Loading...
HomeMy WebLinkAboutB17-0092_A-152C.1_1508947548.pdfHC10 LARGE EXAM ROOM 120W OFFICE 120YY OFFICE 120J OFFICE 120K EXAM 120L EXAM 120M EXAM 120N EXAM 120P BREAK 120O OFFICE 120U WAIT 120Q RECEPTION 120R CORRIDOR 120T PT TLT 120V STORAGE 120Y 7' - 9" 8' - 7" C05 1' - 6" C03 1' - 9" 2' - 0"C03 1' - 5"C03EQ EQ7' - 10" 3' - 0" 4' - 9 1/2"2' - 0"C05 C13 C05 8' - 0" EQ 7' - 7" EQ 3' - 6" 8' - 0" 3' - 10"EQ EQEQ EQ 4' - 6"2' - 0" EXISTING SYSTEMS, LIFE SAFETY FEATURES, ETC., ARE TO REMAIN OPERATIONAL DURING ALL HOURS OF THE DAY. REGULAR CONSTRUCTION WORK HOURS ARE FROM 7:00 AM AND 5:30 PM. ALL SHUT DOWNS OR MODIFICATIONS SHALL BE COMPLETED PER M.O.P COORDINATION PROCESSES. ADDITIONALLY, NO SYSTEM IS TO BE SHUT DOWN WITHOUT FIRST COORDINATING WITH VVMC AND OBTAINING AN APPROVED METHOD OF PROCEDURE. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. PROVIDE CORNER OR WALL GUARDS AT ALL EXPOSED CORNERS IN PATIENT AREAS ALL LIFE SAFETY SYSTEMS AND FIRE RATED ASSEMBLIES TO BE MAINTAINED PER LIFE SAEFTY CODE REQUIREMENTS AT ALL TIMES. SEE LS SERIES FOR MORE INFORMATION. DOORS TO BE LOCATED 6" FROM ADJACENT WALL ON HINGE SIDE UNLESS NOTED OTHERWISE PROVIDE COORDINATION WALK WITH OWNER AND ARCHITECT TO CONFIRM ALL BACK BOXES AND WALL DEVICE LOCATION BEFORE DRYWALL INSTALLATION. WHEN ITEM NOTED TO BE DEMOLISHED, ENTIRETY OF ITEM TO BE DEMOLISHED. ABANDON IN PLACE IS NOT ACCEPTABLE. CONTRACTOR IS ULTIMATELY RESPONSIBILE FOR ALL DEMOLITION AND PREPARTIONS REQUIRED FOR FINAL CONSTRUCTION, INCLUDING BUT NOT LIMITED TO CORING, TRENCHING, AND FINISH MODIFICATIONS PROVIDE METAL TRIM AT ALL EXPOSED CORNERS AT TILE LOCATIONS. WALL MOUNTED DEVICES SHALL NOT SPAN BETWEEN SURFACES OF VARYING DEPTH. DEVICES TO BE LOCATED SUCH THAT THEY DO NOT SPAN BETWEEN SURFACES OF VARYING DEPTH OR SCRIBED INTO THE SURFACE MATERIAL WITH THE GREATEST DEPTH OF THE WALL. GENERAL NOTES GENERAL NOTES AREA NOT IN SCOPE GYP. BOARD CEILING 2' x 2' ACT CEILING EPOXY FINISH ON GYP. BOARD CEILING EXISTING 2' x 2' ACT CEILING KEY PLAN KEYNOTE LEGEND MECHANICAL DIFFUSER (SUPPLY AIR) MECHANICAL DIFFUSER (RETURN AIR) 2' x 4' LIGHT2' x 2' LIGHT RECESSED CAN LIGHT FIXTURE 8' x 0" CEILING HEIGHT ABOVE FINISH FLOOR 4' - 0" PENDANT LIGHT 18" x 18" ACCESS PANEL 2' - 0" WALL DECORATIVE LINEAR LIGHT 4' - 0" STRIP LIGHT CUBICLE CURTAIN TRACK NOTE: NOT ALL SYMBOLS SHOWN ON THE DRAWINGS ARE INDICATED BELOW. SEE MECHANICAL, ELECTRICAL FIRE ALARM, AND TECHNOLOGY DRAWINGS FOR ADDITIONAL SYMBOLS AND SYSTEMS INFORMATION SECURITY CAMERA EXISTING GYP. BOARD CEILING EXIT LIGHTING 2' x 2' ACT CEILING SCRUBBABLE GC TO PROTECT EXISTING FINISHES. FINISHES IMPACTED BY CONSTRUCTION TO BE REPAIRED OR REPLACED TO MATCH EXISTING CONDITION. GC TO PROVIDE OWNER WITH OPPORTUNITY TO REMOVE MEDICAL EQUIPMENT AHEAD OF DEMOLITION WORK. STORE RECYCLABLES SUCH AS COPPER FOR SALVAGE BY OWNER. REMOVE AND REPLACE (E) CEILING RE: INTERIM LIFE SAFETY PLANS FOR MORE INFO. 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant CENTRAL WING RENOVATION 7/11/2017 10:24:34 AM15924.00 A-152C.1 ENLARGED REFLECTED CEILING PLAN - LEVEL 2 - AREA C 2017 07/11/17PERMIT RESUBMISSION VAIL VALLEY MEDICAL CENTER 180 S. Frontage Road West, Vail, CO 81657 1/4" = 1'-0"A1 RCP - LEVEL 2 - AREA C - PHASE 1.5 A B C D E NORTH C03 ACOUSTIC CEILING GRID START POINT. C05 ALIGN NEW CEILING GRID TO EXISTING CEILING GRID C10 CUBICLE CURTAIN WITH TRACK. CURTAIN PROVIDED BY OWNER. C13 EXTEND BULKHEAD CEILING 1 1 1 1 1 ADDENDUM 1 05/23/17 1 10/25/17