HomeMy WebLinkAboutB17-0092_AD101B.1_1498849080.pdf5e86 6e86
Ke86
Je86
He86
(E) GIFT STORE
(E) CORR
(E) VEST
(E) STOR
(E) OFFICE
(E) FIRE PANEL
(E) PHARMACY
(E) LOBBY
D03
D03
D32
2' - 10 3/4"
GENERAL NOTES
EXISTING SYSTEMS, LIFE SAFETY FEATURES, ETC., ARE TO REMAIN
OPERATIONAL DURING ALL HOURS OF THE DAY. REGULAR
CONSTRUCTION WORK HOURS ARE FROM 7:00 AM AND 5:30 PM.
ALL SHUT DOWNS OR MODIFICATIONS WILL BE AT NIGHT OR ON
WEEKENDS. ADDITIONALLY, NO SYSTEM IS TO BE SHUT DOWN
WITHOUT FIRST COORDINATING WITH VVMC AND OBTAINING AN
APPROVED METHOD OF PROCEDURE.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
PATCH AND REFINISH AREAS INPACTED BY CONSTRUCTION. FINAL
CONDITION TO BE LIKE-NEW.
PROVIDE CORNER OR WALL GUARDS AT ALL EXPOSED CORNERS IN
PATIENT AREAS
ALL LIFE SAFETY SYSTEMS AND FIRE RATED ASSEMBLIES TO BE
MAINTAINED PER LIFE SAEFTY CODE REQUIREMENTS AT ALL TIMES.
SEE LS SERIES FOR MORE INFORMATION.
DOORS TO BE LOCATED 6" FROM ADJACENT WALL ON HINGE SIDE
UNLESS NOTED OTHERWISE
SALVAGE ALL MEDICAL EQUIPMENT, CONFIRM NEW LOCATION WITH
OWNER
PROVIDE COORDINATION WALK WITH OWNER AND ARCHITECT TO
CONFIRM ALL BACK BOXES AND WALL DEVICE LOCATION BEFORE
DRYWALL INSTALLATION.
WHEN ITEM NOTED TO BE DEMOLISHED, ENTIRETY OF ITEM TO BE
DEMOLISHED. ABANDON IN PLACE IS NOT ACCEPTABLE.
CONTRACTOR IS ULTIMATELY RESPONSIBILE FOR ALL DEMOLITION AND
PREPARTIONS REQUIRED FOR FINAL CONSTRUCTION, INCLUDING BUT
NOT LIMITED TO CORING, TRENCHING, AND FINISH MODIFICATIONS
PROVIDE METAL TRIM AT ALL EXPOSED CORNERS AT TILE LOCATIONS.
SURFACE MOUNTED DEVICES TO BE LOCATED SUCH THAT THEY DO
NOT SPAN BETWEEN SURFACES OF VARYING DEPTH. SURFACE
MOUNTED DEVICES SHALL BE SCRIBED INTO THE SURFACE MATERIAL
WITH THE GREATEST DISTANCE FROM THE WALL.
LEGEND
EXISTING TO REMAIN
NEW WALL
EXISTING TO BE REMOVED
REGION INDICATES AREA
NOT IN SCOPE
KEYNOTE LEGEND
KEY PLAN
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP, P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
CENTRAL
WING
RENOVATION
3/10/2017
3:39:14 PM
15924.00
AD101B.1
ENLARGED DEMOLITION
FLOOR PLAN - AREA B
2017
03/10/17
PERMIT
VAIL
VALLEY
MEDICAL
CENTER
180 S. Frontage
Road
West,
Vail, CO 81657
1/4" = 1'-0"
A3
ENLARGED DEMOLITION FLOOR PLAN - AREA B
NORTH
D03 PREPARE STOREFRONT FOR NEW GLAZING SYSTEM INFILL
D32 DEMOLITION OF THIS DOOR MUST BE UNDER PHARMACIST
SUPERVISION. GC TO COORDINATE INSTALLATION WITH OWNER.
A
B
C
NORTH
06/30/17