Loading...
HomeMy WebLinkAboutB17-0092_A-621B.1_1508947737.pdf5e86 6e86 WORK AREA 120B VEST 120A BREAK 120H CLEAN ROOM 120G ANTE ROOM 120F PREP AREA 120DCHEMO MIXING ROOM 120E PACKING AREA 120C C G C G C G C G C G C G C G C G C G C G C G C G C G C G FIN07 CG NEW SECTION OF WALL AND WALLBASE FINISH TO MATCH EXISTING ADJACENT. FINISH SYMBOL LEGEND P_ FINISH EXTENTS WALL PROTECTION, WP1 CORNER GUARD (CG1) FINISH TAG ROOM NAME #### XX# ROOM TAG WITH FINISH INDICATOR CPT1 PFT1 LVT1 SV1 CPT2 SV2 SV3 SV4 SV5 SV6 1. PAINT ALL GYP. WALLS P1 U.N.O. 2. ALL PAINT FINISHES TO BE SATIN: (2) COATS OVER (1) COAT PRIMER, U.N.O. 3. ALL FLOOR FINISH CHANGES TO BE AT CENTER OF DOORWAYS U.N.O. NO SEAMS INFRONT OF DOOR WAYS. 4. REFER TO INTERIOR ELEVATIONS FOR ADDITIONAL WALL FINISH INFORMATION AND EXTENT OF FINISHES. 5. ALL RUBBER REDUCER STRIPS AT FLOOR TRANSITIONS TO BE ADA PROFILE. COLOR TO MATCH RUBBER BASE, U.O.N. 6. ALL EXPOSED GRILLS, REGISTERS, DIFFUSERS, ACCESS PANELS, AND SPECIAL DOORS TO BE PAINTED TO MATCH THE SURFACE ON WHICH THEY OCCUR U.N.O. 7. ALL PAINT COLORS TO BE MOCKED-UP ON-SITE ON ONE ENTIRE FULL HEIGHT WALL FOR OWNER APPROVAL PRIOR TO ORDERING PRODUCT. 8. ALL GYP. CEILINGS TO BE PAINTED PT3; PROVIDE MOLD RESISTANT EPOXY PAINT AT CEILINGS IN TOILET AND SHOWER ROOMS AND WET AREAS AS NOTED. 9. ALL CEILING GRID WALL ANGLES TO BE SEALANT AT WALL WHERE PAINT OCCURS. 10. FINISH AND PAINT ALL SIDES OF SOFFIT OR GYP. CEILING. REFER TO REFLECTED CEILING PLAN FOR CEILING PAINT ACCENTS. WHEN ACCENT PAINT IS CALLED OUT ON SOFFIT- ALL SIDES, FACES, EDGES, ETC TO RECIEVE ACCENT PAINT. 11. ALL SHEET VINYL SEAMS TO BE HEAT WELDED. 12. ALL CASEWORK/MILLWORK COUNTERTOPS WITH SINKS TO BE SOLID SURFACE (SS) U.N.O. 13. 4" HIGH RUBBER BASE WHERE SCHEDULED, U.O.N. 14. PROVIDE GROUT SAMPLES FOR ARCHITECT'S SELECTION. GROUT IN WET AREAS TO BE EPOXY. 15. WHERE NOTED, ACROVYN SHEET WALL PROTECTION TO BE 48" AFF. 16. WHERE NOTED, 2" BRUSHED STANLESS STEEL CORNER GURARDS TO BE 48" AFF. CORNER GUARDS TO BE GLUED AND NOT SCREWED INTO DRYWALL. 17. FURNITURE SHOWN DASHED, TO BE PURCHASED BY OWNER. 18. EXISTING WALLCOVERING TO BE REMOVED U.O.N. EXPOSED WALLS TO BE SKIM COATED SMOOTH AND PREPARED TO BE PAINTED NEW. 19. EXISTING CHAIR RAIL TO BE DEMOLISHED. EXPOSED WALL TO BE PREPARED TO RECEIVE SCHEDULED FINISH. 20. EXISTING WOOD WALL BASE TO DEMOLISHED. EXPOSED WALL TO BE PREPARED TO RECEIVE SCHEDULED FINISH. 21. REFER TO REFLECTED CEILING PLANS FOR EXTENT OF WORK. GENERAL FINISH NOTES 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant CENTRAL WING RENOVATION 8/17/2017 10:18:09 AM15924.00 A-621B.1 ENLARGED FINISH FLOOR PLAN - AREA B 2017 07/11/17PERMIT RESUBMISSION VAIL VALLEY MEDICAL CENTER 180 S. Frontage Road West, Vail, CO 81657 1/4" = 1'-0"A3 ENLARGED FLOOR PLAN - AREA B 02 - 600 - FINISH LEGEND FINISH CODE DESCRIPTION FINISH TYPE MANUFACTURER SERIES/PATTERN NUMBER COLOR SIZE FINISH REMARKS CEILING FINISHES ACT1 ACOUSTICAL CEILING TILE CEILING FINISHES ARMSTRONG CLEAN ROOM VL 868 WHITE 2 X 2 X 5/8 UNPERFORATED WITH CLEAN ROOM GRID ACT2 ACOUSTICAL CEILING TILE CEILING FINISHES ARMSTRONG CIRRUS 574 WHITE 2 X 2 X 15/16 PRELUDE GRID GYP/PT3 GYPSUM CEILING CEILING FINISHES PT3 TO BE SW7104/COTTON WHITE EPOXY PAINT FINISH AT TOILET ROOMS FLOOR FINISHES CPT1 CARPET FLOOR FINISHES SHAW UNEARTHED/AGATE 5T015 14740 ZIRCON 18X36 MONOLITHIC INSTALLATION METHOD, @ COMMON AREAS CPT2 CARPET FLOOR FINISHES SHAW UNEARTHED/AGATE 5T015 14515 GALENA 18X36 MONOLITHIC INSTALLATION METHOD, @ PRIVATE OFFICES LVT1 LUXURY VINYL TILE FLOOR FINISHES SHAW HARD SURFACE SURFACE 0515V BOULDER 18X36 @ ADMIN BREAK ROOM PFT1 PORCELAIN FLOOR TILE FLOOR FINISHES ARIZONA NU TRAVETINE CREAM, MATTE 18X18 GROUT SV1 SHEET VINYL FLOOR FINISHES SHAW HARD SURFACE NATURALIFE 09446 ANTIQUE MAHOGANY 72" WIDE ROLLS HEAT WELDED SEAMS-WEL09446 SV2 SHEET VINYL FLOOR FINISHES SHAW HARD SURFACE NATURALIFE 09572 STAINED WALNUT 72" WIDE ROLLS HEAT WELDED SEAMS-WEL 1823 SV3 SHEET VINYL FLOOR FINISHES ARMSTRONG MEDITONE H5319 SAND LIGHT 72" WIDE ROLLS HEAT WELDED SEAMS SV4 SHEET VINYL FLOOR FINISHES SHAW HARD SURFACE NATURALIFE 08311 APPLE 72" WIDE ROLLS HEAT WELDED SEAMS-WEL 7691 SV5 SHEET VINYL FLOOR FINISHES TEKNOFLOR TIMBERSCAPES 51023 GOLDEN PECAN 72" WIDE ROLLS SV6 SHEET VINYL FLOOR FINISHES TEKNOFLOR TIMBERSCAPES 53903 COUMAROU 72" WIDE ROLLS MILLWORK FINISHES CR1 CHAIR RAIL MILLWORK FINISHES CUSTOM STAIN TO MATCH WILSONART 7971K-12/UPTOWN WALNUT AT ADMIN CONFERENCE ROOM PL1 PLASTIC LAMINATE MILLWORK FINISHES WILSONART 7965K-12 WALNUT HEIGHTS VERTICAL SURFACES, AND WOOD CHAIR RAIL TO MATCH PL2 PLASTIC LAMINATE MILLWORK FINISHES NEVAMAR RK2001T CLASSIC ROCK NON WET AREAS HORIZONTAL SURFACES PL3 PLASTIC LAMINATE MILLWORK FINISHES WILSONART 7971K-12 UPTOWN WALNUT VERTICAL CASEWORK AT ADMIN CONFERENCE ROOM SS1 SOLID SURFACE MILLWORK FINISHES CORIAN COTTAGE LANE 1/2" THK MISCELLANEOUS CC CUBICAL CURTAIN MISCELLANEOUS TBD CCT1 CUBICLE CURTAIN TRACK MISCELLANEOUS ON THE RIGHT TRACK ST1 DOOR STAIN MISCELLANEOUS MARSHFIELD STAIN TO MATCH VT INDUSTRIES RAVINE RA07 NEW DOORS IN ADMIN AREA WALL BASE FINISHES INT INTEGRAL WALL BASE FINISHES TO MATCH ADJACENT FLR FINISH 4" RB1 RUBBER BASE WALL BASE FINISHES JOHNSONITE RUBBER COVE BASE 76 CINNAMON 4" ADMIN AREA CORRIDORS RB2 RUBBER BASE WALL BASE FINISHES JOHNSONITE RUBBER COVE BASE 167 FUDGE 4" RB3 RUBBER BASE WALL BASE FINISHES JOHNSONITE RUBBER COVE BASE 49 BEIGE 4" ADMIN AREA PRIVATE OFFICES WB1 WOOD BASE WALL BASE FINISHES CUSTOM STAIN TO MATCH WILSONART 7971K-12/UPTOWN WALNUT 4" AT ADMIN CONFERENCE ROOM WALL FINISHES EPT1 EPOXY PAINT WALL FINISHES SHERWIN WILLIAMS SW6364 EGG WHITE GWT1 GLASS WALL TILE WALL FINISHES CROSSVILLE STUDIOS ELEMENT/POSH GLASS EARTH RANDOM STRIP 2 X 6 RANDOM STRIP MOSAIC, STACKED (2) HIGH PT1 PAINT WALL FINISHES SHERWIN WILLIAMS SW6364 EGG WHITE GENERAL PAINT PT2 PAINT WALL FINISHES SHERWIN WILLIAMS SW 6106 KILM BEIGE ACCENT BELOW CHAIR RAIL AND DOOR TRIM PT4 PAINT WALL FINISHES SHERWIN WILLIAMS SW7633 TAUPE TONE DOOR AND WINDOW FRAMES AND TRIM PWT1 PORCELAIN WALL TILE WALL FINISHES DALTILE MODERN DIMENSION 0761 URBAN PUTTY 4.25X12.75 SEMI GLOSS GROUT TBD, STACKED JOINTS WALL GUARDS CG CORNER GUARD WALL GUARDS STAINLESS STEEL (SS) BRUSHED SS 48' H GLUED ON WP1 SHEET WALL PROTECTION WALL GUARDS ACROVYN ACROVYN 4000 PARCHMENT 48" H WINDOWS W1 WINDOW TREATMENTS WINDOWS BALI CUSTOMISER 034/ALUMINUM ALUMINUM 1" MSA W2 WINDOW TREATMENTS WINDOWS HUNTER DOUGLAS EVERWOOD TRUGRAIN MOCHA 2" EXTERIOR WINDOWS AT ADMIN AREA <02 - 600 - FINISH SCHEDULE> Room Number Room Name Floor Finish Base Finish Wall Finish Casewor k Win dow s Remarks N E S W LEVEL 1 01 CORRIDOR CPT1 RB1 PT1 PT1 PT1 PT1 PL1 COUNTERTOPS 03 CORRIDOR SV3 RB1 REFINISH CORRIDOR TO MATCH EXISTING FINISHES. 100 CORRIDOR SV3 RB1 PT1 PT1 PT1 PT1 100A CLOSET SV3 RB1 PT1 PT1 PT1 PT1 100B CORRIDOR NIC 101 OFFICE CPT1 RB1 PT1 PT1 PT1 PT1 102 RECEPTION CPT1 RB1 PT1 PT1 PT1 PT1 102A TRAUMA CPT2 RB3 103 SOCIAL WORKERS CPT2 RB3 104 TLT PFT1 PTB PWT1,GWT1/EP T1 PWT1,GWT1/E PT1 PWT1,GWT1/EP T1 PWT1,GWT1/EPT 1 104A CONTROL SV1 INT PT1 PT1 PT1 PT1 PL2/PL1 PL2 COUNTERTOPS/PL1 VERTICAL SURFACES 104B HOT LAB SV1 INT PT1 PT1 PT1 PT1 SS1/PL1 SS1 CONTERTOPS/PL1 VERTICAL SURFACES 104C PT TOILET PFT1 PTB PWT1,GWT1/EP T1 PWT1,GWT1/E PT1 PWT1,GWT1/EP T1 PWT1,GWT1/EPT 1 104D INJECTION SV1 INT PT1 PT1 PT1 PT1 104E ESR / SOILED HOLD SV3 INT EPT1/WP1 EPT1/WP1 EPT1/WP1 EPT1/WP1 104F OFFICE CPT2 RB3 105A NUCLEAR MEDICINE CAMERA SV1 INT PT1 SWP1/PT1 SWP1/PT1 PT1 SS1/PL1 SS1 CONTERTOPS/PL1 VERTICAL SURFACES 106 OFFICE CPT2 RB1 PT1 PT1 PT1 PT1 W2 106A SPRINKLER ROOM NIC 108 STORAGE CPT1 RB1 PT1 PT1 PT1 PT1 110 BIOMED / FACILITIES NIC 111 OFFICE CPT2 RB1 PT1 PT1 PT1 PT1 111A EVS STORAGE SV3 RB1 112 OFFICE CPT2 RB1 PT1 PT1 PT1 PT1 113 MED STAFF CPT2 RB3 114 OFFICE CPT2 RB1 PT1 PT1 PT1 PT1 W2 PL1 COUNTERTOPS 115 OFFICE CPT1 RB1 PT1 PT1 PT1 PT1 116A OFFICE CPT2 RB1 PT1 PT1 PT1 PT1 117A OFFICE/RECEPT CPT2 RB1 PT1 PT1 PT1 PT1 117B OFFICE CPT2 RB1 PT1 PT1 PT1 PT1 117C OFFICE CPT2 RB1 PT1 PT1 PT1 PT1 W2 117E BREAK SV1 INT PT1 PT1 PT1 PT1 SS1/PL1 SS1 CONTERTOPS/PL1 VERTICAL SURFACES 117F CORRIDOR CPT1 RB1 PT1 PT1 PT1 PT1 118 CORRIDOR CPT1 RB1 PT1 PT1 PT1 PT1 118A STORAGE CPT1 RB1 PT1 PT1 PT1 PT1 119 OFFICE CPT2 RB1 PT1 PT1 PT1 PT1 W2 120A VEST SV1 INT PT1 PT1 PT1 PT1 120B WORK AREA SV1 INT PT1 PT1 PT1 PT1 PL1/PL2 PL2 COUNTERTOPS/PL1 VERTICAL SURFACES 120C PACKING AREA SV1 INT PT1 PT1 PT1 PT1 PL1/PL2 PL2 COUNTERTOPS/PL1 VERTICAL SURFACES 120D PREP AREA SV1 INT PT1 PT1 PT1 PT1 120E CHEMO MIXING ROOM SV4 INT PT1 PT1 PT1 PT1 SS1/PL1 SS1 CONTERTOPS/PL1 VERTICAL SURFACES 120F ANTE ROOM SV1,SV4 INT PT1 PT1 PT1 PT1 SS1/PL1 SS1 CONTERTOPS/PL1 VERTICAL SURFACES 120G CLEAN ROOM SV4 INT PT1 PT1 PT1 PT1 120H BREAK SV1 INT PT1 PT1 PT1 PT1 SS1/PL1 SS1 CONTERTOPS/PL1 VERTICAL SURFACES 120I NON-STERILE COMPOUNDING SEE BREAK ROOM, #120H 121 OFFICE CPT2 RB1 PT1 PT1 PT1 PT1 122 OFFICE CPT2 RB1 PT1 PT1 PT1 PT1 123 CONFERENCE ROOM CPT2 RB1 PT1/PT2/CR1 PT1/PT2/CR1 PTPT1/PT2/CR1 PT1/PT2/CR1 125 COPY CPT1 RB1 PT1 PT1 PT1 PT1 PL1/PL2 PL2 COUNTERTOPS/PL1 VERTICAL SURFACES 126 OFFICE CPT2 RB1 PT1 PT1 PT1 PT1 127 BREAK LVT1 RB1 PT1 PT1 PT1 PT1 127A STORAGE LVT1 RB1 PT1 PT1 PT1 PT1 128A OFFICE CPT2 RB1 PT1 PT1 PT1 PT1 128B OFFICE CPT2 RB1 PT1 PT1 PT1 PT1 128C OFFICE CPT2 RB1 PT1 PT1 PT1 PT1 130 CLEAN STORAGE SV3 RB1 WP1/PT1 WP1/PT1 WP1/PT1 WP1/PT1 FILM ON EXISTING WINDOWS 131 STORAGE SV3 RB1 WP1/PT1 WP1/PT1 WP1/PT1 WP1/PT1 FILM ON EXISTING WINDOWS LEVEL 2 120J OFFICE SV2 RB2 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 W1 120K OFFICE SV2 RB2 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 W1 120L EXAM SV2 RB2 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 W1 120M EXAM SV2 RB2 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 W1 120N EXAM SV2 RB2 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 W1 120O BREAK SV2 RB2 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 W1 120P EXAM SV2 RB2 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 W1 120Q WAIT CPT2 RB2 PT1 PT1 PT1 PT1 120R RECEPTION CPT2 RB2 PT1 PT1 PT1 PT1 120T CORRIDOR SV2 RB2 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 120U OFFICE CPT2 RB2 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 KEYNOTE #5 120V PT TLT PFT1 PWT1 PWT1,2/EPT1 PWT1,2/EPT1 PWT1,2/EPT1 PWT1,2/EPT1 120W LARGE EXAM ROOM SV2 RB2 PT1 WP1/PT1 WP1/PT1 WP1/PT1 SS1/PL1 SS1 CONTERTOPS/PL1 VERTICAL SURFACES 120Y STORAGE SV2 PT1 PT1 PT1 PT1 PT1 120YY OFFICE SV2 PT1 PT1 PT1 PT1 PT1 121Y MEETING/WORK LVT1 RB1 PT1 PT1 PT1 PT 201A ENTRY 201B WORK SV1 RB2 PT1 PT1 PT1 PT1 CEILING TO BE ACT1 201B WORK SV1 RB2 PT1 PT1 PT1 PT1 PL1/PL2 PL2 COUNTERTOPS/PL1 VERTICAL SURFACES, CEILING TO BE ACT1 201C SLEEP SV1 RB2 PT1 PT1 PT1 PT1 PL1/PL2 PL2 COUNTERTOPS/PL1 VERTICAL SURFACES, CEILING TO BE ACT1 201D ULTRASOUND SV1 RB2 WP1/PT1 WP1/PT1 WP1/PT1 WP1/PT1 CEILING TO BE ACT1 201E SLEEP SV1 RB2 PT1 PT1 PT1 PT1 CEILING TO BE ACT1 02 - 100 - KEYNOTE LEGEND - FINISH FLOOR... FIN07 FLOOR FINISH TRANSITION ADDENDUM 1 05/23/17 1 ADDENDUM 3 06/27/17 2 ASI 03 08/16/17 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 10/25/17