HomeMy WebLinkAboutB17-0092_A-107.1_1503950443.pdfREF.
REF.
REF.
FD
FD
F91
1 2
B
A
ALL ROOF PENETRATIONS AND EXTERIOR ENVELOPE
MODIFICATION TO BE PROVIDED COMPLIANT WITH SYSTEM
SPECIFIC MANUFACTURER RECOMMENDED DETAILS. SUBMISSION
OF DETAILS AND PRODUCT INFORMATION TO ARCHITECT FOR
REVIEW TO BE PROVIDED WITH LETTER FROM MANUFACTURER
OR THIRD PARTY ENTITY CONFIRMING WARRANTY AND SYSTEM
INTEGRITY WILL BE MAINTAINED.
1.
2.
3.
4.
5.
IF ROOF OR EXTERIOR ASSEMBLY MANUFACTURER IS NOT ABLE TO
BE CONFIRMED THROUGH OWNER RECORDS OR ON-SITE REVIEW,
GC TO ENGAGE IN THIRD-PARTY TO TEST SYSTEM AND CONFIRM
MANUFACTURER PRIOR TO ANY MODIFICATIONS.
ANY ROOF MODIFICATIONS REQUIRE OWNER APPROVAL PRIOR TO
DEMOLITION OR CONSTRUCTION.
ROOF SYSTEM INTEGRITY TO BE VERIFIED BY THIRD-PARTY ENTITY
APPROVED BY MANUFACTURER PRIOR TO FINAL SIGN-OFF.
GENERAL NOTES
KEY PLAN
LEGEND
REGION INDICATES AREA NOT
IN SCOPE
ALL EXTERIOR DETAILS PROVIDED BY THE ARCHITECT ARE
INTENDED TO SHOW SYSTEM INTENT AND ARE TO BE REVIEWED
AND CONFIRMED WITH MANUFACTURER FOR SYSTEM COMPLIANCE
PRIOR TO MODIFICATIONS.
KEYNOTE LEGEND
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
CENTRAL
WING
RENOVATION
7/11/2017
10:24:03 AM
15924.00
A-107.1
OVERALL FLOOR PLAN -
ROOF
2017
07/11/17
PERMIT
RESUBMISSION
VAIL
VALLEY
MEDICAL
CENTER
180 S. Frontage
Road
West,
Vail, CO 81657
1/16" = 1'-0"
A1
OVERALL FLOOR PLAN - ROOF PHASE 1.5
NORTH
A
B
C
D
E
F91 EXTEND EXISTING ROOF WALKWAY PAD ROUTE TO NEW
EQUIPMENT. PROVIDE TWO WALKWAY PAD DEPTH INSTALLATION
AROUND EACH PIECE OF NEW EQUIPMENT AND AT ALL
MAINTENANCE LOCATIONS.
08/28/17