HomeMy WebLinkAboutB17-0092_A-401A.2_1508947732.pdf12' - 2 3/8"
F51
F28
F29 4' - 0"3' - 0" EQ EQ
B3
A-550.1
SIM 2' - 10"F29
F77
A4
A-591.1
SIM
F81F81
F29
F772' - 10"F43
F55
F29
F74 2' - 10"F43
F29
F74
F76
2' - 6"TRASH, OF/OI ALIGNB3634
A3
A-591.1
SHREDDER,
OF/OI
4 EQ SPACES = 6' - 3"2' - 0"A1
A-591.1
SIM
W3630 W3630
F43
F53F53
F53F29
F74
TA5 RE: D5/ A-320.1 FOR DETAIL4' - 11 1/2" WALL TILETA1TA1
TA3
F15
F47
TA7
F60
F61F61
F29
TA6
TA5
RE: D5/ A-320.1 FOR DETAIL4' - 11 1/2" WALL TILEF60
F61F61
F15 RE: D5/ A-320.1 FOR DETAIL 4' - 11 1/2"TA2
TA4
TA1TA1
TA8
F60
F61F61
D5
A-320.1
COUNTER TOP DEPTH TO BE 25" FOR BASE CABINETS AND
31" FOR ALL 30" HT WORK-SURFACES U.N.O.
STYLE
WIDTH OF
B1836
HEIGHT OF
BASE
WALL CABINET DEPTH TO BE 15"
U.N.O.
STYLE
WIDTH OF
W1836
HEIGHT OF
WALL AND TALL
STYLE
B BASE CABINET WITH DOOR & DRAWERS
BD BASE CABINET WITH DRAWERS
BF BASE FILE CABINET
BN BASE CABINET WITHOUT DOOR & DRAWER
BS ADA SINK BASE CABINET
K KNEE OPENING
KT KNEE OPENING WITH KEYBOARD TRAY
KD KNEE OPENING WITH PENCIL DRAWER
T TALL CABINET WITH DOORS
TG TALL CABINET WITH SLIDING GLASS DOORS
W WALL CABINET WITH DOORS
WG WALL CABINET WITH SLIDING GLASS DOORS
WN WALL CABINET WITH NO DRAWERS
AS ADJUSTABLE SHELVES
CASEWORK NOTE:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
REFER TO ELEVATIONS FOR DOOR, DRAWER, AND SHELF CONFIGURATIONS.
ALL SOLID SURFACE COUNTERTOPS TO BE SS1, U.N.O.
ALL PLAM COUNTERTOPS TO BE PL3, U.N.O.
ALL PLAM CABINETS TO BE PL1, U.N.O.
REFER TO INTERIOR FINISH DRAWINGS FOR FINISH INFORMATION.
PROVIDE 4" RUBBER COVE BASE AT ALL CASEWORK KICKSPACES, U.N.O.
COORDINATE ALL EQUIPMENT PLANS AND ELECTRICAL DOCUMENTS FOR
LOCATION OF ALL REQUIRED GROMMETS.
PROVIDE 4" HEIGHT INTEGRAL COVE BACK SPLASH WHERE BACKSPLASH IS
INDICATED ON INTERIOR ELEVATIONS IN NON-HEALTHCARE HANDWASHING
SINK AREAS. AT HEALTHCARE SINK AREAS, SIDE SPLASH, BACK SPLASH, AND
FREE-STANDING SPLASH PANEL TO FLANK ALL SIDES OF HANDWASHING
SINK. HEIGHT OF HEALTHCARE SINK TO BE ABOVE THE TOP OF THE FAUCET
WATER SUPPLY LOCATION AT A MINIMUM. AT HEALTHCARE SINK LOCATIONS,
SIDE, BACK, AND FREE-STANDING SPLASH PANEL TO BE OF THE SAME
MATERIAL AS THE COUNTERTOP U.N.O.
FIELD VERIFY DIMENSIONS OF WALL LAYOUTS BEFORE FABRICATION OF
CASEWORK.
PROVIDE FINISHED END PANELS AT ALL EXPOSED SIDES OF CASEWORK.
ALL SOLID SURFACE OR ENGINEERED STONE COUNTERTOPS TO HAVE
EASED EDGE AND BE FINISHED ON ALL EXPOSED SIDES AND BOTTOM.
PROVIDE FRAMING SUPPORT FOR UNSUPPORTED OR FREE-STANDING
COUNTERTOPS. SEE A4/A592.1 FOR MORE INFORMATION.
PROVIDE RADIUS ON COUNTER TOP CORNERS. SEE DETAIL A6/A-592.1 FOR
MORE INFORMATION.
CASE WORK LEGEND
INTERIOR ELEVATIONS GENERAL NOTES & LEGEND
A.
B.
C.
EQUIPMENT TAG. SEE Q SERIES FOR MEDICAL EQUIPMENT INFORMATION.
TOILET ACCESSORIES TAG. SEE A-760.2 FOR TOILET ACCESSORIES
INFORMATION.
FINISH TAG. SEE A-600 SERIES FOR FINISH INFORMATION.
E #
XX#
TA
6' - 8 1/2"
F32
F29 F51 5' - 3"8" EQ
2 EQ SPACES =
4' - 4"EQ F31
F56
F29
F29
F62
F62F62
F29
F62
F62 F29 F62 F62
OPEN
TO BEYOND
F29
E5
A-591.1
A4
A-591.1
SIM
E5
A-591.1
BS3634 B2834
W3030
F71
F120
F121
F119
F118
F43 WN3030
B1834
A5
A-592.1
NOTE: GC TO
VERIFY APPLIANCE
DIMENSIONS
AHEAD OF
FABRICATION
F29 2' - 10"B3634 B2034 B3634
F74F74
E3
A-591.1
SIM E3
A-591.1
SIM
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
CENTRAL WING RENOVATION
8/11/2017 4:36:35 PM15924.00
A-401A.2
AREA A ENLARGED PLANS
AND INTERIOR
ELEVATIONS
2017
07/11/17PERMIT
RESUBMISSION
VAIL VALLEY
MEDICAL
CENTER
180 S. Frontage
Road West, Vail, CO 81657 1/4" = 1'-0"C2 CONFERENCE ROOM - NORTH
1/4" = 1'-0"D4 TOUCH DOWN - WEST
1/4" = 1'-0"C1 OFFICE - EAST
1/4" = 1'-0"D2 TOUCH DOWN - NORTH
1/4" = 1'-0"E1 CORRIDOR - NORTH
1/4" = 1'-0"E3 CORRIDOR - SOUTH
1/4" = 1'-0"E2 CORRIDOR - EAST
1/4" = 1'-0"B1 TOILET #104 - NORTH
1/4" = 1'-0"D1 CORRIDOR - WEST
1/4" = 1'-0"B2 TOILET #104 - EAST
1/4" = 1'-0"B3 TOILET #104 - WEST
1/4" = 1'-0"C4 CONFERENCE ROOM - EAST
1/4" = 1'-0"C5 STORAGE - NORTH
F15 SINK WITH PIPE PROTECTION, RE: PLUMBING
F28 MAKER BOARD; PROVIDE FULLY ADHERED MARKER TRAY "EGAN
AERO MARKER TRAY" OR SIMILAR
F29 WALL BASE, RE: FINISH SCHEDULE
F31 14 GA. SHELVING UPRIGHT SECURED TO METAL FRAMING
WITHIN WALL BEYOND
F32 MONITOR AND BRACKET; MATCH HEIGHT OF EXISTING
LOCATION, OFCI. GC TO PROVIDE FRAMING WITHIN WALL.
F43 P.LAM CABINETRY FUR-DOWN WITH END PANEL ON BOTH SIDES
AS REQUIRED , RE: FINISH SCHEDULE.
F47 SCRIBE MIRROR INTO TILE, TYPICAL
F51 CONFERENCE TABLE, OFCI. COORDINATE POWER AND AV
CONNECTION WITH ELECTRICAL
F53 SCRIBE PANEL, RE: FINISH SCHEDULE
F55 COPIER, OF/ CI
F56 PLASTIC LAMINATE CLAD BALANCED SHELF PANEL ON
SHELVING BRACKET; PROVIDE SHELF LOCATOR PER
MANUFACTURER RECOMMENDATION. BASIS OF DESIGN: KNAPE
AND VOGT "82/182 SYSTEM" OR SIMILAR.
F60 SCHLUTER RONDEC - DB FINISHING CAP OR SIMILAR
F61 PORCELAIN WALL TILE AND GLASS ACCENT TILE, SEE D5/A-320.1
FOR MORE INFORMATION.
F62 CORNER GUARD, RE: FINISH SCHEDULE
F71 REFRIGERATOR, OF/ CI
F74 COUNTER TOP, RE: FINISH SCHEDULE
F76 WALL MOUNTED PHONE
F77 COUNTER TOP WITH METAL BRACKET
F81 STORAGE UNIT, OF/ OI
F118 COFFEE MAKER, OF/CI
F119 WATER DISPENSER, OF/CI
F120 ICE MAKER, OF/CI
F121 EXISTING COLUMN WRAP
1/4" = 1'-0"A3 CORRIDOR #100 - EAST
1/4" = 1'-0"A1 CORRIDOR #100 - NORTH
1/4" = 1'-0"A4 CORRIDOR #100 - SOUTH
1/4" = 1'-0"A5 CORRIDOR #100 - WEST
1/4" = 1'-0"A6 CLEAN ROOM 130
1/4" = 1'-0"D5 OFFICE - SOUTH
ADDENDUM 1 05/23/17 1
ADDENDUM 3 06/27/17 2
ASI 02 08/11/17 3
1/4" = 1'-0"B4 KITCHEN - EAST
3
1/4" = 1'-0"B5 CONFERENCE ROOM - SOUTH
3
10/25/17