HomeMy WebLinkAboutB17-0092_A-152C.1_1508947548.pdfHC10
LARGE EXAM
ROOM
120W
OFFICE
120YY
OFFICE
120J
OFFICE
120K
EXAM
120L
EXAM
120M
EXAM
120N
EXAM
120P
BREAK
120O
OFFICE
120U
WAIT
120Q
RECEPTION
120R
CORRIDOR
120T
PT TLT
120V
STORAGE
120Y
7' - 9"
8' - 7"
C05
1' - 6"
C03
1' - 9" 2' - 0"C03
1' - 5"C03EQ EQ7' - 10"
3' - 0" 4' - 9 1/2"2' - 0"C05
C13
C05
8' - 0"
EQ 7' - 7" EQ
3' - 6" 8' - 0" 3' - 10"EQ EQEQ EQ
4' - 6"2' - 0"
EXISTING SYSTEMS, LIFE SAFETY FEATURES, ETC., ARE TO REMAIN
OPERATIONAL DURING ALL HOURS OF THE DAY. REGULAR
CONSTRUCTION WORK HOURS ARE FROM 7:00 AM AND 5:30 PM. ALL
SHUT DOWNS OR MODIFICATIONS SHALL BE COMPLETED PER M.O.P
COORDINATION PROCESSES. ADDITIONALLY, NO SYSTEM IS TO BE
SHUT DOWN WITHOUT FIRST COORDINATING WITH VVMC AND
OBTAINING AN APPROVED METHOD OF PROCEDURE.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
PROVIDE CORNER OR WALL GUARDS AT ALL EXPOSED CORNERS IN
PATIENT AREAS
ALL LIFE SAFETY SYSTEMS AND FIRE RATED ASSEMBLIES TO BE
MAINTAINED PER LIFE SAEFTY CODE REQUIREMENTS AT ALL TIMES.
SEE LS SERIES FOR MORE INFORMATION.
DOORS TO BE LOCATED 6" FROM ADJACENT WALL ON HINGE SIDE
UNLESS NOTED OTHERWISE
PROVIDE COORDINATION WALK WITH OWNER AND ARCHITECT TO
CONFIRM ALL BACK BOXES AND WALL DEVICE LOCATION BEFORE
DRYWALL INSTALLATION.
WHEN ITEM NOTED TO BE DEMOLISHED, ENTIRETY OF ITEM TO BE
DEMOLISHED. ABANDON IN PLACE IS NOT ACCEPTABLE.
CONTRACTOR IS ULTIMATELY RESPONSIBILE FOR ALL DEMOLITION
AND PREPARTIONS REQUIRED FOR FINAL CONSTRUCTION,
INCLUDING BUT NOT LIMITED TO CORING, TRENCHING, AND FINISH
MODIFICATIONS
PROVIDE METAL TRIM AT ALL EXPOSED CORNERS AT TILE
LOCATIONS.
WALL MOUNTED DEVICES SHALL NOT SPAN BETWEEN SURFACES
OF VARYING DEPTH. DEVICES TO BE LOCATED SUCH THAT THEY DO
NOT SPAN BETWEEN SURFACES OF VARYING DEPTH OR SCRIBED
INTO THE SURFACE MATERIAL WITH THE GREATEST DEPTH OF THE
WALL.
GENERAL NOTES
GENERAL NOTES
AREA NOT IN SCOPE
GYP. BOARD CEILING
2' x 2' ACT CEILING
EPOXY FINISH ON
GYP. BOARD CEILING
EXISTING 2' x 2' ACT
CEILING
KEY PLAN
KEYNOTE LEGEND
MECHANICAL DIFFUSER
(SUPPLY AIR)
MECHANICAL DIFFUSER
(RETURN AIR)
2' x 4' LIGHT2' x 2' LIGHT
RECESSED CAN
LIGHT FIXTURE
8' x 0" CEILING HEIGHT
ABOVE FINISH FLOOR
4' - 0" PENDANT LIGHT
18" x 18" ACCESS
PANEL
2' - 0" WALL
DECORATIVE
LINEAR LIGHT
4' - 0" STRIP LIGHT
CUBICLE CURTAIN
TRACK
NOTE: NOT ALL SYMBOLS SHOWN ON THE DRAWINGS ARE INDICATED
BELOW. SEE MECHANICAL, ELECTRICAL FIRE ALARM, AND TECHNOLOGY
DRAWINGS FOR ADDITIONAL SYMBOLS AND SYSTEMS INFORMATION
SECURITY CAMERA
EXISTING GYP.
BOARD CEILING
EXIT LIGHTING
2' x 2' ACT CEILING
SCRUBBABLE
GC TO PROTECT EXISTING FINISHES. FINISHES IMPACTED BY
CONSTRUCTION TO BE REPAIRED OR REPLACED TO MATCH
EXISTING CONDITION.
GC TO PROVIDE OWNER WITH OPPORTUNITY TO REMOVE MEDICAL
EQUIPMENT AHEAD OF DEMOLITION WORK.
STORE RECYCLABLES SUCH AS COPPER FOR SALVAGE BY OWNER.
REMOVE AND
REPLACE (E) CEILING
RE: INTERIM LIFE
SAFETY PLANS FOR
MORE INFO.
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
CENTRAL WING RENOVATION
7/11/2017 10:24:34 AM15924.00
A-152C.1
ENLARGED REFLECTED
CEILING PLAN - LEVEL 2 -
AREA C
2017
07/11/17PERMIT
RESUBMISSION
VAIL VALLEY
MEDICAL
CENTER
180 S. Frontage
Road West, Vail, CO 81657 1/4" = 1'-0"A1 RCP - LEVEL 2 - AREA C - PHASE 1.5
A
B
C
D
E
NORTH
C03 ACOUSTIC CEILING GRID START POINT.
C05 ALIGN NEW CEILING GRID TO EXISTING CEILING GRID
C10 CUBICLE CURTAIN WITH TRACK. CURTAIN PROVIDED BY OWNER.
C13 EXTEND BULKHEAD CEILING
1
1
1
1
1
ADDENDUM 1 05/23/17 1
10/25/17