HomeMy WebLinkAboutB17-0092_AD151.1_1498849080.pdfREF.
AD151B.1
A3
AD151A.1
A1
De01 Ce01 Be01 Ee01 Fe01 Ge01 He01 Je01
1e01
2e01
3e01
4e01
5e01
6e01
5e86 6e86 7e86 8e86
Ke86
Je86
He86
EXISTING SYSTEMS, LIFE SAFETY FEATURES, ETC., ARE TO REMAIN
OPERATIONAL DURING THE HOURS OF XX AND XX AND ALL SHUT
DOWNS OR MODIFICATIONS WILL BE AT NIGHT OR ON WEEKENDS.
ADDITIONALLY, NO SYSTEM IS TO BE SHUT DOWN WITHOUT FIRST
COORDINATING WITH VVMC AND OBTAINING AN APPROVED METHOD
OF PROCEDURE.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
PATCH AND REFINISH AREAS INPACTED BY CONSTRUCTION. FINAL
CONDITION TO BE LIKE-NEW.
PROVIDE CORNER OR WALL GUARDS AT ALL EXPOSED CORNERS IN
PATIENT AREAS
ALL LIFE SAFETY SYSTEMS AND FIRE RATED ASSEMBLIES TO BE
MAINTAINED PER LIFE SAEFTY CODE REQUIREMENTS AT ALL TIMES.
SEE LS SERIES FOR MORE INFORMATION.
DOORS TO BE LOCATED 6" FROM ADJACENT WALL ON HINGE SIDE
UNLESS NOTED OTHERWISE
SALVAGE ALL MEDICAL EQUIPMENT, CONFIRM NEW LOCATION WITH
OWNER
PROVIDE COORDINATION WALK WITH OWNER AND ARCHITECT TO
CONFIRM ALL BACK BOXES AND WALL DEVICE LOCATION BEFORE
DRYWALL INSTALLATION.
WHEN ITEM NOTED TO BE DEMOLISHED, ENTIRETY OF ITEM TO BE
DEMOLISHED. ABANDON IN PLACE IS NOT ACCEPTABLE.
CONTRACTOR IS ULTIMATELY RESPONSIBILE FOR ALL DEMOLITION AND
PREPARTIONS REQUIRED FOR FINAL CONSTRUCTION, INCLUDING BUT
NOT LIMITED TO CORING, TRENCHING, AND FINISH MODIFICATIONS
PROVIDE METAL TRIM AT ALL EXPOSED CORNERS AT TILE LOCATIONS.
WALL MOUNTED DEVICES SHALL NOT SPAN BETWEEN SURFACES OF
VARYING DEPTH. DEVICES TO BE LOCATED SUCH THAT THEY DO NOT
SPAN BETWEEN SURFACES OF VARYING DEPTH OR SCRIBED INTO
THE SURFACE MATERIAL WITH THE GREATEST DEPTH OF THE WALL.
EXISTING FLOORING AND WALL FINISH TO BE REPLACED WHERE
FUNCTION OF SPACE IS CHANGING OR NEW FLOOR FINISH IS
SCHEDULED, TYP.
GENERAL NOTES
GENERAL NOTES
AREA NOT IN SCOPE
8' x 0" CEILING HEIGHT
ABOVE FINISH FLOOR
GYP. BOARD CEILING
2' x 2' ACT CEILING
EPOXY FINISH ON GYP.
BOARD CEILING
RCP TO BE
DEMOLISHED
KEY PLAN
KEYNOTE LEGEND
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP, P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
CENTRAL
WING
RENOVATION
3/10/2017
3:39:45 PM
15924.00
AD151.1
OVERALL DEMOLITION
RELFECTED CEILING PLAN -
LEVEL 1
2017
03/10/17
PERMIT VAIL
VALLEY
MEDICAL
CENTER
180 S. Frontage
Road
West,
Vail, CO 81657
1/16" = 1'-0"
A1
OVERALL DEMOLITION REFLECTED CEILING
PLAN - LEVEL 1
A
B
C
NORTH
06/30/17