Loading...
HomeMy WebLinkAboutB17-0092_A-401B.1_1503950455.pdfF29 F29 3' - 6" OPEN TO BEYOND E1 A-591.1 F29 F29 F62 F67 F68 F62 F62F62 F29 F68F68 F71 F74 COUNTER TOP 6' - 2" D2 A-592.1 F74 B2440 B2440 B2440 F42 OPEN TO A3 A-320.1 F14 A1 A-592.1 F29 F29 F62 F74 F77 T4896 A3 A-592.1 3' - 0" 5' - 0 1/4" EQ EQ ALIGN F24 SIM 2' - 3" A5 A-591.1 T2288 B2440 B2240 B1640 B1 A-591.1 C3 A-592.1 F29 3' - 6" F67 F68 F72F72 F74 F24 F53 6' - 0" EQ EQ D3 A-592.1 F29 F62 A1 A-592.1 SIM T4296 T4896 OPEN TO BEYOND F29 F62 F68 F68F68 F69 F29 F62 F62 F96 HOOD F29 F29 F62 HOOD F29 A3 A-320.1 F29 F14 F54 F62F62 4' - 6" 3 EQ SPACES = 2'- 0" 8" TA8 TYP TA6 T2484 TA9 W3630 A2 A-591.1 SIM F43 F29 F29 F53 BS3634 F74 F94F94 COUNTER TOP DEPTH TO BE 25" FOR BASE CABINETS AND 31" FOR ALL 30" HT WORK-SURFACES U.N.O. STYLE WIDTH OF B1836 HEIGHT OF BASE WALL CABINET DEPTH TO BE 15" U.N.O. STYLE WIDTH OF W1836 HEIGHT OF WALL AND TALL STYLE B BASE CABINET WITH DOOR & DRAWERS BD BASE CABINET WITH DRAWERS BF BASE FILE CABINET BN BASE CABINET WITHOUT DOOR & DRAWER BS ADA SINK BASE CABINET K KNEE OPENING KT KNEE OPENING WITH KEYBOARD TRAY KD KNEE OPENING WITH PENCIL DRAWER T TALL CABINET WITH DOORS TG TALL CABINET WITH SLIDING GLASS DOORS W WALL CABINET WITH DOORS WG WALL CABINET WITH SLIDING GLASS DOORS WN WALL CABINET WITH NO DRAWERS AS ADJUSTABLE SHELVES CASEWORK NOTE: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. REFER TO ELEVATIONS FOR DOOR, DRAWER, AND SHELF CONFIGURATIONS. ALL SOLID SURFACE COUNTERTOPS TO BE SS1, U.N.O. ALL PLAM COUNTERTOPS TO BE PL3, U.N.O. ALL PLAM CABINETS TO BE PL1, U.N.O. REFER TO INTERIOR FINISH DRAWINGS FOR FINISH INFORMATION. PROVIDE 4" RUBBER COVE BASE AT ALL CASEWORK KICKSPACES, U.N.O. COORDINATE ALL EQUIPMENT PLANS AND ELECTRICAL DOCUMENTS FOR LOCATION OF ALL REQUIRED GROMMETS. PROVIDE 4" HEIGHT INTEGRAL COVE BACK SPLASH WHERE BACKSPLASH IS INDICATED ON INTERIOR ELEVATIONS IN NON-HEALTHCARE HANDWASHING SINK AREAS. AT HEALTHCARE SINK AREAS, SIDE SPLASH, BACK SPLASH, AND FREE-STANDING SPLASH PANEL TO FLANK ALL SIDES OF HANDWASHING SINK. HEIGHT OF HEALTHCARE SINK TO BE ABOVE THE TOP OF THE FAUCET WATER SUPPLY LOCATION AT A MINIMUM. AT HEALTHCARE SINK LOCATIONS, SIDE, BACK, AND FREE-STANDING SPLASH PANEL TO BE OF THE SAME MATERIAL AS THE COUNTERTOP U.N.O. FIELD VERIFY DIMENSIONS OF WALL LAYOUTS BEFORE FABRICATION OF CASEWORK. PROVIDE FINISHED END PANELS AT ALL EXPOSED SIDES OF CASEWORK. ALL SOLID SURFACE OR ENGINEERED STONE COUNTERTOPS TO HAVE EASED EDGE AND BE FINISHED ON ALL EXPOSED SIDES AND BOTTOM. PROVIDE FRAMING SUPPORT FOR UNSUPPORTED OR FREE-STANDING COUNTERTOPS. SEE A4/A592.1 FOR MORE INFORMATION. PROVIDE RADIUS ON COUNTER TOP CORNERS. SEE DETAIL A6/A-592.1 FOR MORE INFORMATION. CASE WORK LEGEND INTERIOR ELEVATIONS GENERAL NOTES & LEGEND A. B. C. EQUIPMENT TAG. SEE Q SERIES FOR MEDICAL EQUIPMENT INFORMATION. TOILET ACCESSORIES TAG. SEE A-760.2 FOR TOILET ACCESSORIES INFORMATION. FINISH TAG. SEE A-600 SERIES FOR FINISH INFORMATION. E # XX# TA F29 B1834 TA5 TA6 BS3034 A2 A-592.1 F29 F29 F73 F74 F82 W2730 WN3030 W2730 B2734 F53 F71 F75 F43 F52F52 D6 A-592.1 COUNTER TOP 6' - 2" D2 A-592.1 B2440 D2440 F72 F74 F29 F95 T4296 T4296 T4296 T2496 A1 A-592.1 SIM C2 A-592.1 D1240 F74 F42F42 C2 A-592.1 D1240 F74 F62 F63F63 F29 AT ORIGINAL LOCATION MATCH PREVIOUS INSTALLATION 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant CENTRAL WING RENOVATION 7/11/2017 10:25:24 AM 15924.00 A-401B.1 AREA B ENLARGED PLANS AND INTERIOR ELEVATIONS 2017 07/11/17 PERMIT RESUBMISSION VAIL VALLEY MEDICAL CENTER 180 S. Frontage Road West, Vail, CO 81657 1/4" = 1'-0" A3 PREP AREA - EAST 1/4" = 1'-0" A2 PREP AREA - NORTH 1/4" = 1'-0" E2 WORK AREA - NORTH 1/4" = 1'-0" E4 WORK AREA - SOUTH 1/4" = 1'-0" C2 PACKING AREA'S ISLAND - EAST 1/4" = 1'-0" D1 PACKING AREA - NORTH 1/4" = 1'-0" D2 PACKING AREA - EAST 1/4" = 1'-0" D3 PACKING AREA - SOUTH 1/4" = 1'-0" E3 WORK AREA - WEST 1/4" = 1'-0" A1 PREP AREA - WEST 1/4" = 1'-0" A6 CHEMO MIXING ROOM - NORTH 1/4" = 1'-0" B3 ANTE ROOM - EAST 1/4" = 1'-0" A5 CLEAN ROOM - SOUTH 1/4" = 1'-0" B4 ANTE ROOM - SOUTH 1/4" = 1'-0"B2 ANTE ROOM - NORTH 1/4" = 1'-0"B1 ANTE ROOM - WEST 1/4" = 1'-0" E1 BREAK - WEST 1/4" = 1'-0" C1 PACKING AREA'S ISLAND - WEST 1/4" = 1'-0" D4 PACKING AREA - WEST F14 CLEAN ROOM PASS-THROUGH CHAMBER; TERRA UNIVERSAL.COM #2636-06D OR SIMILAR F24 UNDER CABINET LIGHTING, RE: ELECTRICAL F29 WALL BASE, RE: FINISH SCHEDULE F42 COUNTER MOUNTED MONITOR BRACKET. PROVIDE BLOCKING AND FRAMING TO SUPPORT MONITOR INSTALLATION. F43 P.LAM CABINETRY FUR-DOWN WITH END PANEL ON BOTH SIDES AS REQUIRED , RE: FINISH SCHEDULE. F52 INTEGRAL BACK & SIDE SPLASH, RE: FINISH SCHEDULE F53 SCRIBE PANEL, RE: FINISH SCHEDULE F54 FURNITURE/ EQUIPMENT BY OWNER F62 CORNER GUARD, RE: FINISH SCHEDULE F63 OF/ CI EQUIPMENT; FURNITURE BASE CASEWORK, FAX MACHINE, AND UPPER CABINET WITH LOCK. GC TO PROVIDE BLOCKING AS REQUIRED FOR THE UPPER CABINET F67 PARTIAL HEIGHT PARTITION WITH SOLID SURFACE WALL CAP F68 MODULAR FURNITURE, OF/ CI F69 OVERHEAD COUNTER TOP ROLLING DOOR F71 REFRIGERATOR, OF/ CI F72 EXISTING RELOCATED PRINTER, OF/ CI F73 TOE KICK TO BE CONTINUOUS F74 COUNTER TOP, RE: FINISH SCHEDULE F75 EXISTING RELOCATED FILE CABINET, OF/ OI F77 COUNTER TOP WITH METAL BRACKET F82 CABINET FILLER PANEL F94 FULL HEIGHT INTEGRAL SIDE AND BACK SPLASH IN THIS SINK AREA F95 PLASTIC LAMINATE CLAD PANELING ON FR WOOD BLOCKING; PROVIDE WALL BASE AT EXPOSED EDGES. F96 PRESSURE DEVICE, RE: MECHANICAL. COORDINATE SHARPS CONTAINER INSTALLATION AROUND PRESSURE DEVICES. 1/4" = 1'-0" C3 PACKING AREA'S ISLAND - SOUTH 1/4" = 1'-0" C4 PACKING AREA'S ISLAND - NORTH 1/4" = 1'-0" A4 PREP AREA - SOUTH 1 ADDENDUM 1 05/23/17 1 08/28/17