HomeMy WebLinkAboutB17-0092_COMCHECK-ENVELOPE_1491500643.pdf isft COMcheck Software Version 4.0.5.5
A(1 Envelope Compliance Certificate
Project Information
Energy Code: 2015 IECC
Project Title: VVMC-CENTRAL RENOVATION
Location: Vail, Colorado
Climate Zone: 6b
Project Type: Alteration
Vertical Glazing/Wall Area: 1%
Construction Site: Owner/Agent: Designer/Contractor:
181 West Meadow Drive Davis Partnership Architects
Vail, CO 81657 2901 Blake Street
Suite 100
Denver, CO 80205
Building Area Floor Area
1-Pharmacy(Hospital) :Nonresidential 1075
2-Nuclear Medicine(Hospital) :Nonresidential 773
3-Admin (Office) : Nonresidential 3187
4-MSA(Health Care-Clinic) : Nonresidential 2169
Envelope Assemblies
R-Value Proposed Max.Allowed
Post-Alteration Assembly Cavity Cont. U-Factor SHGC U-Factor SHGC
...............................
NO RT I-i EAST
Window 1:Metal Frame with Thermal Break:Fixed,Clear,Fixed, -•- --- 0.360 0.400 0.360 0.400
Fixed,[Bldg.Use 1 -Pharmacy]
(a) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
Envelope PASSES
Envelope Compliance Statement
Compliance Statement: The proposed envelope alteration project represented in this document is consistent with the building
plans, specifications, and other calculations submitted with this permit application.The proposed envelope systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.0.5.5 and to cater iy with any applicable mandatory
requirements listed in the Inspection Checklist.
12"f:A►-i CAL..402 i .6.12C411 L___- O 4 ec/7017.
Name-Title ignalpre Date
Project Title: WMC-CENTRAL RENOVATION Report date: 04/05/17
Data filename: \\PrjO\2015\15924.00.000-WMC-East Wing Expansion\Design-Construction\Products- Page 1 of 8
Specifications\Specifications-Central\COMcheck\2016--12_22.cck