Loading...
HomeMy WebLinkAboutB17-0092_COMCHECK-ENVELOPE_1491500640.pdf isft COMcheck Software Version 4.0.5.5 A(1 Envelope Compliance Certificate Project Information Energy Code: 2015 IECC Project Title: VVMC-CENTRAL RENOVATION Location: Vail, Colorado Climate Zone: 6b Project Type: Alteration Vertical Glazing/Wall Area: 1% Construction Site: Owner/Agent: Designer/Contractor: 181 West Meadow Drive Davis Partnership Architects Vail, CO 81657 2901 Blake Street Suite 100 Denver, CO 80205 Building Area Floor Area 1-Pharmacy(Hospital) :Nonresidential 1075 2-Nuclear Medicine(Hospital) :Nonresidential 773 3-Admin (Office) : Nonresidential 3187 4-MSA(Health Care-Clinic) : Nonresidential 2169 Envelope Assemblies R-Value Proposed Max.Allowed Post-Alteration Assembly Cavity Cont. U-Factor SHGC U-Factor SHGC ............................... NO RT I-i EAST Window 1:Metal Frame with Thermal Break:Fixed,Clear,Fixed, -•- --- 0.360 0.400 0.360 0.400 Fixed,[Bldg.Use 1 -Pharmacy] (a) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. Envelope PASSES Envelope Compliance Statement Compliance Statement: The proposed envelope alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed envelope systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.5.5 and to cater iy with any applicable mandatory requirements listed in the Inspection Checklist. 12"f:A►-i CAL..402 i .6.12C411 L___- O 4 ec/7017. Name-Title ignalpre Date Project Title: WMC-CENTRAL RENOVATION Report date: 04/05/17 Data filename: \\PrjO\2015\15924.00.000-WMC-East Wing Expansion\Design-Construction\Products- Page 1 of 8 Specifications\Specifications-Central\COMcheck\2016--12_22.cck