Loading...
HomeMy WebLinkAboutB17-0092_A-621B.1_1498849080.pdf5e86 6e86 Ke86 Je86 He86 WORK AREA 120B VEST 120A BREAK 120H CLEAN ROOM 120G ANTE ROOM 120F PREP AREA 120D CHEMO MIXING ROOM 120E PACKING AREA 120C CG CG CG CG CG CG CG CG CG CG CG CG CG CG FIN07 CG NEW SECTION OF WALL AND WALLBASE FINISH TO MATCH EXISTING ADJACENT. FINISH SYMBOL LEGEND P_ FINISH EXTENTS WALL PROTECTION, WP1 CORNER GUARD (CG1) FINISH TAG ROOM NAME #### XX# ROOM TAG WITH FINISH INDICATOR CPT1 PFT1 LVT1 SV1 CPT2 SV2 SV3 SV4 1. PAINT ALL GYP. WALLS P1 U.N.O. 2. ALL PAINT FINISHES TO BE SATIN: (2) COATS OVER (1) COAT PRIMER, U.N.O. 3. ALL FLOOR FINISH CHANGES TO BE AT CENTER OF DOORWAYS U.N.O. NO SEAMS INFRONT OF DOOR WAYS. 4. REFER TO INTERIOR ELEVATIONS FOR ADDITIONAL WALL FINISH INFORMATION AND EXTENT OF FINISHES. 5. ALL RUBBER REDUCER STRIPS AT FLOOR TRANSITIONS TO BE ADA PROFILE. COLOR TO MATCH RUBBER BASE, U.O.N. 6. ALL EXPOSED GRILLS, REGISTERS, DIFFUSERS, ACCESS PANELS, AND SPECIAL DOORS TO BE PAINTED TO MATCH THE SURFACE ON WHICH THEY OCCUR U.N.O. 7. ALL PAINT COLORS TO BE MOCKED-UP ON-SITE ON ONE ENTIRE FULL HEIGHT WALL FOR OWNER APPROVAL PRIOR TO ORDERING PRODUCT. 8. ALL GYP. CEILINGS TO BE PAINTED; PROVIDE MOLD RESISTANT EPOXY PAINT AT CEILINGS IN TOILET AND SHOWER ROOMS AND WET AREAS AS NOTED. 9. ALL CEILING GRID WALL ANGLES TO BE SEALANT AT WALL WHERE PAINT OCCURS. 10. FINISH AND PAINT ALL SIDES OF SOFFIT OR GYP. CEILING. REFER TO REFLECTED CEILING PLAN FOR CEILING PAINT ACCENTS. WHEN ACCENT PAINT IS CALLED OUT ON SOFFIT- ALL SIDES, FACES, EDGES, ETC TO RECIEVE ACCENT PAINT. 11. ALL SHEET VINYL SEAMS TO BE HEAT WELDED. 12. ALL CASEWORK/MILLWORK COUNTERTOPS WITH SINKS TO BE SOLID SURFACE (SS) U.N.O. 13. 4" HIGH RUBBER BASE WHERE SCHEDULED, U.O.N. 14. WINDOW TREATMENTS: EXTERIOR WINDOWS REQUIRE MINI-BLINDS. REFER TO FINISH LEGEND FOR FURTHER INFO. 15. PROVIDE GROUT SAMPLES FOR ARCHITECT'S SELECTION. GROUT IN WET AREAS TO BE EPOXY. 16. PAINT ALL INTERIOR METAL PT2. SEE SPECIFICATIONS FOR PAINT FINISH. 17. WHERE NOTED, ACROVYN SHEET WALL PRETECTION TO BE 48" AFF. 18. WHERE NOTED, 2" BRUSHED STANLESS STEEL CORNER GURARDS TO BE 48" AFF. CORNER GUARDS TO BE GLUED AND NOT SCREWED INTO DRYWALL. 19. FURNITURE SHOWN DASHED, TO BE PURCHASED BY OWNER. 20. EXISTING WALLCOVERING TO BE REMOVED U.O.N. EXPOSED WALLS TO BE SKIM COATED SMOOTH AND PREPARED TO BE PAINTED NEW. 21. EXISTING CHAIR RAIL TO REMAIN, U.O.N. AND PROTECTED FREE FROM DIRT AND DAMAGE DURING INTERIOR RENOVATION. 22. EXISTING WOOD WALL BASE TO REMAIN U.O.N. AND PROTECTED FREE FROM DIRT AND DAMAGE DURING INTERIOR RENOVATION. 23. REFER TO REFLECTED CEILING PLANS FOR EXTENT OF NEW CEILING TILE AND GRID, NEW CEILING TILE AND/OR GRID TO MATCH EXISTING, AND EXISTING CEILING TILE AND/OR GRID TO REMAIN. GENERAL FINISH NOTES 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant CENTRAL WING RENOVATION 3/10/2017 3:38:36 PM 15924.00 A-621B.1 ENLARGED FINISH FLOOR PLAN - AREA B 2017 03/10/17 PERMIT VAIL VALLEY MEDICAL CENTER 180 S. Frontage Road West, Vail, CO 81657 1/4" = 1'-0" A3 ENLARGED FLOOR PLAN - AREA B 02 - 600 - FINISH LEGEND FINISH CODE DESCRIPTION FINISH TYPE MANUFACTURER SERIES/PATTERN NUMBER COLOR SIZE FINISH REMARKS CEILING FINISHES ACT1 ACOUSTICAL CEILING TILE CEILING FINISHES ARMSTRONG CLEAN ROOM VL 868 WHITE 2 X 2 X 5/8 UNPERFORATED WITH CLEAN ROOM GRID ACT2 ACOUSTICAL CEILING TILE CEILING FINISHES ARMSTRONG CIRRUS 574 WHITE 2 X 2 X 15/16 PRELUDE GRID GYP GYPSUM CEILING CEILING FINISHES PT1 FLAT FINISH FLOOR FINISHES CPT1 CARPET FLOOR FINISHES SHAW UNEARTHED/AGATE 5T015 14740 ZIRCON 18X36 MONOLITHIC INSTALLATION METHOD, @ COMMON AREAS CPT2 CARPET FLOOR FINISHES SHAW UNEARTHED/AGATE 5T015 14515 GALENA 18X36 MONOLITHIC INSTALLATION METHOD, @ PRIVATE OFFICES LVT1 LUXURY VINYL TILE FLOOR FINISHES SHAW HARD SURFACE SURFACE 0515V CASHMERE 18X36 @ ADMIN BREAK ROOM PFT1 PORCELAIN FLOOR TILE FLOOR FINISHES ARIZONA NU TRAVETINE CREAM, MATTE 18X18 GROUT SV1 SHEET VINYL FLOOR FINISHES SHAW HARD SURFACE NATURALIFE 09446 ANTIQUE MAHOGANY 72" WIDE ROLLS HEAT WELDED SEAMS SV2 SHEET VINYL FLOOR FINISHES SHAW HARD SURFACE NATURALIFE 09572 STAINED WALNUT 72" WIDE ROLLS HEAT WELDED SEAMS SV3 SHEET VINYL FLOOR FINISHES ARMSTRONG MEDITONE H8319 SAND LIGHT HEAT WELDED SEAMS SV4 SHEET VINYL FLOOR FINISHES SHAW HARD SURFACE NATURALIFE TBD TBD 72" WIDE ROLLS HEAT WELDED SEAMS MILLWORK FINISHES PL1 PLASTIC LAMINATE MILLWORK FINISHES WILSONART 7965K-12 WALNUT HEIGHTS VERTICAL SURFACES, AND WOOD CHAIR RAIL TO MATCH PL2 PLASTIC LAMINATE MILLWORK FINISHES NEVAMAR RK2001T CLASSIC ROCK NON WET AREAS HORIZONTAL SURFACES SS1 SOLID SURFACE MILLWORK FINISHES CORIAN COTTAGE LANE 1/2" THK MISCELLANEOUS CC CUBICAL CURTAIN MISCELLANEOUS TBD CCT1 CUBICLE CURTAIN TRACK MISCELLANEOUS ON THE RIGHT TRACK WALL BASE FINISHES INT INTEGRAL WALL BASE FINISHES TO MATCH ADJACENT FLR FINISH 4" RB1 RUBBER BASE WALL BASE FINISHES JOHNSONITE RUBBER COVE BASE 76 CINNAMON 4" RB2 RUBBER BASE WALL BASE FINISHES JOHNSONITE RUBBER COVE BASE 167 FUDGE 4" WB1 WOOD BASE WALL BASE FINISHES CUSTOM FINISH TO MATCH EXISTING 4" AT ADMIN WALL FINISHES CR1 CHAIR RAIL WALL FINISHES CUSTOM FINISH TO MATCH EXISTING @ ADMIN, MTD AFF TO MATCH EXISTING EPT1 EPOXY PAINT WALL FINISHES SHERWIN WILLIAMS SW6364 EGG WHITE GWT1 GLASS WALL TILE WALL FINISHES CROSSVILLE STUDIOS ELEMENT/POSH GLASS EARTH RANDOM STRIP 2 X 6 RANDOM STRIP MOSAIC, STACKED (2) HIGH PT1 PAINT WALL FINISHES SHERWIN WILLIAMS SW6364 EGG WHITE GENERAL PAINT PT2 PAINT WALL FINISHES SHERWIN WILLIAMS SW 6106 KILM BEIGE ACCENT BELOW CHAIR RAIL AND DOOR TRIM PWT1 PORCELAIN WALL TILE WALL FINISHES DALTILE MODERN DIMENSION 0761 URBAN PUTTY 4.25X12.75 SEMI GLOSS GROUT TBD, STACKED JOINTS WALL GUARDS CG CORNER GUARD WALL GUARDS STAINLESS STEEL (SS) BRUSHED SS 48' H GLUED ON WP1 SHEET WALL PROTECTION WALL GUARDS ACROVYN ACROVYN 4000 PARCHMENT 48" H WINDOWS W1 WINDOW TREATMENTS WINDOWS HORIZANTAL MINI BLINDS LIGHTBLOCKER ALUMINUM 1" ALUMINUM <02 - 600 - FINISH SCHEDULE> Room Number Room Name Floor Finish Base Finish Wall Finish Casework Ceiling Finish Remarks N E S W LEVEL 1 100 CORRIDOR CPT1 RB1 PT1 PT1 PT1 PT1 REFER TO RCP DWG 100A CLOSET CPT1 RB1 PT1 PT1 PT1 PT1 REFER TO RCP DWG 100B CORRIDOR 101 STAFF RECESS CPT1 RB1 PT1 PT1 PT1 PT1 REFER TO RCP DWG 102 RECEPTION CPT1 EXTG PT1 PT1 PT1 PT1 REFER TO RCP DWG 104 TLT PFT PTB PWT1,2/EPT1 PWT1,2/EPT1 PWT1,2/EPT1 PWT1,2/EPT1 GYP 104A CONTROL SV1 INT PT1 PT1 PT1 PT1 PL2/PL1 ACT2 PL2 COUNTERTOPS/PL1 VERTICAL SURFACES 104B HOT LAB SV1 INT PT1 PT1 PT1 PT1 SS/PL1 ACT2 SS1 CONTERTOPS/PL1 VERTICAL SURFACES 104C PT TOILET PFT1 PTB PWT/EPT PWT/EPT PWT/EPT PWTEPT GYP 104D INJECTION SV1 INT PT1 PT1 PT1 PT1 ACT2 105A NUCLEAR MEDICINE CAMERA SV1 INT PT1 SWP1/PT1 SWP1/PT1 PT1 SS1/PL1 ACT2 SS1 CONTERTOPS/PL1 VERTICAL SURFACES 105B SOILED HOLD SV3 INT EPT1 EPT1 EPT1 EPT1 GYP 105C ESR SV3 INT EPT1 EPT1 EPT1 EPT1 GYP 106 OFFICE CPT2 EXTG PT1 PT1 PT1 PT1 REFER TO RCP DWG 106A SPRINKLER ROOM NIC 108 STORAGE CPT1 RB1 PT1 PT1 PT1 PT1 REFER TO RCP DWG 109 CORRIDOR CPT1 EXTG/RB1 PT1/CR PT1/CR PT1/CR PT1/CR REFER TO RCP DWG 110 BIOMED / FACILITIES NIC 111 OFFICE CPT2 RB1 PT1 PT1 PT1 PT1 REFER TO RCP DWG 112 OFFICE CPT2 RB1 PT1 PT1 PT1 PT1 REFER TO RCP DWG 113 ULTRASOUND SV1 INT SWP1/PT1 SWP/PT1 SWP/PT1 SWP/PT1 SS1/PL1 ACT2 SS1 CONTERTOPS/PL1 VERTICAL SURFACES 114 OFFICE CPT2 EXTG PT1 PT1 PT1 PT1 REFER TO RCP DWG 116A OFFICE CPT2 WB PT1 PT1 PT1 PT1 REFER TO RCP DWG 116B OFFICE CPT2 WB PT1 PT1 PT1 PT1 REFER TO RCP DWG 117 OFFICE CPT2 EXTG PT1 PT1 PT1 PT1 REFER TO RCP DWG 118 CORRIDOR CPT1 EXT PT1 PT1 PT1 PT1 REFER TO RCP DWG 118A STORAGE CPT1 RB1 PT1 PT1 PT1 PT1 REFER TO RCP DWG 119 OFFICE CPT2 EXTG PT1 PT1 PT1 PT1 REFER TO RCP DWG 120 OFFICE CPT2 EXTG PT1 PT1 PT1 PT1 REFER TO RCP DWG 120A VEST SV1 INT PT1 PT1 PT1 PT1 ACT2 120B WORK AREA SV1 INT PT1 PT1 PT1 PT1 PL1/PL2 ACT2 PL2 COUNTERTOPS/PL1 VERTICAL SURFACES 120C PACKING AREA SV1 INT PT1 PT1 PT1 PT1 PL1/PL2 ACT2 PL2 COUNTERTOPS/PL1 VERTICAL SURFACES 120D PREP AREA SV1 INT PT1 PT1 PT1 PT1 ACT2 120E CHEMO MIXING ROOM SV1 INT PT1 PT1 PT1 PT1 SS1/PL1 GYP SS1 CONTERTOPS/PL1 VERTICAL SURFACES 120F ANTE ROOM SV1 INT PT1 PT1 PT1 PT1 SS1/PL1 GYP SS1 CONTERTOPS/PL1 VERTICAL SURFACES 120G CLEAN ROOM SV1 INT PT1 PT1 PT1 PT1 GYP 120H BREAK SV1 INT PT1 PT1 PT1 PT1 SS1/PL1 REFER TO RCP DWG SS1 CONTERTOPS/PL1 VERTICAL SURFACES 120I NON-STERILE COMPOUDING SEE BREAK ROOM, #120H 121 OFFICE CPT2 EXTG PT1 PT1 PT1 PT1 REFER TO RCP DWG 122 OFFICE CPT2 WB PT1 PT1 PT1 PT1 REFER TO RCP DWG 123 CONFERENCE ROOM CPT2 WB1 PT1/PT2/CR PT1/PT2/CR PTPT1/PT2/CR PT1/PT2/CR REFER TO RCP DWG 125 COPY CPT1 EXTG PT1 PT1 PT1 PT1 PL1/PL2 REFER TO RCP DWG PL2 COUNTERTOPS/PL1 VERTICAL SURFACES 126 OFFICE CPT2 EXT PT1 PT1 PT1 PT1 REFER TO RCP DWG 127 BREAK LVT1 RB1 PT1 PT1 PT1 PT1 REFER TO RCP DWG 127A STORAGE LVT1 RB1 PT1 PT1 PT1 PT1 REFER TO RCP DWG 128A OFFICE CPT2 RB1 PT1 PT1 PT1 PT1 REFER TO RCP DWG 128B OFFICE CPT2 RB1 PT1 PT1 PT1 PT1 REFER TO RCP DWG 128C OFFICE CPT2 RB1 PT1 PT1 PT1 PT1 REFER TO RCP DWG LEVEL 2 120J OFFICE SV2 RB2 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 REFER TO RCP DWG 120K OFFICE SV2 RB2 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 REFER TO RCP DWG 120L EXAM SV2 RB2 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 REFER TO RCP DWG 120M EXAM SV2 RB1 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 REFER TO RCP DWG 120N EXAM SV2 RB2 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 REFER TO RCP DWG 120O BREAK SV2 RB2 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 REFER TO RCP DWG 120P EXAM SV2 RB2 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 REFER TO RCP DWG 120Q WAIT CPT2 PT1 PT1 PT1 PT1 PT1 REFER TO RCP DWG 120R RECEPTION CPT2 PT1 PT1 PT1 PT1 PT1 REFER TO RCP DWG 120T CORRIDOR SV2 RB2 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 REFER TO RCP DWG 120U OFFICE CPT2 RB2 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 REFER TO RCP DWG 120V TLT PFT1 PWT1 PWT1,2/EPT1 PWT1,2/EPT1 PWT1,2/EPT1 PWT1,2/EPT1 REFER TO RCP DWG 120W LARGE EXAM ROOM SV2 WP1/PT1 PT1 WP1/PT1 WP1/PT1 WP1/PT1 SS1/PL1 REFER TO RCP DWG SS1 CONTERTOPS/PL1 VERTICAL SURFACES 120Y STORAGE SV2 PT1 PT1 PT1 PT1 PT1 REFER TO RCP DWG 120YY OFFICE SV2 PT1 PT1 PT1 PT1 PT1 REFER TO RCP DWG 121Y MEETING/WORK LVT1 RB1 PT PT PT PT ACT1 02 - 100 - KEYNOTE LEGEND - FINISH FLOOR PLAN FIN07 FLOOR FINISH TRANSITION. 06/30/17