Loading...
HomeMy WebLinkAboutB17-0092_AD101B.1_1498849080.pdf5e86 6e86 Ke86 Je86 He86 (E) GIFT STORE (E) CORR (E) VEST (E) STOR (E) OFFICE (E) FIRE PANEL (E) PHARMACY (E) LOBBY D03 D03 D32 2' - 10 3/4" GENERAL NOTES EXISTING SYSTEMS, LIFE SAFETY FEATURES, ETC., ARE TO REMAIN OPERATIONAL DURING ALL HOURS OF THE DAY. REGULAR CONSTRUCTION WORK HOURS ARE FROM 7:00 AM AND 5:30 PM. ALL SHUT DOWNS OR MODIFICATIONS WILL BE AT NIGHT OR ON WEEKENDS. ADDITIONALLY, NO SYSTEM IS TO BE SHUT DOWN WITHOUT FIRST COORDINATING WITH VVMC AND OBTAINING AN APPROVED METHOD OF PROCEDURE. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. PATCH AND REFINISH AREAS INPACTED BY CONSTRUCTION. FINAL CONDITION TO BE LIKE-NEW. PROVIDE CORNER OR WALL GUARDS AT ALL EXPOSED CORNERS IN PATIENT AREAS ALL LIFE SAFETY SYSTEMS AND FIRE RATED ASSEMBLIES TO BE MAINTAINED PER LIFE SAEFTY CODE REQUIREMENTS AT ALL TIMES. SEE LS SERIES FOR MORE INFORMATION. DOORS TO BE LOCATED 6" FROM ADJACENT WALL ON HINGE SIDE UNLESS NOTED OTHERWISE SALVAGE ALL MEDICAL EQUIPMENT, CONFIRM NEW LOCATION WITH OWNER PROVIDE COORDINATION WALK WITH OWNER AND ARCHITECT TO CONFIRM ALL BACK BOXES AND WALL DEVICE LOCATION BEFORE DRYWALL INSTALLATION. WHEN ITEM NOTED TO BE DEMOLISHED, ENTIRETY OF ITEM TO BE DEMOLISHED. ABANDON IN PLACE IS NOT ACCEPTABLE. CONTRACTOR IS ULTIMATELY RESPONSIBILE FOR ALL DEMOLITION AND PREPARTIONS REQUIRED FOR FINAL CONSTRUCTION, INCLUDING BUT NOT LIMITED TO CORING, TRENCHING, AND FINISH MODIFICATIONS PROVIDE METAL TRIM AT ALL EXPOSED CORNERS AT TILE LOCATIONS. SURFACE MOUNTED DEVICES TO BE LOCATED SUCH THAT THEY DO NOT SPAN BETWEEN SURFACES OF VARYING DEPTH. SURFACE MOUNTED DEVICES SHALL BE SCRIBED INTO THE SURFACE MATERIAL WITH THE GREATEST DISTANCE FROM THE WALL. LEGEND EXISTING TO REMAIN NEW WALL EXISTING TO BE REMOVED REGION INDICATES AREA NOT IN SCOPE KEYNOTE LEGEND KEY PLAN 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant CENTRAL WING RENOVATION 3/10/2017 3:39:14 PM 15924.00 AD101B.1 ENLARGED DEMOLITION FLOOR PLAN - AREA B 2017 03/10/17 PERMIT VAIL VALLEY MEDICAL CENTER 180 S. Frontage Road West, Vail, CO 81657 1/4" = 1'-0" A3 ENLARGED DEMOLITION FLOOR PLAN - AREA B NORTH D03 PREPARE STOREFRONT FOR NEW GLAZING SYSTEM INFILL D32 DEMOLITION OF THIS DOOR MUST BE UNDER PHARMACIST SUPERVISION. GC TO COORDINATE INSTALLATION WITH OWNER. A B C NORTH 06/30/17