HomeMy WebLinkAboutB17-0092_G-001.1_1503950469.pdfPROJECT
FRONTAGE RD.
W. MEADOWS
LIONSHEAD CIR
VAIL RD
BEAVER DAM
FOREST
ROCKLEDGE
MIL
L C
RE
E
K RD
MILL C
REE
K R
D
LIFT 8
I-70
1. THE CONTRACT DOCUMENTS IN THEIR ENTIRETY ARE THE
RESPONSIBILITY OF ALL TRADES. WHERE REQUIREMENTS ARE SHOWN
IN ONE SECTION OF THE SPECIFICATIONS OR DRAWINGS BUT NOT
ANOTHER, THE CONTRACTOR OR SUBCONTRACTOR IS NOT RELIEVED
FROM PROVIDING COMPLETELY FINISHED AND PROPERLY FUNCTIONING
SYSTEMS.
2. THE CONTRACTOR / SUBCONTRACTOR SHALL BE FULLY RESPONSIBLE
FOR THE LAYOUT AND COORDINATION OF DIMENSIONS IN THE FIELD
THAT ESTABLISH WORK POINTS FOR THEIR WORK AND VARIOUS
TRADES.
3. ANY MISCELLANEOUS ITEMS OR MATERIALS NOT SPECIFICALLY NOTED,
BUT REQUIRED FOR THE PROPER EXECUTION, INSTALLATION, OR
PERFORMANCE OF THE WORK, SHALL BE PROVIDED BY THE
CONTRACTOR / SUBCONTRACTOR.
4. ALL ITEMS REQUIRING A METHOD OF PROCEDURE APPROVAL SHALL BE
SUBMITTED FOR REVIEW 21 DAY IN ADVANCE.
5. THE CONSTRUCTION SITE IS TO BE KEPT CLEAN AND FREE OF DEBRIS.
THE CONTRACTOR / SUBCONTRACTOR IS RESPONSIBLE FOR ALL
PHASES OF SECURING, HANDLING, TRANSPORTING AND DISPOSING OF
DEBRIS.
6. THE CONTRACTORS / SUBCONTRACTORS SHALL NOT SHUT OFF OR
INTERRUPT ANY SYSTEMS OR SERVICES WITHOUT FIRST COORDINATING
WITH THE OWNER.
7. THE CONTRACTOR / SUBCONTRACTORS SHALL COORDINATE WITH THE
OWNER TO IDENTIFY AND PROTECT EXISTING STRUCTURE,
ELECTRICAL/DATA/TELECOM SYSTEMS, UTILITIES, SURFACES AND
FINISHES WHICH ARE TO REMAIN. ANY DAMAGED DURING
CONSTRUCTION SHALL BE REPAIRED BY THE
CONTRACTOR/SUBCONTRACTOR.
8. DELIVERY AND STORAGE OF CONSTRUCTION MATERIALS AND
EQUIPMENT (STAGING AREAS) SHALL BE COORDINATED WITH THE
OWNER. NOT TO INTERFERE WITH HOSPITAL TRAFFIC.
9. THE CONTRACTOR / SUBCONTRACTOR SHALL TAKE CARE TO PROTECT
ALL NEWLY INSTALLED MATERIALS AND FINISHES UNTIL WORK IS
FORMALLY ACCEPTED BY THE ARCHITECT OR THE OWNER'S
REPRESENTATIVE AND TRANSFERRED TO THE OWNER
10. ALL PENETRATIONS THROUGH FLOORS, WALLS AND RATED ASSEMBLIES
AS WELL AS ALONG SLAB PERIMETERS AND SEPARATION WALL
PERIMETERS, SHALL BE SEALED AND PROTECTED WITH U.L. APPROVED
SAFETY ASSEMBLIES AND/OR PROTECTIVE DEVICES HAVING THE SAME
OR GREATER TESTED RATING AS THAT REQUIRED FOR THE ASSEMBLY
BEING PENETRATED. ALL PENETRATIONS SHALL BE PROTECTED TO
MAINTAIN FIRE RATED ASSEMBLY INTEGRITY.
11. PROVIDE ELECTROLYTIC PROTECTION / ISOLATION BETWEEN ALL
DISSIMILAR METALS, AND BETWEEN TREATED WOOD AND METALS TO
PREVENT ELECTROLYTIC REACTION AND/OR CORROSION.
12. ALL WOOD, EXCEPT ARCHITECTURAL WOODWORK, USED ON THIS
PROJECT SHALL BE FIRE RETARDANT, NON-COMBUSTIBLE TREATED AS
APPROVED FOR USE BY THE LOCAL CODE AUTHORITIES. NO WOOD
(WHETHER TREATED OR NOT) SHALL BE USED WITHIN THE CEILING
PLENUM SPACE.
13. THE CONTRACTOR / SUBCONTRACTOR SHALL PROVIDE ADEQUATE
BLOCKING, BACKING OR STRUCTURAL SUPPORT AS REQUIRED TO
PROPERLY INSTALL ALL MOUNTED ASSEMBLIES, INCLUDING ALL
ATTACHED EQUIPMENT (OWNER AND CONTRACTOR FURNISHED ITEMS),
PLUMBING FIXTURES, MILLWORK, AND CASEWORK. NOTE: ALL FRAMING
OR CONCEALED BLOCKING SHALL BE METAL BETWEEN STUDS AS IS
RECOMMMENDED FOR WALL MOUNTED ITEMS. REFER TO THE A-700
SERIES DRAWINGS FOR FUTHER INFORMATION.
14. WHERE FIRE EXTINGUISHER CABINETS, ELECTRICAL PANELS OR OTHER
EQUIPMENT OR DEVICES ARE RECESSED IN FIRE-RATED PARTITIONING
AND/OR SOUND RATED PARTITIONING, MODIFY PARTITION
CONSTRUCTION TO PROVIDE CONTINUOUS ENCLOSURE FOR
UNINTERRUPTED ASSOCIATED FIRE RATING AND/OR SOUND RATING.
15. ALL ROOMS OR AREAS WITH CEILINGS OPEN TO STRUCTURE ARE TO
HAVE METAL WALL GRILLS FOR AIR DUCT OPENINGS OR AT OPEN AIR
TRANSFERS. COORDINATE SIZE OF GRILLE WITH MECHANICAL
DRAWINGS AND AIR FLOW REQUIREMENTS.
16. METAL FRAMING STUD SPACING MAY VARY AT LOCATIONS RECEIVING
MOISTURE RESISTANT GYPSUM BOARD. INSTALL FRAMING AT WALLS,
HARD CEILINGS AND SOFFITS PER MANUFACTURER'S
RECOMMENDATIONS. REFER TO SPECIFICATIONS FOR A DISCRIPTION
OF THE LOCATIONS TO RECEIVE MOISTURE RESISTANT GYPSUM BOARD
INCLUDING BUT NOT LIMITED TO LOCATIONS ADJACENT TO PLUMBING
FIXTURES.
17. THE GC SHALL CARRY FIRE WATCH COSTS TO PROVIDE PERSONNEL PER
NFPA.
18. THE OWNER WILL BE REQUIRED TO SIGN OFF ON ROUGH IN AND
ARCHITECTURAL DEVICES BEFORE PROCEEDING. SEE SPECIFICATION 01
4000 FOR MORE INFORMATION.
19. GC TO PROVIDE ICRA COMPLIANCE PLAN TO OWNER FOR APPROVAL
PRIOR TO COMMENCING WORK.
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
Sheet Title:
Sheet Information
Project Information
Location
Project
CENTRAL
WING
RENOVATION
Sheet General
Revisions Date
Project
Information
Issuance
Consultant
7/11/2017
1:31:17 PM
15924.00
G-001.1
VAIL
VALLEY
MEDICAL
CENTER
180 S. Frontage
Road
West,
Vail, CO 81657
SHEET INDEX
AND PROJECT
DATA
ARCHITECT
Davis Partnership Architects
2901 Blake Street
Suite 100
Denver, CO 80205
P. 303.861.8555
Ann Adams
ann.adams@davispartnership.com
OWNER
Vail Valley Medical Center
180 S Frontage Road W
Vail, CO 81657
Helen Rowe
helen.rowe@vvmc.com
CIVIL ENGINEER
Martin/Martin, Inc.
0101 Fawcett Rd.
Suite 260
Avon, Co 81620
P. 970.926.6007
Mark Luna
mluna@martinmartin-mtn.com
OWNER REPRESENTATIVE
Project One Integrated Services
88 Inverness Cir E
Building G, Suite 101
Englewood, CO 80112
P. 303.917.7507
Chris Knight
chrisk@projectoneis.com
MECHANICAL, ELECTRICAL, PLUMBING
Cator Ruma & Associates Co
896 Tabor Street
Lakewood, CO 80401
P. 303.232.6200
Wayne Trader
wtrader@catorruma.com
CODE CONSULATANT
Advanced Consulting Engineers
3900 S. Wadsworth Blvd.
Suite 595
Lakewood, CO 80235
P. 720.981.4150
Masoud Sabounchi
masoud@acecode.com
STRUCTURAL ENGINEER
Martin/Martin, Inc.
12499 W. Colfax Ave.
Lakewood, CO 802015
P. 303.431.6100
Shane McCormick
smccormick@martinmartin.com
MEDICAL EQUIPMENT
Mitchell Associates
630 Dundee RD Suite 340
Northbrook, IL 60062
360.798.7653
Matt Gibbs
mgibbs@mitchellplanning.com
INTERIOR DESIGNER
Davis Partnership Architects
2901 Blake Street
Suite 100
Denver, CO 80205
P. 303.861.8555
Janette Ray
janette.ray@davispartnership.com
2017
07/11/17
PERMIT
RESUBMISSION
1
1
1
ADDENDUM 1 05/23/17 1
ADDENDUM 3 06/27/17 2
ADDENDUM 4 07/06/17 3
NUMBER SHEET
ISSUANCE
12 Plumbing Demolition
PD101.1 LEVEL 1 AND 2 DEMOLITION WASTE AND VENT PLANS - CENTRAL PERMIT RESUBMISSION
PD111.1 LEVEL 1 AND 2 DEMOLITION DOMESTIC WATER PLANS - CENTRAL PERMIT RESUBMISSION
13 Plumbing
P.001.1 PLUMING LEGENDS AND NOTES PERMIT RESUBMISSION
P.002.1 PLUMBING SCHEDULES & DETAILS PERMIT RESUBMISSION
P.111.1 LEVEL 1 AND 2 WASTE & VENT PLANS - CENTRAL PERMIT RESUBMISSION
P.121.1 LEVEL 1 AND 2 DOMESTIC WATER PLANS - CENTRAL PERMIT RESUBMISSION
P.131.1 LEVEL 1 AND 2 MEDICAL GAS PLANS - CENTRAL PERMIT RESUBMISSION
14 Mechanical Demolition
MD.111.1 LEVEL 1 AND 2 DEMOLITION HVAC PLANS - CENTRAL PERMIT RESUBMISSION
MD.121.1 LEVEL 1 DEMOLITION HVAC PIPING PLAN - CENTRAL PERMIT RESUBMISSION
15 Mechanical
M.001.1 MECHANICAL LEGENDS AND NOTES PERMIT RESUBMISSION
M.002.1 MECHANICAL SCHEDULES PERMIT RESUBMISSION
M.111.1 LEVEL 1 AND 2 HVAC PLANS - CENTRAL PERMIT RESUBMISSION
M.117.1 ROOF HVAC PLAN - CENTRAL PERMIT RESUBMISSION
M.121.1 LEVEL 1 HVAC PIPING PLAN - CENTRAL PERMIT RESUBMISSION
M.401.1 MECHANICAL DETAILS PERMIT RESUBMISSION
16 Electrical Demolition
ED.101.1 LEVEL 1 DEMOLITION LIGHTING PLAN - CENTRAL PERMIT RESUBMISSION
ED.102.1 LEVEL 2 DEMLOITION LIGHTING PLAN - CENTRAL PERMIT RESUBMISSION
ED.111.1 LEVEL 1 DEMOLITION POWER PLAN - CENTRAL PERMIT RESUBMISSION
ED.112.1 LEVEL 2 DEMOLITION POWER PLAN - CENTRAL PERMIT RESUBMISSION
ED.121.1 LEVEL 1 DEMOLITION FIRE ALARM PLAN - CENTRAL PERMIT RESUBMISSION
ED.122.1 LEVEL 2 DEMOLITION FIRE ALARM PLAN - CENTRAL PERMIT RESUBMISSION
17 Electrical
E.001.1 ELECTRICAL LEGENDS & NOTES PERMIT RESUBMISSION
E.002.1 ELECTRICAL SCHEDULES PERMIT RESUBMISSION
E.011.1 ELECTRICAL ONE-LINE DIAGRAM - WEST NORMAL ENTRANCE PERMIT RESUBMISSION
E.012.1 ELECTRICAL ONE-LINE DIAGRAM - WEST NORMAL POWER PERMIT RESUBMISSION
E.013.1 ELECTRICAL ONE-LINE DIAGRAM - WEST EMERGENCY POWER PERMIT RESUBMISSION
E.014.1 ELECTRICAL ONE-LINE DIAGRAM - WEST CRITICAL AND EQUIPMENT PERMIT RESUBMISSION
E.015.1 ELECTRICAL ONE-LINE DIAGRAM - EAST NORMAL POWER PERMIT RESUBMISSION
E.016.1 ELECTRICAL ONE-LINE DIAGRAM - EAST EMERGENCY POWER PERMIT RESUBMISSION
E.101.1 LEVEL 1 LIGHTING PLAN - CENTRAL PERMIT RESUBMISSION
E.102.1 LEVEL 2 LIGHTING PLAN - CENTRAL PERMIT RESUBMISSION
E.111.1 LEVEL 1 POWER PLAN - CENTRAL PERMIT RESUBMISSION
E.112.1 LEVEL 2 POWER PLAN - CENTRAL PERMIT RESUBMISSION
E.113.1 ROOF POWER PLAN - CENTRAL PERMIT RESUBMISSION
E.121.1 LEVEL 1 FIRE ALARM PLAN - CENTRAL PERMIT RESUBMISSION
E.122.1 LEVEL 2 FIRE ALARM PLAN - CENTRAL PERMIT RESUBMISSION
E.301.1 ELECTRICAL PANEL SCHEDULES PERMIT RESUBMISSION
E.302.1 ELECTRICAL PANEL SCHEDULES PERMIT RESUBMISSION
E.401.1 ELECTRICAL DETAILS PERMIT RESUBMISSION
20 Technology Demolition
TD101.1 LEVEL 1 DEMOLITION TECHNOLOGY PLAN - CENTRAL PERMIT RESUBMISSION
TD102.1 LEVEL 2 DEMOLITION TECHNOLOGY PLAN - CENTRAL PERMIT RESUBMISSION
21 Technology
T.001. 1 TECHNOLOGY LEGENDS & NOTES PERMIT RESUBMISSION
T.101.1 LEVEL 1 TECHNOLOGY PLAN - CENTRAL PERMIT RESUBMISSION
T.102.1 LEVEL 2 TECHNOLOGY PLAN - CENTRAL PERMIT RESUBMISSION
22 Equipment
Q.101A ENLARGED MEDICAL EQUIPMENT PLAN - AREA A PERMIT RESUBMISSION
Q.101B ENLARGED MEDICAL EQUIPMENT PLAN - AREA B PERMIT RESUBMISSION
Q.101C ENLARGED MEDICAL EQUIPMENT PLAN - AREA C PERMIT RESUBMISSION
NUMBER SHEET ISSUANCE
01 General
G-000.1 COVER PERMIT RESUBMISSION
G-001.1 SHEET INDEX AND PROJECT DATA PERMIT RESUBMISSION
G-010.1 SEQUENCE PLAN #1 PERMIT RESUBMISSION
G-010.2 SEQUENCE PLAN #2 PERMIT RESUBMISSION
G-010.3 SEQUENCE PLAN #3 PERMIT RESUBMISSION
02 Life Safety
LS000.1 CODE ANALYSIS PERMIT RESUBMISSION
LS101.1 LIFE SAFETY PLAN - LEVEL 1 PERMIT RESUBMISSION
LS101.2 LIFE SAFETY PLAN - LEVEL 1 - OCCUPANCY & USE PERMIT RESUBMISSION
LS102.1 LIFE SAFETY PLAN - LEVEL 2 PERMIT RESUBMISSION
LS102.2 LIFE SAFETY PLAN - LEVEL 2 - OCCUPANCY & USE PERMIT RESUBMISSION
LS201.1 OVERALL INTERIM LIFE SAFETY PLAN - LEVEL 1 PERMIT RESUBMISSION
LS201A.1 INTERIM LIFE SAFETY PLAN - AREA A PERMIT RESUBMISSION
LS201B.1 INTERIM LIFE SAFETY PLAN - AREA B PERMIT RESUBMISSION
LS201D.1 INTERIM LIFE LAFETY PLAN - AREA D PERMIT RESUBMISSION
LS202C.1 INTERIM LIFE SAFETY PLAN - AREA C PERMIT RESUBMISSION
07 Structural
S.001 GENERAL NOTES PERMIT RESUBMISSION
S.002 QUALITY ASSURANCE PERMIT RESUBMISSION
S.101 LEVEL 1 FRAMING PLAN PERMIT RESUBMISSION
S.102 LEVEL 2 FRAMING PLAN PERMIT RESUBMISSION
S.200 FRAMING DETAILS PERMIT RESUBMISSION
08 Architectural Demolition
A-000.1 ABBREVIATIONS & SYMBOLS PERMIT RESUBMISSION
AD101.1 OVERALL DEMOLITION PLAN - LEVEL 1 PERMIT RESUBMISSION
AD101A.1 ENLARGED DEMOLITION FLOOR PLAN - AREA A PERMIT RESUBMISSION
AD101B.1 ENLARGED DEMOLITION FLOOR PLAN - AREA B PERMIT RESUBMISSION
AD102.1 OVERALL DEMOLITION PLAN - LEVEL 2 PERMIT RESUBMISSION
AD102C.1 ENLARGED DEMOLITION FLOOR PLAN - AREA C PERMIT RESUBMISSION
AD151.1 OVERALL DEMOLITION RELFECTED CEILING PLAN - LEVEL 1 PERMIT RESUBMISSION
AD151A.1 ENLARGED DEMOLITION REFLECTED CEILING PLAN - AREA A PERMIT RESUBMISSION
AD151B.1 ENLARGED DEMOLITION REFLECTED CEILING PLAN - AREA B PERMIT RESUBMISSION
AD151D.1 ENLARGED DEMOLITION REFLECTED CEILING PLAN - AREA D PERMIT RESUBMISSION
AD152.1 OVERALL DEMOLITION RELFECTED CEILING PLAN - LEVEL 2 PERMIT RESUBMISSION
AD152C.1 ENLARGED DEMOLITION RELFECTED CEILING PLAN - AREA C PERMIT RESUBMISSION
09 Architectural
A-101.1 OVERALL FLOOR PLAN - LEVEL 1 PERMIT RESUBMISSION
A-101A.1 ENLARGED ANNOTATION FLOOR PLAN - AREA A PERMIT RESUBMISSION
A-101A.2 ENLARGED DIMENSION FLOOR PLAN - AREA A PERMIT RESUBMISSION
A-101B.1 ENLARGED FLOOR PLAN - AREA B PERMIT RESUBMISSION
A-102.1 OVERALL FLOOR PLAN - LEVEL 2 PERMIT RESUBMISSION
A-102C.1 ENLARGED ANNOTATION FLOOR PLAN - AREA C PERMIT RESUBMISSION
A-102C.2 ENLARGED DIMENSION FLOOR PLAN - AREA C PERMIT RESUBMISSION
A-107.1 OVERALL FLOOR PLAN - ROOF PERMIT RESUBMISSION
A-151.1 OVERALL REFLECTED CEILING PLAN - LEVEL 1 PERMIT RESUBMISSION
A-151A.1 ENLARGED REFLECTED CEILING PLAN AREA A PERMIT RESUBMISSION
A-151B.1 ENLARGED REFLECTED CEILING PLAN AREA B PERMIT RESUBMISSION
A-152.1 OVERALL REFLECTED CEILING PLAN - LEVEL 2 PERMIT RESUBMISSION
A-152C.1 ENLARGED REFLECTED CEILING PLAN - LEVEL 2 - AREA C PERMIT RESUBMISSION
A-200.1 EXTERIOR ELEVATION & PERSPECTIVES PERMIT RESUBMISSION
A-300.1 BUILDING SECTIONS PERMIT RESUBMISSION
A-310.1 WALL SECTIONS AND PERSPECTIVES - EXTERIOR PERMIT RESUBMISSION
A-320.1 WALL SECTIONS AND PERSPECTIVES - INTERIOR PERMIT RESUBMISSION
A-401A.1 AREA A ENLARGED PLANS AND INTERIOR ELEVATIONS PERMIT RESUBMISSION
A-401A.2 AREA A ENLARGED PLANS AND INTERIOR ELEVATIONS PERMIT RESUBMISSION
A-401B.1 AREA B ENLARGED PLANS AND INTERIOR ELEVATIONS PERMIT RESUBMISSION
A-401C.1 AREA C ENLARGED PLANS AND INTERIOR ELEVATIONS PERMIT RESUBMISSION
A-520B.1 EXTERIOR DETAILS PERMIT RESUBMISSION
A-550.1 INTERIOR DETAILS PERMIT RESUBMISSION
A-551.1 INTERIOR DETAILS PERMIT RESUBMISSION
A-591.1 DETAILS - CASEWORK PERMIT RESUBMISSION
A-592.1 DETAILS - CASEWORK PERMIT RESUBMISSION
A-621A.1 ENLARGED FINISH FLOOR PLAN - AREA A PERMIT RESUBMISSION
A-621B.1 ENLARGED FINISH FLOOR PLAN - AREA B PERMIT RESUBMISSION
A-622C.1 ENLARGED FINISH FLOOR PLAN - AREA C PERMIT RESUBMISSION
A-720.1 DOOR SCHEDULE, PARTITION TYPES, AND DETAILS PERMIT RESUBMISSION
A-721.1 FRAMING DETAILS PERMIT RESUBMISSION
A-740.1 WINDOW TYPES AND DETAILS PERMIT RESUBMISSION
A-760.1 INTERIOR MOUNTING HEIGHTS PERMIT RESUBMISSION
A-760.2 INTERIOR MOUNTING HEIGHTS/ TOILET ACCESSORIES SCHEDULE PERMIT RESUBMISSION
08/28/17