Loading...
HomeMy WebLinkAboutB17-0092_A-300.1_1498849020.pdf5e2001 HOT LAB 104B CONTROL 104A CASEWORK, RE: INTERIOR ELEVATIONS EXISTING STRUCTURAL SLAB CEILING SYSTEM, RE: RCP WINDOW, RE: WINDOW SCHEDULE CASEWORK, RE: INTERIOR ELEVATIONS De2001 NUCLEAR MEDICINE CAMERA 105A CONTROL 104A ACOUSTICAL CEILING SYSTEM, RE: RCP CASEWORK, RE: INTERIOR ELEVATIONS EXISTING STRUCTURAL SLAB OPEN COAT HOOK WALL PROTECTION 6 EXISTING STRUCTURAL BEAM OPEN TO BEYOND MECHANICAL CHASE, RE: MECHANICAL ACOUSTICAL CEILING SYSTEM, RE: RCP PASS THROUGH CHAMBER CLEAN ROOM 120G EXISTING WALL CORNER GUARD CASEWORK, RE: INTERIOR ELEVATIONS CASEWORK, RE: INTERIOR ELEVATIONS A-592.1 D3 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant CENTRAL WING RENOVATION 3/10/2017 3:36:50 PM 15924.00 A-300.1 BUILDING SECTIONS 2017 03/10/17 PERMIT VAIL VALLEY MEDICAL CENTER 180 S. Frontage Road West, Vail, CO 81657 1/4" = 1'-0" A5 N/S SECTION AREA A 1/4" = 1'-0" B5 W/E SECTION AREA A 1/4" = 1'-0" B3 W/E SECTION AREA B 06/30/17