Loading...
HomeMy WebLinkAboutB17-0092_G-001.1_1503950469.pdfPROJECT FRONTAGE RD. W. MEADOWS LIONSHEAD CIR VAIL RD BEAVER DAM FOREST ROCKLEDGE MIL L C RE E K RD MILL C REE K R D LIFT 8 I-70 1. THE CONTRACT DOCUMENTS IN THEIR ENTIRETY ARE THE RESPONSIBILITY OF ALL TRADES. WHERE REQUIREMENTS ARE SHOWN IN ONE SECTION OF THE SPECIFICATIONS OR DRAWINGS BUT NOT ANOTHER, THE CONTRACTOR OR SUBCONTRACTOR IS NOT RELIEVED FROM PROVIDING COMPLETELY FINISHED AND PROPERLY FUNCTIONING SYSTEMS. 2. THE CONTRACTOR / SUBCONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LAYOUT AND COORDINATION OF DIMENSIONS IN THE FIELD THAT ESTABLISH WORK POINTS FOR THEIR WORK AND VARIOUS TRADES. 3. ANY MISCELLANEOUS ITEMS OR MATERIALS NOT SPECIFICALLY NOTED, BUT REQUIRED FOR THE PROPER EXECUTION, INSTALLATION, OR PERFORMANCE OF THE WORK, SHALL BE PROVIDED BY THE CONTRACTOR / SUBCONTRACTOR. 4. ALL ITEMS REQUIRING A METHOD OF PROCEDURE APPROVAL SHALL BE SUBMITTED FOR REVIEW 21 DAY IN ADVANCE. 5. THE CONSTRUCTION SITE IS TO BE KEPT CLEAN AND FREE OF DEBRIS. THE CONTRACTOR / SUBCONTRACTOR IS RESPONSIBLE FOR ALL PHASES OF SECURING, HANDLING, TRANSPORTING AND DISPOSING OF DEBRIS. 6. THE CONTRACTORS / SUBCONTRACTORS SHALL NOT SHUT OFF OR INTERRUPT ANY SYSTEMS OR SERVICES WITHOUT FIRST COORDINATING WITH THE OWNER. 7. THE CONTRACTOR / SUBCONTRACTORS SHALL COORDINATE WITH THE OWNER TO IDENTIFY AND PROTECT EXISTING STRUCTURE, ELECTRICAL/DATA/TELECOM SYSTEMS, UTILITIES, SURFACES AND FINISHES WHICH ARE TO REMAIN. ANY DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR/SUBCONTRACTOR. 8. DELIVERY AND STORAGE OF CONSTRUCTION MATERIALS AND EQUIPMENT (STAGING AREAS) SHALL BE COORDINATED WITH THE OWNER. NOT TO INTERFERE WITH HOSPITAL TRAFFIC. 9. THE CONTRACTOR / SUBCONTRACTOR SHALL TAKE CARE TO PROTECT ALL NEWLY INSTALLED MATERIALS AND FINISHES UNTIL WORK IS FORMALLY ACCEPTED BY THE ARCHITECT OR THE OWNER'S REPRESENTATIVE AND TRANSFERRED TO THE OWNER 10. ALL PENETRATIONS THROUGH FLOORS, WALLS AND RATED ASSEMBLIES AS WELL AS ALONG SLAB PERIMETERS AND SEPARATION WALL PERIMETERS, SHALL BE SEALED AND PROTECTED WITH U.L. APPROVED SAFETY ASSEMBLIES AND/OR PROTECTIVE DEVICES HAVING THE SAME OR GREATER TESTED RATING AS THAT REQUIRED FOR THE ASSEMBLY BEING PENETRATED. ALL PENETRATIONS SHALL BE PROTECTED TO MAINTAIN FIRE RATED ASSEMBLY INTEGRITY. 11. PROVIDE ELECTROLYTIC PROTECTION / ISOLATION BETWEEN ALL DISSIMILAR METALS, AND BETWEEN TREATED WOOD AND METALS TO PREVENT ELECTROLYTIC REACTION AND/OR CORROSION. 12. ALL WOOD, EXCEPT ARCHITECTURAL WOODWORK, USED ON THIS PROJECT SHALL BE FIRE RETARDANT, NON-COMBUSTIBLE TREATED AS APPROVED FOR USE BY THE LOCAL CODE AUTHORITIES. NO WOOD (WHETHER TREATED OR NOT) SHALL BE USED WITHIN THE CEILING PLENUM SPACE. 13. THE CONTRACTOR / SUBCONTRACTOR SHALL PROVIDE ADEQUATE BLOCKING, BACKING OR STRUCTURAL SUPPORT AS REQUIRED TO PROPERLY INSTALL ALL MOUNTED ASSEMBLIES, INCLUDING ALL ATTACHED EQUIPMENT (OWNER AND CONTRACTOR FURNISHED ITEMS), PLUMBING FIXTURES, MILLWORK, AND CASEWORK. NOTE: ALL FRAMING OR CONCEALED BLOCKING SHALL BE METAL BETWEEN STUDS AS IS RECOMMMENDED FOR WALL MOUNTED ITEMS. REFER TO THE A-700 SERIES DRAWINGS FOR FUTHER INFORMATION. 14. WHERE FIRE EXTINGUISHER CABINETS, ELECTRICAL PANELS OR OTHER EQUIPMENT OR DEVICES ARE RECESSED IN FIRE-RATED PARTITIONING AND/OR SOUND RATED PARTITIONING, MODIFY PARTITION CONSTRUCTION TO PROVIDE CONTINUOUS ENCLOSURE FOR UNINTERRUPTED ASSOCIATED FIRE RATING AND/OR SOUND RATING. 15. ALL ROOMS OR AREAS WITH CEILINGS OPEN TO STRUCTURE ARE TO HAVE METAL WALL GRILLS FOR AIR DUCT OPENINGS OR AT OPEN AIR TRANSFERS. COORDINATE SIZE OF GRILLE WITH MECHANICAL DRAWINGS AND AIR FLOW REQUIREMENTS. 16. METAL FRAMING STUD SPACING MAY VARY AT LOCATIONS RECEIVING MOISTURE RESISTANT GYPSUM BOARD. INSTALL FRAMING AT WALLS, HARD CEILINGS AND SOFFITS PER MANUFACTURER'S RECOMMENDATIONS. REFER TO SPECIFICATIONS FOR A DISCRIPTION OF THE LOCATIONS TO RECEIVE MOISTURE RESISTANT GYPSUM BOARD INCLUDING BUT NOT LIMITED TO LOCATIONS ADJACENT TO PLUMBING FIXTURES. 17. THE GC SHALL CARRY FIRE WATCH COSTS TO PROVIDE PERSONNEL PER NFPA. 18. THE OWNER WILL BE REQUIRED TO SIGN OFF ON ROUGH IN AND ARCHITECTURAL DEVICES BEFORE PROCEEDING. SEE SPECIFICATION 01 4000 FOR MORE INFORMATION. 19. GC TO PROVIDE ICRA COMPLIANCE PLAN TO OWNER FOR APPROVAL PRIOR TO COMMENCING WORK. 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, Sheet Title: Sheet Information Project Information Location Project CENTRAL WING RENOVATION Sheet General Revisions Date Project Information Issuance Consultant 7/11/2017 1:31:17 PM 15924.00 G-001.1 VAIL VALLEY MEDICAL CENTER 180 S. Frontage Road West, Vail, CO 81657 SHEET INDEX AND PROJECT DATA ARCHITECT Davis Partnership Architects 2901 Blake Street Suite 100 Denver, CO 80205 P. 303.861.8555 Ann Adams ann.adams@davispartnership.com OWNER Vail Valley Medical Center 180 S Frontage Road W Vail, CO 81657 Helen Rowe helen.rowe@vvmc.com CIVIL ENGINEER Martin/Martin, Inc. 0101 Fawcett Rd. Suite 260 Avon, Co 81620 P. 970.926.6007 Mark Luna mluna@martinmartin-mtn.com OWNER REPRESENTATIVE Project One Integrated Services 88 Inverness Cir E Building G, Suite 101 Englewood, CO 80112 P. 303.917.7507 Chris Knight chrisk@projectoneis.com MECHANICAL, ELECTRICAL, PLUMBING Cator Ruma & Associates Co 896 Tabor Street Lakewood, CO 80401 P. 303.232.6200 Wayne Trader wtrader@catorruma.com CODE CONSULATANT Advanced Consulting Engineers 3900 S. Wadsworth Blvd. Suite 595 Lakewood, CO 80235 P. 720.981.4150 Masoud Sabounchi masoud@acecode.com STRUCTURAL ENGINEER Martin/Martin, Inc. 12499 W. Colfax Ave. Lakewood, CO 802015 P. 303.431.6100 Shane McCormick smccormick@martinmartin.com MEDICAL EQUIPMENT Mitchell Associates 630 Dundee RD Suite 340 Northbrook, IL 60062 360.798.7653 Matt Gibbs mgibbs@mitchellplanning.com INTERIOR DESIGNER Davis Partnership Architects 2901 Blake Street Suite 100 Denver, CO 80205 P. 303.861.8555 Janette Ray janette.ray@davispartnership.com 2017 07/11/17 PERMIT RESUBMISSION 1 1 1 ADDENDUM 1 05/23/17 1 ADDENDUM 3 06/27/17 2 ADDENDUM 4 07/06/17 3 NUMBER SHEET ISSUANCE 12 Plumbing Demolition PD101.1 LEVEL 1 AND 2 DEMOLITION WASTE AND VENT PLANS - CENTRAL PERMIT RESUBMISSION PD111.1 LEVEL 1 AND 2 DEMOLITION DOMESTIC WATER PLANS - CENTRAL PERMIT RESUBMISSION 13 Plumbing P.001.1 PLUMING LEGENDS AND NOTES PERMIT RESUBMISSION P.002.1 PLUMBING SCHEDULES & DETAILS PERMIT RESUBMISSION P.111.1 LEVEL 1 AND 2 WASTE & VENT PLANS - CENTRAL PERMIT RESUBMISSION P.121.1 LEVEL 1 AND 2 DOMESTIC WATER PLANS - CENTRAL PERMIT RESUBMISSION P.131.1 LEVEL 1 AND 2 MEDICAL GAS PLANS - CENTRAL PERMIT RESUBMISSION 14 Mechanical Demolition MD.111.1 LEVEL 1 AND 2 DEMOLITION HVAC PLANS - CENTRAL PERMIT RESUBMISSION MD.121.1 LEVEL 1 DEMOLITION HVAC PIPING PLAN - CENTRAL PERMIT RESUBMISSION 15 Mechanical M.001.1 MECHANICAL LEGENDS AND NOTES PERMIT RESUBMISSION M.002.1 MECHANICAL SCHEDULES PERMIT RESUBMISSION M.111.1 LEVEL 1 AND 2 HVAC PLANS - CENTRAL PERMIT RESUBMISSION M.117.1 ROOF HVAC PLAN - CENTRAL PERMIT RESUBMISSION M.121.1 LEVEL 1 HVAC PIPING PLAN - CENTRAL PERMIT RESUBMISSION M.401.1 MECHANICAL DETAILS PERMIT RESUBMISSION 16 Electrical Demolition ED.101.1 LEVEL 1 DEMOLITION LIGHTING PLAN - CENTRAL PERMIT RESUBMISSION ED.102.1 LEVEL 2 DEMLOITION LIGHTING PLAN - CENTRAL PERMIT RESUBMISSION ED.111.1 LEVEL 1 DEMOLITION POWER PLAN - CENTRAL PERMIT RESUBMISSION ED.112.1 LEVEL 2 DEMOLITION POWER PLAN - CENTRAL PERMIT RESUBMISSION ED.121.1 LEVEL 1 DEMOLITION FIRE ALARM PLAN - CENTRAL PERMIT RESUBMISSION ED.122.1 LEVEL 2 DEMOLITION FIRE ALARM PLAN - CENTRAL PERMIT RESUBMISSION 17 Electrical E.001.1 ELECTRICAL LEGENDS & NOTES PERMIT RESUBMISSION E.002.1 ELECTRICAL SCHEDULES PERMIT RESUBMISSION E.011.1 ELECTRICAL ONE-LINE DIAGRAM - WEST NORMAL ENTRANCE PERMIT RESUBMISSION E.012.1 ELECTRICAL ONE-LINE DIAGRAM - WEST NORMAL POWER PERMIT RESUBMISSION E.013.1 ELECTRICAL ONE-LINE DIAGRAM - WEST EMERGENCY POWER PERMIT RESUBMISSION E.014.1 ELECTRICAL ONE-LINE DIAGRAM - WEST CRITICAL AND EQUIPMENT PERMIT RESUBMISSION E.015.1 ELECTRICAL ONE-LINE DIAGRAM - EAST NORMAL POWER PERMIT RESUBMISSION E.016.1 ELECTRICAL ONE-LINE DIAGRAM - EAST EMERGENCY POWER PERMIT RESUBMISSION E.101.1 LEVEL 1 LIGHTING PLAN - CENTRAL PERMIT RESUBMISSION E.102.1 LEVEL 2 LIGHTING PLAN - CENTRAL PERMIT RESUBMISSION E.111.1 LEVEL 1 POWER PLAN - CENTRAL PERMIT RESUBMISSION E.112.1 LEVEL 2 POWER PLAN - CENTRAL PERMIT RESUBMISSION E.113.1 ROOF POWER PLAN - CENTRAL PERMIT RESUBMISSION E.121.1 LEVEL 1 FIRE ALARM PLAN - CENTRAL PERMIT RESUBMISSION E.122.1 LEVEL 2 FIRE ALARM PLAN - CENTRAL PERMIT RESUBMISSION E.301.1 ELECTRICAL PANEL SCHEDULES PERMIT RESUBMISSION E.302.1 ELECTRICAL PANEL SCHEDULES PERMIT RESUBMISSION E.401.1 ELECTRICAL DETAILS PERMIT RESUBMISSION 20 Technology Demolition TD101.1 LEVEL 1 DEMOLITION TECHNOLOGY PLAN - CENTRAL PERMIT RESUBMISSION TD102.1 LEVEL 2 DEMOLITION TECHNOLOGY PLAN - CENTRAL PERMIT RESUBMISSION 21 Technology T.001. 1 TECHNOLOGY LEGENDS & NOTES PERMIT RESUBMISSION T.101.1 LEVEL 1 TECHNOLOGY PLAN - CENTRAL PERMIT RESUBMISSION T.102.1 LEVEL 2 TECHNOLOGY PLAN - CENTRAL PERMIT RESUBMISSION 22 Equipment Q.101A ENLARGED MEDICAL EQUIPMENT PLAN - AREA A PERMIT RESUBMISSION Q.101B ENLARGED MEDICAL EQUIPMENT PLAN - AREA B PERMIT RESUBMISSION Q.101C ENLARGED MEDICAL EQUIPMENT PLAN - AREA C PERMIT RESUBMISSION NUMBER SHEET ISSUANCE 01 General G-000.1 COVER PERMIT RESUBMISSION G-001.1 SHEET INDEX AND PROJECT DATA PERMIT RESUBMISSION G-010.1 SEQUENCE PLAN #1 PERMIT RESUBMISSION G-010.2 SEQUENCE PLAN #2 PERMIT RESUBMISSION G-010.3 SEQUENCE PLAN #3 PERMIT RESUBMISSION 02 Life Safety LS000.1 CODE ANALYSIS PERMIT RESUBMISSION LS101.1 LIFE SAFETY PLAN - LEVEL 1 PERMIT RESUBMISSION LS101.2 LIFE SAFETY PLAN - LEVEL 1 - OCCUPANCY & USE PERMIT RESUBMISSION LS102.1 LIFE SAFETY PLAN - LEVEL 2 PERMIT RESUBMISSION LS102.2 LIFE SAFETY PLAN - LEVEL 2 - OCCUPANCY & USE PERMIT RESUBMISSION LS201.1 OVERALL INTERIM LIFE SAFETY PLAN - LEVEL 1 PERMIT RESUBMISSION LS201A.1 INTERIM LIFE SAFETY PLAN - AREA A PERMIT RESUBMISSION LS201B.1 INTERIM LIFE SAFETY PLAN - AREA B PERMIT RESUBMISSION LS201D.1 INTERIM LIFE LAFETY PLAN - AREA D PERMIT RESUBMISSION LS202C.1 INTERIM LIFE SAFETY PLAN - AREA C PERMIT RESUBMISSION 07 Structural S.001 GENERAL NOTES PERMIT RESUBMISSION S.002 QUALITY ASSURANCE PERMIT RESUBMISSION S.101 LEVEL 1 FRAMING PLAN PERMIT RESUBMISSION S.102 LEVEL 2 FRAMING PLAN PERMIT RESUBMISSION S.200 FRAMING DETAILS PERMIT RESUBMISSION 08 Architectural Demolition A-000.1 ABBREVIATIONS & SYMBOLS PERMIT RESUBMISSION AD101.1 OVERALL DEMOLITION PLAN - LEVEL 1 PERMIT RESUBMISSION AD101A.1 ENLARGED DEMOLITION FLOOR PLAN - AREA A PERMIT RESUBMISSION AD101B.1 ENLARGED DEMOLITION FLOOR PLAN - AREA B PERMIT RESUBMISSION AD102.1 OVERALL DEMOLITION PLAN - LEVEL 2 PERMIT RESUBMISSION AD102C.1 ENLARGED DEMOLITION FLOOR PLAN - AREA C PERMIT RESUBMISSION AD151.1 OVERALL DEMOLITION RELFECTED CEILING PLAN - LEVEL 1 PERMIT RESUBMISSION AD151A.1 ENLARGED DEMOLITION REFLECTED CEILING PLAN - AREA A PERMIT RESUBMISSION AD151B.1 ENLARGED DEMOLITION REFLECTED CEILING PLAN - AREA B PERMIT RESUBMISSION AD151D.1 ENLARGED DEMOLITION REFLECTED CEILING PLAN - AREA D PERMIT RESUBMISSION AD152.1 OVERALL DEMOLITION RELFECTED CEILING PLAN - LEVEL 2 PERMIT RESUBMISSION AD152C.1 ENLARGED DEMOLITION RELFECTED CEILING PLAN - AREA C PERMIT RESUBMISSION 09 Architectural A-101.1 OVERALL FLOOR PLAN - LEVEL 1 PERMIT RESUBMISSION A-101A.1 ENLARGED ANNOTATION FLOOR PLAN - AREA A PERMIT RESUBMISSION A-101A.2 ENLARGED DIMENSION FLOOR PLAN - AREA A PERMIT RESUBMISSION A-101B.1 ENLARGED FLOOR PLAN - AREA B PERMIT RESUBMISSION A-102.1 OVERALL FLOOR PLAN - LEVEL 2 PERMIT RESUBMISSION A-102C.1 ENLARGED ANNOTATION FLOOR PLAN - AREA C PERMIT RESUBMISSION A-102C.2 ENLARGED DIMENSION FLOOR PLAN - AREA C PERMIT RESUBMISSION A-107.1 OVERALL FLOOR PLAN - ROOF PERMIT RESUBMISSION A-151.1 OVERALL REFLECTED CEILING PLAN - LEVEL 1 PERMIT RESUBMISSION A-151A.1 ENLARGED REFLECTED CEILING PLAN AREA A PERMIT RESUBMISSION A-151B.1 ENLARGED REFLECTED CEILING PLAN AREA B PERMIT RESUBMISSION A-152.1 OVERALL REFLECTED CEILING PLAN - LEVEL 2 PERMIT RESUBMISSION A-152C.1 ENLARGED REFLECTED CEILING PLAN - LEVEL 2 - AREA C PERMIT RESUBMISSION A-200.1 EXTERIOR ELEVATION & PERSPECTIVES PERMIT RESUBMISSION A-300.1 BUILDING SECTIONS PERMIT RESUBMISSION A-310.1 WALL SECTIONS AND PERSPECTIVES - EXTERIOR PERMIT RESUBMISSION A-320.1 WALL SECTIONS AND PERSPECTIVES - INTERIOR PERMIT RESUBMISSION A-401A.1 AREA A ENLARGED PLANS AND INTERIOR ELEVATIONS PERMIT RESUBMISSION A-401A.2 AREA A ENLARGED PLANS AND INTERIOR ELEVATIONS PERMIT RESUBMISSION A-401B.1 AREA B ENLARGED PLANS AND INTERIOR ELEVATIONS PERMIT RESUBMISSION A-401C.1 AREA C ENLARGED PLANS AND INTERIOR ELEVATIONS PERMIT RESUBMISSION A-520B.1 EXTERIOR DETAILS PERMIT RESUBMISSION A-550.1 INTERIOR DETAILS PERMIT RESUBMISSION A-551.1 INTERIOR DETAILS PERMIT RESUBMISSION A-591.1 DETAILS - CASEWORK PERMIT RESUBMISSION A-592.1 DETAILS - CASEWORK PERMIT RESUBMISSION A-621A.1 ENLARGED FINISH FLOOR PLAN - AREA A PERMIT RESUBMISSION A-621B.1 ENLARGED FINISH FLOOR PLAN - AREA B PERMIT RESUBMISSION A-622C.1 ENLARGED FINISH FLOOR PLAN - AREA C PERMIT RESUBMISSION A-720.1 DOOR SCHEDULE, PARTITION TYPES, AND DETAILS PERMIT RESUBMISSION A-721.1 FRAMING DETAILS PERMIT RESUBMISSION A-740.1 WINDOW TYPES AND DETAILS PERMIT RESUBMISSION A-760.1 INTERIOR MOUNTING HEIGHTS PERMIT RESUBMISSION A-760.2 INTERIOR MOUNTING HEIGHTS/ TOILET ACCESSORIES SCHEDULE PERMIT RESUBMISSION 08/28/17