Loading...
HomeMy WebLinkAboutB17-0092_G-001.1_1498849080.pdfPROJECT SITE FRONTAGE RD. WEST W. MEADOWS DR LIONSHEAD CIR VAIL RD BEAVER DAM RD FOREST RD ROCKLEDGE RD MIL L CRE E K RD MILL C REEK RD LIFT 8 TOWER I-70 1. THE CONTRACT DOCUMENTS IN THEIR ENTIRETY ARE THE RESPONSIBILITY OF ALL TRADES. WHERE REQUIREMENTS ARE SHOWN IN ONE SECTION OF THE SPECIFICATIONS OR DRAWINGS BUT NOT ANOTHER, THE CONTRACTOR OR SUBCONTRACTOR IS NOT RELIEVED FROM PROVIDING COMPLETELY FINISHED AND PROPERLY FUNCTIONING SYSTEMS. 2. THE CONTRACTOR / SUBCONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LAYOUT AND COORDINATION OF DIMENSIONS IN THE FIELD THAT ESTABLISH WORK POINTS FOR THEIR WORK AND VARIOUS TRADES. 3. ANY MISCELLANEOUS ITEMS OR MATERIALS NOT SPECIFICALLY NOTED, BUT REQUIRED FOR THE PROPER EXECUTION, INSTALLATION, OR PERFORMANCE OF THE WORK, SHALL BE PROVIDED BY THE CONTRACTOR / SUBCONTRACTOR. 4. ALL ITEMS REQUIRING A METHOD OF PROCEDURE APPROVAL SHALL BE SUBMITTED FOR REVIEW 21 DAY IN ADVANCE. 5. THE CONSTRUCTION SITE IS TO BE KEPT CLEAN AND FREE OF DEBRIS. THE CONTRACTOR / SUBCONTRACTOR IS RESPONSIBLE FOR ALL PHASES OF SECURING, HANDLING, TRANSPORTING AND DISPOSING OF DEBRIS. 6. THE CONTRACTORS / SUBCONTRACTORS SHALL NOT SHUT OFF OR INTERRUPT ANY SYSTEMS OR SERVICES WITHOUT FIRST COORDINATING WITH THE OWNER. 7. THE CONTRACTOR / SUBCONTRACTORS SHALL COORDINATE WITH THE OWNER TO IDENTIFY AND PROTECT EXISTING STRUCTURE, ELECTRICAL/DATA/TELECOM SYSTEMS, UTILITIES, SURFACES AND FINISHES WHICH ARE TO REMAIN. ANY DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR/SUBCONTRACTOR. 8. DELIVERY AND STORAGE OF CONSTRUCTION MATERIALS AND EQUIPMENT (STAGING AREAS) SHALL BE COORDINATED WITH THE OWNER. NOT TO INTERFERE WITH HOSPITAL TRAFFIC. 9. THE CONTRACTOR / SUBCONTRACTOR SHALL TAKE CARE TO PROTECT ALL NEWLY INSTALLED MATERIALS AND FINISHES UNTIL WORK IS FORMALLY ACCEPTED BY THE ARCHITECT OR THE OWNER'S REPRESENTATIVE AND TRANSFERRED TO THE OWNER 10. ALL PENETRATIONS THROUGH FLOORS, WALLS AND RATED ASSEMBLIES AS WELL AS ALONG SLAB PERIMETERS AND SEPARATION WALL PERIMETERS, SHALL BE SEALED AND PROTECTED WITH U.L. APPROVED SAFETY ASSEMBLIES AND/OR PROTECTIVE DEVICES HAVING THE SAME OR GREATER TESTED RATING AS THAT REQUIRED FOR THE ASSEMBLY BEING PENETRATED. ALL PENETRATIONS SHALL BE PROTECTED TO MAINTAIN FIRE RATED ASSEMBLY INTEGRITY. 11. PROVIDE ELECTROLYTIC PROTECTION / ISOLATION BETWEEN ALL DISSIMILAR METALS, AND BETWEEN TREATED WOOD AND METALS TO PREVENT ELECTROLYTIC REACTION AND/OR CORROSION. 12. ALL WOOD, EXCEPT ARCHITECTURAL WOODWORK, USED ON THIS PROJECT SHALL BE FIRE RETARDANT, NON-COMBUSTIBLE TREATED AS APPROVED FOR USE BY THE LOCAL CODE AUTHORITIES. NO WOOD (WHETHER TREATED OR NOT) SHALL BE USED WITHIN THE CEILING PLENUM SPACE. 13. THE CONTRACTOR / SUBCONTRACTOR SHALL PROVIDE ADEQUATE BLOCKING, BACKING OR STRUCTURAL SUPPORT AS REQUIRED TO PROPERLY INSTALL ALL MOUNTED ASSEMBLIES, INCLUDING ALL ATTACHED EQUIPMENT (OWNER AND CONTRACTOR FURNISHED ITEMS), PLUMBING FIXTURES, MILLWORK, AND CASEWORK. NOTE: ALL FRAMING OR CONCEALED BLOCKING SHALL BE METAL BETWEEN STUDS AS IS RECOMMMENDED FOR WALL MOUNTED ITEMS. REFER TO THE A-700 SERIES DRAWINGS FOR FUTHER INFORMATION. 14. WHERE FIRE EXTINGUISHER CABINETS, ELECTRICAL PANELS OR OTHER EQUIPMENT OR DEVICES ARE RECESSED IN FIRE-RATED PARTITIONING AND/OR SOUND RATED PARTITIONING, MODIFY PARTITION CONSTRUCTION TO PROVIDE CONTINUOUS ENCLOSURE FOR UNINTERRUPTED ASSOCIATED FIRE RATING AND/OR SOUND RATING. 15. ALL ROOMS OR AREAS WITH CEILINGS OPEN TO STRUCTURE ARE TO HAVE METAL WALL GRILLS FOR AIR DUCT OPENINGS OR AT OPEN AIR TRANSFERS. COORDINATE SIZE OF GRILLE WITH MECHANICAL DRAWINGS AND AIR FLOW REQUIREMENTS. 16. METAL FRAMING STUD SPACING MAY VARY AT LOCATIONS RECEIVING MOISTURE RESISTANT GYPSUM BOARD. INSTALL FRAMING AT WALLS, HARD CEILINGS AND SOFFITS PER MANUFACTURER'S RECOMMENDATIONS. REFER TO SPECIFICATIONS FOR A DISCRIPTION OF THE LOCATIONS TO RECEIVE MOISTURE RESISTANT GYPSUM BOARD INCLUDING BUT NOT LIMITED TO LOCATIONS ADJACENT TO PLUMBING FIXTURES. 17. THE GC SHALL CARRY FIRE WATCH COSTS TO PROVIDE PERSONNEL PER NFPA. 18. THE OWNER WILL BE REQUIRED TO SIGN OFF ON ROUGH IN AND ARCHITECTURAL DEVICES BEFORE PROCEEDING. SEE SPECIFICATION 01 4000 FOR MORE INFORMATION. 19. GC TO PROVIDE ICRA COMPLIANCE PLAN TO OWNER FOR APPROVAL PRIOR TO COMMENCING WORK. 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Consultant Revision Date No. Sheet Information Project Information Location Map Project Team Issuance Date CENTRAL WING RENOVATION Sheet Index General Notes 3/10/2017 3:40:15 PM 15924.00 G-001.1 VAIL VALLEY MEDICAL CENTER 180 S. Frontage Road West, Vail, CO 81657 SHEET INDEX AND PROJECT DATA ARCHITECT Davis Partnership Architects 2901 Blake Street Suite 100 Denver, CO 80205 P. 303.861.8555 Ann Adams ann.adams@davispartnership.com OWNER Vail Valley Medical Center 180 S Frontage Road W Vail, CO 81657 Helen Rowe helen.rowe@vvmc.com CIVIL ENGINEER Martin/Martin, Inc. 0101 Fawcett Rd. Suite 260 Avon, Co 81620 P. 970.926.6007 Mark Luna mluna@martinmartin-mtn.com OWNER REPRESENTATIVE Project One Integrated Services 88 Inverness Cir E Building G, Suite 101 Englewood, CO 80112 P. 303.917.7507 Chris Knight chrisk@projectoneis.com MECHANICAL, ELECTRICAL, PLUMBING Cator Ruma & Associates Co 896 Tabor Street Lakewood, CO 80401 P. 303.232.6200 Wayne Trader wtrader@catorruma.com CODE CONSULATANT Advanced Consulting Engineers 3900 S. Wadsworth Blvd. Suite 595 Lakewood, CO 80235 P. 720.981.4150 Masoud Sabounchi masoud@acecode.com STRUCTURAL ENGINEER Martin/Martin, Inc. 12499 W. Colfax Ave. Lakewood, CO 802015 P. 303.431.6100 Shane McCormick smccormick@martinmartin.com MEDICAL EQUIPMENT Mitchell Associates 630 Dundee RD Suite 340 Northbrook, IL 60062 360.798.7653 Matt Gibbs mgibbs@mitchellplanning.com INTERIOR DESIGNER Davis Partnership Architects 2901 Blake Street Suite 100 Denver, CO 80205 P. 303.861.8555 Janette Ray janette.ray@davispartnership.com 2017 03/10/17 PERMIT NUMBER SHEET ISSUANCE ISSUE DATE 12 Plumbing Demolition PD101.1 LEVEL 1 AND 2 DEMOLITION WASTE AND VENT PLANS - CENTRAL PERMIT 03/10/17 PD111.1 LEVEL 1 AND 2 DEMOLITION DOMESTIC WATER PLANS - CENTRAL PERMIT 03/10/17 13 Plumbing P-001.1 PLUMBING LEGENDS & NOTES PERMIT 03/10/17 P-002.1 PLUMBING SCHEDULES & DETAILS PERMIT 03/10/17 P-111.1 LEVEL 1 AND 2 WASTE & VENT PLAN - CENTRAL PERMIT 03/10/17 P-121.1 LEVEL 1 AND 2 DOMESTIC WATER PLAN - CENTRAL PERMIT 03/10/17 P-131.1 LEVEL 1 AND 2 MEDICAL GAS PLAN - CENTRAL PERMIT 03/10/17 14 Mechanical Demolition MD-111.1 LEVEL 1 DEMOLITION HVAC PLAN - CENTRAL PERMIT 03/10/17 MD-121.1 LEVEL 1 HVAC PIPING PLAN - CENTRAL PERMIT 03/10/17 15 Mechanical M-001.1 MECHANICAL LEGENDS & NOTES PERMIT 03/10/17 M-002.1 MECHANICAL SCHEDULES PERMIT 03/10/17 M-111.1 LEVEL 1 AND 2 HVAC PLAN - CENTRAL PERMIT 03/10/17 M-117.1 ROOF HVAC PLAN - CENTRAL PERMIT 03/10/17 M-121.1 LEVEL 1 HVAC PIPING PLAN - CENTRAL PERMIT 03/10/17 M-401.1 MECHANICAL DETAILS PERMIT 03/10/17 16 Electrical Demolition ED-101.1 LEVEL 1 DEMOLITION LIGHTING PLAN - CENTRAL PERMIT 03/10/17 ED-102.1 LEVEL 2 DEMOLITION LIGHTING PLAN - CENTRAL PERMIT 03/10/17 ED-111.1 LEVEL 1 DEMOLITION POWER PLAN - CENTRAL PERMIT 03/10/17 ED-112.1 LEVEL 2 DEMOLITION POWER PLAN - CENTRAL PERMIT 03/10/17 ED-121.1 LEVEL 1 DEMOLITION FIRE ALARM PLAN - CENTRAL PERMIT 03/10/17 ED-122.1 LEVEL 2 DEMOLITION FIRE ALARM PLAN - CENTRAL PERMIT 03/10/17 17 Electrical E-001.1 ELECTRICAL LEGENDS & NOTES PERMIT 03/10/17 E-002.1 ELECTRICAL SCHEDULES PERMIT 03/10/17 E-011.1 ELECTRICAL ONE-LINE DIAGRAM - WEST NORMAL ENTRANCE PERMIT 03/10/17 E-012.1 ELECTRICAL ONE-LINE DIAGRAM - WEST NORMAL POWER PERMIT 03/10/17 E-013.1 ELECTRICAL ONE-LINE DIAGRAM - WEST EMERGENCY POWER PERMIT 03/10/17 E-014.1 ELECTRICAL ONE-LINE DIAGRAM - WEST CRITICAL AND EQUIPMENT PERMIT 03/10/17 E-015.1 ELECTRICAL ONE-LINE DIAGRAM - EAST NORMAL POWER PERMIT 03/10/17 E-016.1 ELECTRICAL ONE-LINE DIAGRAM - EAST EMERGENCY POWER PERMIT 03/10/17 E-101.1 LEVEL 1 LIGHTING PLAN - CENTRAL PERMIT 03/10/17 E-102.1 LEVEL 2 LIGHTING PLAN - CENTRAL PERMIT 03/10/17 E-111.1 LEVEL 1 POWER PLAN - CENTRAL PERMIT 03/10/17 E-112.1 LEVEL 2 POWER PLAN - CENTRAL PERMIT 03/10/17 E-113.1 ROOF POWER PLAN - CENTRAL PERMIT 03/10/17 E-121.1 LEVEL 1 FIRE ALARM PLAN - CENTRAL PERMIT 03/10/17 E-122.1 LEVEL 2 FIRE ALARM PLAN - CENTRAL PERMIT 03/10/17 E-301.1 ELECTRICAL PANEL SCHEDULES PERMIT 03/10/17 E-302.1 ELECTRICAL PANEL SCHEDULES PERMIT 03/10/17 E-401.1 ELECTRICAL DETAILS PERMIT 03/10/17 20 Technology Demolition TD.101.1 LEVEL 1 - DEMOLOTION TECHNOLOGY PLAN - CENTRAL PERMIT 03/10/17 TD.102.1 LEVEL 2 DEMOLITION TECHNOLOGY PLAN - CENTRAL PERMIT 03/10/17 21 Technology T-001.1 TECHNOLOGY LEGENDS & NOTES PERMIT 03/10/17 T-101.1 LEVEL 1 TECHNOLOGY PLAN - CENTRAL PERMIT 03/10/17 T-102.1 LEVEL 2 TECHNOLOGY PLAN - CENTRAL PERMIT 03/10/17 22 Equipment Q-101A ENLARGED MEDICAL EQUIPMENT PLAN - AREA A PERMIT 03/10/17 Q-101B ENLARGED MEDICAL EQUIPMENT PLAN - AREA B PERMIT 03/10/17 Q-102C ENLARGED MEDICAL EQUIPMENT PLAN - AREA C PERMIT 03/10/17 NUMBER SHEET ISSUANCE ISSUE DATE 01 General G-000.1 COVER PERMIT 03/10/17 G-001.1 SHEET INDEX AND PROJECT DATA PERMIT 03/10/17 02 Life Safety LS000.1 CODE ANALYSIS PERMIT 03/10/17 LS101.1 LIFE SAFETY PLAN - LEVEL 1 PERMIT 03/10/17 LS101.2 LIFE SAFETY PLAN - LEVEL 1 - OCCUPANCY & USE PERMIT 03/10/17 LS102.1 LIFE SAFETY PLAN - LEVEL 2 PERMIT 03/10/17 LS102.2 LIFE SAFETY PLAN - LEVEL 2 - OCCUPANCY & USE PERMIT 03/10/17 LS200A.1 INTERIM LIFE SAFETY PLAN - AREA A PERMIT 03/10/17 LS200B.1 INTERIM LIFE SAFETY PLAN - AREA B PERMIT 03/10/17 LS200C.1 INTERIM LIFE SAFETY PLAN - AREA C PERMIT 03/10/17 02 Site Survey L101.1 COMBINED SURVEY PERMIT 03/10/17 07 Structural S-001 GENERAL NOTES PERMIT 03/10/17 S-002 QUALITY ASSURANCE PERMIT 03/10/17 S-101 LEVEL 1 FRAMING PLAN PERMIT 03/10/17 S-102 LEVEL 2 FRAMING PLAN PERMIT 03/10/17 S-200 FRAMING DETAILS PERMIT 03/10/17 08 Architectural Demolition A-000.1 ABBREVIATIONS & SYMBOLS PERMIT 03/10/17 AD101.1 OVERALL DEMOLITION PLAN - LEVEL 1 PERMIT 03/10/17 AD101A.1 ENLARGED DEMOLITION FLOOR PLAN - AREA A PERMIT 03/10/17 AD101B.1 ENLARGED DEMOLITION FLOOR PLAN - AREA B PERMIT 03/10/17 AD102.1 OVERALL DEMOLITION PLAN - LEVEL 2 PERMIT 03/10/17 AD102C.1 ENLARGED DEMOLITION FLOOR PLAN - AREA C PERMIT 03/10/17 AD151.1 OVERALL DEMOLITION RELFECTED CEILING PLAN - LEVEL 1 PERMIT 03/10/17 AD151A.1 ENLARGED DEMOLITION REFLECTED CEILING PLAN - AREA A PERMIT 03/10/17 AD151B.1 ENLARGED DEMOLITION REFLECTED CEILING PLAN - AREA B PERMIT 03/10/17 AD152.1 OVERALL DEMOLITION RELFECTED CEILING PLAN - LEVEL 2 PERMIT 03/10/17 AD152C.1 ENLARGED DEMOLITION RELFECTED CEILING PLAN - AREA C PERMIT 03/10/17 AD201.1 DEMOLITION ELEVATIONS PERMIT 03/10/17 09 Architectural A-101.1 OVERALL FLOOR PLAN - LEVEL 1 PERMIT 03/10/17 A-101A.1 ENLARGED ANNOTATION FLOOR PLAN - AREA A PERMIT 03/10/17 A-101A.2 ENLARGED DIMENSION FLOOR PLAN - AREA A PERMIT 03/10/17 A-101B.1 ENLARGED FLOOR PLAN - AREA B PERMIT 03/10/17 A-102.1 OVERALL FLOOR PLAN - LEVEL 2 PERMIT 03/10/17 A-102C.1 ENLARGED ANNOTATION FLOOR PLAN - AREA C PERMIT 03/10/17 A-102C.2 ENLARGED DIMENSION FLOOR PLAN - AREA C PERMIT 03/10/17 A-107.1 OVERALL FLOOR PLAN - ROOF PERMIT 03/10/17 A-151.1 OVERALL REFLECTED CEILING PLAN - LEVEL 1 PERMIT 03/10/17 A-151A.1 ENLARGED REFLECTED CEILING PLAN AREA A PERMIT 03/10/17 A-151B.1 ENLARGED REFLECTED CEILING PLAN AREA B PERMIT 03/10/17 A-152.1 OVERALL REFLECTED CEILING PLAN - LEVEL 2 PERMIT 03/10/17 A-152C.1 ENLARGED REFLECTED CEILING PLAN - LEVEL 2 - AREA C PERMIT 03/10/17 A-200.1 EXTERIOR ELEVATION & PERSPECTIVES PERMIT 03/10/17 A-300.1 BUILDING SECTIONS PERMIT 03/10/17 A-310.1 WALL SECTIONS AND PERSPECTIVES - EXTERIOR PERMIT 03/10/17 A-320.1 WALL SECTIONS AND PERSPECTIVES - INTERIOR PERMIT 03/10/17 A-401A.1 AREA A ENLARGED PLANS AND INTERIOR ELEVATIONS PERMIT 03/10/17 A-401A.2 AREA A ENLARGED PLANS AND INTERIOR ELEVATIONS PERMIT 03/10/17 A-401B.1 AREA B ENLARGED PLANS AND INTERIOR ELEVATIONS PERMIT 03/10/17 A-401C.1 AREA C ENLARGED PLANS AND INTERIOR ELEVATIONS PERMIT 03/10/17 A-520B.1 EXTERIOR DETAILS PERMIT 03/10/17 A-550.1 INTERIOR DETAILS PERMIT 03/10/17 A-551.1 INTERIOR DETAILS PERMIT 03/10/17 A-591.1 DETAILS - CASEWORK PERMIT 03/10/17 A-592.1 DETAILS - CASEWORK PERMIT 03/10/17 A-621A.1 ENLARGED FINISH FLOOR PLAN - AREA A PERMIT 03/10/17 A-621B.1 ENLARGED FINISH FLOOR PLAN - AREA B PERMIT 03/10/17 A-622C.1 ENLARGED FINISH FLOOR PLAN - AREA C PERMIT 03/10/17 A-720.1 DOOR SCHEDULE, PARTITION TYPES, AND DETAILS PERMIT 03/10/17 A-721.1 FRAMING DETAILS PERMIT 03/10/17 A-740.1 WINDOW TYPES AND DETAILS PERMIT 03/10/17 A-760.1 INTERIOR MOUNTING HEIGHTS PERMIT 03/10/17 A-760.2 INTERIOR MOUNTING HEIGHTS/ TOILET ACCESSORIES SCHEDULE PERMIT 03/10/17 06/30/17