date.