1. THE CONTRACT DOCUMENTS IN THEIR ENTIRETY ARE THE
RESPONSIBILITY OF ALL TRADES. WHERE REQUIREMENTS ARE SHOWN
IN ONE SECTION OF THE SPECIFICATIONS OR DRAWINGS BUT NOT
ANOTHER, THE CONTRACTOR OR SUBCONTRACTOR IS NOT RELIEVED
FROM PROVIDING COMPLETELY FINISHED AND PROPERLY FUNCTIONING
SYSTEMS.
2. THE CONTRACTOR / SUBCONTRACTOR SHALL BE FULLY RESPONSIBLE
FOR THE LAYOUT AND COORDINATION OF DIMENSIONS IN THE FIELD
THAT ESTABLISH WORK POINTS FOR THEIR WORK AND VARIOUS
TRADES.
3. ANY MISCELLANEOUS ITEMS OR MATERIALS NOT SPECIFICALLY NOTED,
BUT REQUIRED FOR THE PROPER EXECUTION, INSTALLATION, OR
PERFORMANCE OF THE WORK, SHALL BE PROVIDED BY THE
CONTRACTOR / SUBCONTRACTOR.
4. ALL ITEMS REQUIRING A METHOD OF PROCEDURE APPROVAL SHALL BE
SUBMITTED FOR REVIEW 21 DAY IN ADVANCE.
5. THE CONSTRUCTION SITE IS TO BE KEPT CLEAN AND FREE OF DEBRIS.
THE CONTRACTOR / SUBCONTRACTOR IS RESPONSIBLE FOR ALL
PHASES OF SECURING, HANDLING, TRANSPORTING AND DISPOSING OF
DEBRIS.
6. THE CONTRACTORS / SUBCONTRACTORS SHALL NOT SHUT OFF OR
INTERRUPT ANY SYSTEMS OR SERVICES WITHOUT FIRST COORDINATING
WITH THE OWNER.
7. THE CONTRACTOR / SUBCONTRACTORS SHALL COORDINATE WITH THE
OWNER TO IDENTIFY AND PROTECT EXISTING STRUCTURE,
ELECTRICAL/DATA/TELECOM SYSTEMS, UTILITIES, SURFACES AND
FINISHES WHICH ARE TO REMAIN. ANY DAMAGED DURING
CONSTRUCTION SHALL BE REPAIRED BY THE
CONTRACTOR/SUBCONTRACTOR.
8. DELIVERY AND STORAGE OF CONSTRUCTION MATERIALS AND
EQUIPMENT (STAGING AREAS) SHALL BE COORDINATED WITH THE
OWNER. NOT TO INTERFERE WITH HOSPITAL TRAFFIC.
9. THE CONTRACTOR / SUBCONTRACTOR SHALL TAKE CARE TO PROTECT
ALL NEWLY INSTALLED MATERIALS AND FINISHES UNTIL WORK IS
FORMALLY ACCEPTED BY THE ARCHITECT OR THE OWNER'S
REPRESENTATIVE AND TRANSFERRED TO THE OWNER
10. ALL PENETRATIONS THROUGH FLOORS, WALLS AND RATED ASSEMBLIES
AS WELL AS ALONG SLAB PERIMETERS AND SEPARATION WALL
PERIMETERS, SHALL BE SEALED AND PROTECTED WITH U.L. APPROVED
SAFETY ASSEMBLIES AND/OR PROTECTIVE DEVICES HAVING THE SAME
OR GREATER TESTED RATING AS THAT REQUIRED FOR THE ASSEMBLY
BEING PENETRATED. ALL PENETRATIONS SHALL BE PROTECTED TO
MAINTAIN FIRE RATED ASSEMBLY INTEGRITY.
11. PROVIDE ELECTROLYTIC PROTECTION / ISOLATION BETWEEN ALL
DISSIMILAR METALS, AND BETWEEN TREATED WOOD AND METALS TO
PREVENT ELECTROLYTIC REACTION AND/OR CORROSION.
12. ALL WOOD, EXCEPT ARCHITECTURAL WOODWORK, USED ON THIS
PROJECT SHALL BE FIRE RETARDANT, NON-COMBUSTIBLE TREATED AS
APPROVED FOR USE BY THE LOCAL CODE AUTHORITIES. NO WOOD
(WHETHER TREATED OR NOT) SHALL BE USED WITHIN THE CEILING
PLENUM SPACE.
13. THE CONTRACTOR / SUBCONTRACTOR SHALL PROVIDE ADEQUATE
BLOCKING, BACKING OR STRUCTURAL SUPPORT AS REQUIRED TO
PROPERLY INSTALL ALL MOUNTED ASSEMBLIES, INCLUDING ALL
ATTACHED EQUIPMENT (OWNER AND CONTRACTOR FURNISHED ITEMS),
PLUMBING FIXTURES, MILLWORK, AND CASEWORK. NOTE: ALL FRAMING
OR CONCEALED BLOCKING SHALL BE METAL BETWEEN STUDS AS IS
RECOMMMENDED FOR WALL MOUNTED ITEMS. REFER TO THE A-700
SERIES DRAWINGS FOR FUTHER INFORMATION.
14. WHERE FIRE EXTINGUISHER CABINETS, ELECTRICAL PANELS OR OTHER
EQUIPMENT OR DEVICES ARE RECESSED IN FIRE-RATED PARTITIONING
AND/OR SOUND RATED PARTITIONING, MODIFY PARTITION
CONSTRUCTION TO PROVIDE CONTINUOUS ENCLOSURE FOR
UNINTERRUPTED ASSOCIATED FIRE RATING AND/OR SOUND RATING.
15. ALL ROOMS OR AREAS WITH CEILINGS OPEN TO STRUCTURE ARE TO
HAVE METAL WALL GRILLS FOR AIR DUCT OPENINGS OR AT OPEN AIR
TRANSFERS. COORDINATE SIZE OF GRILLE WITH MECHANICAL
DRAWINGS AND AIR FLOW REQUIREMENTS.
16. METAL FRAMING STUD SPACING MAY VARY AT LOCATIONS RECEIVING
MOISTURE RESISTANT GYPSUM BOARD. INSTALL FRAMING AT WALLS,
HARD CEILINGS AND SOFFITS PER MANUFACTURER'S
RECOMMENDATIONS. REFER TO SPECIFICATIONS FOR A DISCRIPTION
OF THE LOCATIONS TO RECEIVE MOISTURE RESISTANT GYPSUM BOARD
INCLUDING BUT NOT LIMITED TO LOCATIONS ADJACENT TO PLUMBING
FIXTURES.
17. THE GC SHALL CARRY FIRE WATCH COSTS TO PROVIDE PERSONNEL PER
NFPA.
18. THE OWNER WILL BE REQUIRED TO SIGN OFF ON ROUGH IN AND
ARCHITECTURAL DEVICES BEFORE PROCEEDING. SEE SPECIFICATION 01
4000 FOR MORE INFORMATION.
19. GC TO PROVIDE ICRA COMPLIANCE PLAN TO OWNER FOR APPROVAL
PRIOR TO COMMENCING WORK.
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
Sheet Title:
Sheet Information
Project Information
Location
Project
Sheet General
Revisions Date
Project Information
Issuance
Consultant
9/1/2017 3:29:51 PM15924.00
G-001.1
SHEET INDEX
AND PROJECT
DATA
ARCHITECT
Davis Partnership Architects
2901 Blake Street
Suite 100
Denver, CO 80205
P. 303.861.8555
Scott Nevin
scott.nevin@davispartnership.com
OWNER
Vail Valley Medical Center
180 S Frontage Road W
Vail, CO 81657
CIVIL ENGINEER
Martin/Martin, Inc.
0101 Fawcett Rd.
Suite 260
Avon, Co 81620
P. 970.926.6007
Mark Luna
mluna@martinmartin-mtn.com
OWNER REPRESENTATIVE
Project One Integrated Services
88 Inverness Cir E
Building G, Suite 101
Englewood, CO 80112
P. 303.917.7507
Chris Knight
chrisk@projectoneis.com
MECHANICAL, ELECTRICAL, PLUMBING
Cator Ruma & Associates Co
896 Tabor Street
Lakewood, CO 80401
P. 303.232.6200
Wayne Trader
wtrader@catorruma.com
CODE CONSULATANT
Advanced Consulting Engineers
3900 S. Wadsworth Blvd.
Suite 595
Lakewood, CO 80235
P. 720.981.4150
Masoud Sabounchi
masoud@acecode.com
STRUCTURAL ENGINEER
Martin/Martin, Inc.
12499 W. Colfax Ave.
Lakewood, CO 802015
P. 303.431.6100
Shane McCormick
smccormick@martinmartin.com
MEDICAL EQUIPMENT
Mitchell Associates
630 Dundee RD Suite 340
Northbrook, IL 60062
360.798.7653
Matt Gibbs
mgibbs@mitchellplanning.com
INTERIOR DESIGNER
Davis Partnership Architects
2901 Blake Street
Suite 100
Denver, CO 80205
P. 303.861.8555
Janette Ray
janette.ray@davispartnership.com
LANDSCAPE
Davis Partnership Architects
2901 Blake Street
Suite 100
Denver, CO 80205
P. 303.861.8555
Lynn Moore
lynn.moore@davispartnership.com
2017
07/11/17PERMIT
RESUBMISSION
ADDENDUM 1 05/23/17 1
ASI 01 07/31/17 2
ASI 02 08/11/17 3
ASI 01R1 08/17/17 4
ASI 03 08/17/17 5
RFC0044 08/23/17 6
ASI 03R1 08/30/17 7
ASI 04 08/31/17 8
NUMBER SHEET REVISION NAMEREVISION DATE
A-622C.1 ENLARGED FINISH FLOOR PLAN - AREA C & E RFC0044 08/23/17
A-720.1 DOOR SCHEDULE, PARTITION TYPES, AND DETAILS ASI 03R1 08/30/17
A-721.1 FRAMING DETAILS
A-740.1 WINDOW TYPES AND DETAILS ASI 01 07/31/17
A-760.1 INTERIOR MOUNTING HEIGHTS RFC0008 06/20/17
A-760.2 INTERIOR MOUNTING HEIGHTS/ TOILET ACCESSORIES SCHEDULE ADDENDUM 1 05/23/17
12 Plumbing Demolition
PD101.1 LEVEL 1 AND 2 DEMOLITION WASTE AND VENT PLANS - CENTRAL ADDENDUM 1 05/23/17
PD111.1 LEVEL 1 AND 2 DEMOLITION DOMESTIC WATER PLANS - CENTRAL ASI 03R1 08/30/17
13 Plumbing
P.001.1 PLUMING LEGENDS AND NOTES
P.002.1 PLUMBING SCHEDULES & DETAILS ASI 03R1 08/30/17
P.111.1 LEVEL 1 AND 2 WASTE & VENT PLANS - CENTRAL ASI 03 08/17/17
P.121.1 LEVEL 1 AND 2 DOMESTIC WATER PLANS - CENTRAL ASI 03R1 08/30/17
P.131.1 LEVEL 1 AND 2 MEDICAL GAS PLANS - CENTRAL ASI 01R1 08/17/17
14 Mechanical Demolition
MD.111.1 LEVEL 1 AND 2 DEMOLITION HVAC PLANS - CENTRAL ASI 02 08/11/17
MD.121.1 LEVEL 1 DEMOLITION HVAC PIPING PLAN - CENTRAL ASI 02 08/11/17
15 Mechanical
M.001.1 MECHANICAL LEGENDS AND NOTES
M.002.1 MECHANICAL SCHEDULES ADDENDUM 4 07/06/17
M.111.1 LEVEL 1 AND 2 HVAC PLANS - CENTRAL ASI 03 08/17/17
M.117.1 ROOF HVAC PLAN - CENTRAL
M.121.1 LEVEL 1 HVAC PIPING PLAN - CENTRAL ASI 03 08/17/17
M.401.1 MECHANICAL DETAILS ADDENDUM 1 05/23/17
16 Electrical Demolition
ED.101.1 LEVEL 1 DEMOLITION LIGHTING PLAN - CENTRAL ADDENDUM 1 05/23/17
ED.102.1 LEVEL 2 DEMLOITION LIGHTING PLAN - CENTRAL ASI 02 08/11/17
ED.111.1 LEVEL 1 DEMOLITION POWER PLAN - CENTRAL
ED.112.1 LEVEL 2 DEMOLITION POWER PLAN - CENTRAL ASI 02 08/11/17
ED.121.1 LEVEL 1 DEMOLITION FIRE ALARM PLAN - CENTRAL ADDENDUM 1 05/23/17
ED.122.1 LEVEL 2 DEMOLITION FIRE ALARM PLAN - CENTRAL ASI 02 08/11/17
17 Electrical
E.001.1 ELECTRICAL LEGENDS & NOTES
E.002.1 ELECTRICAL SCHEDULES ASI 02 08/11/17
E.011.1 ELECTRICAL ONE-LINE DIAGRAM - WEST NORMAL ENTRANCE
E.012.1 ELECTRICAL ONE-LINE DIAGRAM - WEST NORMAL POWER
E.013.1 ELECTRICAL ONE-LINE DIAGRAM - WEST EMERGENCY POWER
E.014.1 ELECTRICAL ONE-LINE DIAGRAM - WEST CRITICAL AND EQUIPMENT
E.015.1 ELECTRICAL ONE-LINE DIAGRAM - EAST NORMAL POWER
E.016.1 ELECTRICAL ONE-LINE DIAGRAM - EAST EMERGENCY POWER
E.101.1 LEVEL 1 LIGHTING PLAN - CENTRAL ASI 03 08/17/17
E.102.1 LEVEL 2 LIGHTING PLAN - CENTRAL ASI 01R1 08/17/17
E.111.1 LEVEL 1 POWER PLAN - CENTRAL ASI 03 08/17/17
E.112.1 LEVEL 2 POWER PLAN - CENTRAL ASI 01R1 08/17/17
E.113.1 ROOF POWER PLAN - CENTRAL ADDENDUM 1 05/23/17
E.121.1 LEVEL 1 FIRE ALARM PLAN - CENTRAL ASI 03 08/17/17
E.122.1 LEVEL 2 FIRE ALARM PLAN - CENTRAL ASI 01R1 08/17/17
E.301.1 ELECTRICAL PANEL SCHEDULES ASI 02 08/11/17
E.303.1 ELECTRICAL PANEL SCHEDULES ASI 01R1 08/17/17
E.401.1 ELECTRICAL DETAILS
20 Technology Demolition
TD101.1 LEVEL 1 DEMOLITION TECHNOLOGY PLAN - CENTRAL ADDENDUM 3 06/27/17
TD102.1 LEVEL 2 DEMOLITION TECHNOLOGY PLAN - CENTRAL ASI 02 08/11/17
21 Technology
T.001. 1 TECHNOLOGY LEGENDS & NOTES
T.101.1 LEVEL 1 TECHNOLOGY PLAN - CENTRAL ASI 03R1 08/30/17
T.102.1 LEVEL 2 TECHNOLOGY PLAN - CENTRAL ASI 03 08/17/17
22 Equipment
Q.101A ENLARGED MEDICAL EQUIPMENT PLAN - AREA A ADDENDUM 1 05/23/17
Q.101B ENLARGED MEDICAL EQUIPMENT PLAN - AREA B
Q.102C ENLARGED MEDICAL EQUIPMENT PLAN - AREA C
Q.102E ENLARGED MEDICAL EQUIPMENT PLAN - AREA E ASI 02 08/11/17
NUMBER SHEET REVISION NAMEREVISION DATE
01 General
G-001.1 SHEET INDEX AND PROJECT DATA ASI 04 08/31/17
G-010.1 SEQUENCE PLAN #1 ADDENDUM 1 05/23/17
G-010.2 SEQUENCE PLAN #2 ADDENDUM 1 05/23/17
G-010.3 SEQUENCE PLAN #3 ADDENDUM 1 05/23/17
02 Life Safety
LS000.1 CODE ANALYSIS
LS101.1 LIFE SAFETY PLAN - LEVEL 1 ADDENDUM 3 06/27/17
LS101.2 LIFE SAFETY PLAN - LEVEL 1 - OCCUPANCY & USE ADDENDUM 3 06/27/17
LS101.3 FIRE PROTECTION PLAN LEVEL 1 ADDENDUM 3 06/27/17
LS102.1 LIFE SAFETY PLAN - LEVEL 2 RFC0044 08/23/17
LS102.2 LIFE SAFETY PLAN - LEVEL 2 - OCCUPANCY & USE RFC0044 08/23/17
LS201.1 OVERALL INTERIM LIFE SAFETY PLAN - LEVEL 1 ADDENDUM 3 06/27/17
LS201A.1 INTERIM LIFE SAFETY PLAN - AREA A ADDENDUM 3 06/27/17
LS201B.1 INTERIM LIFE SAFETY PLAN - AREA B ADDENDUM 1 05/23/17
LS201D.1 INTERIM LIFE LAFETY PLAN - AREA D ADDENDUM 1 05/23/17
LS202C.1 INTERIM LIFE SAFETY PLAN - AREA C RFC0044 08/23/17
07 Structural
S.001 GENERAL NOTES
S.002 QUALITY ASSURANCE
S.101 LEVEL 1 FRAMING PLAN ASI 04 08/31/17
S.102 LEVEL 2 FRAMING PLAN ASI 04 08/31/17
S.200 FRAMING DETAILS ASI 04 08/31/17
08 Architectural Demolition
A-000.1 ABBREVIATIONS & SYMBOLS
AD101.1 OVERALL DEMOLITION PLAN - LEVEL 1 ASI 02 08/11/17
AD101A.1 ENLARGED DEMOLITION FLOOR PLAN - AREA A ASI 03R1 08/30/17
AD101B.1 ENLARGED DEMOLITION FLOOR PLAN - AREA B ADDENDUM 1 05/23/17
AD102.1 OVERALL DEMOLITION PLAN - LEVEL 2 ADDENDUM 1 05/23/17
AD102C.1 ENLARGED DEMOLITION FLOOR PLAN - AREA C ADDENDUM 1 05/23/17
AD151.1 OVERALL DEMOLITION RELFECTED CEILING PLAN - LEVEL 1 ADDENDUM 3 06/27/17
AD151A.1 ENLARGED DEMOLITION REFLECTED CEILING PLAN - AREA A ADDENDUM 3 06/27/17
AD151B.1 ENLARGED DEMOLITION REFLECTED CEILING PLAN - AREA B ADDENDUM 1 05/23/17
AD151D.1 ENLARGED DEMOLITION REFLECTED CEILING PLAN - AREA D ADDENDUM 1 05/23/17
AD152.1 OVERALL DEMOLITION RELFECTED CEILING PLAN - LEVEL 2 ADDENDUM 1 05/23/17
AD152C.1 ENLARGED DEMOLITION RELFECTED CEILING PLAN - AREA C ADDENDUM 1 05/23/17
09 Architectural
A-101.1 OVERALL FLOOR PLAN - LEVEL 1 ASI 02 08/11/17
A-101A.1 ENLARGED ANNOTATION FLOOR PLAN - AREA A ASI 04 08/31/17
A-101A.2 ENLARGED DIMENSION FLOOR PLAN - AREA A ASI 02 08/11/17
A-101B.1 ENLARGED FLOOR PLAN - AREA B RFC040 08/22/17
A-102.1 OVERALL FLOOR PLAN - LEVEL 2 RFC0044 08/23/17
A-102C.1 ENLARGED ANNOTATION FLOOR PLAN - AREA C RFC0044 08/23/17
A-102C.2 ENLARGED DIMENSION FLOOR PLAN - AREA C RFC0044 08/23/17
A-102E.1 ENLARGED FLOOR PLANS - AREA E ASI 01R1 08/17/17
A-107.1 OVERALL FLOOR PLAN - ROOF
A-151.1 OVERALL REFLECTED CEILING PLAN - LEVEL 1 ASI 02 08/11/17
A-151A.1 ENLARGED REFLECTED CEILING PLAN AREA A ASI 04 08/31/17
A-151B.1 ENLARGED REFLECTED CEILING PLAN AREA B RFC040 08/22/17
A-152.1 OVERALL REFLECTED CEILING PLAN - LEVEL 2 RFC0044 08/23/17
A-152C.1 ENLARGED REFLECTED CEILING PLAN - LEVEL 2 - AREA C RFC0044 08/23/17
A-152E.1 ENLARGED REFLECTED CEILING PLAN - LEVEL 2 - AREA E ASI 01R1 08/17/17
A-200.1 EXTERIOR ELEVATION & PERSPECTIVES ADDENDUM 1 05/23/17
A-300.1 BUILDING SECTIONS ADDENDUM 1 05/23/17
A-310.1 WALL SECTIONS AND PERSPECTIVES - EXTERIOR ADDENDUM 1 05/23/17
A-320.1 WALL SECTIONS AND PERSPECTIVES - INTERIOR
A-401A.1 AREA A ENLARGED PLANS AND INTERIOR ELEVATIONS RFC0047 08/14/17
A-401A.2 AREA A ENLARGED PLANS AND INTERIOR ELEVATIONS ASI 02 08/11/17
A-401B.1 AREA B ENLARGED PLANS AND INTERIOR ELEVATIONS ASI 02 08/11/17
A-401C.1 INTERIOR ELEVATIONS - AREA C ADDENDUM 1 05/23/17
A-401E.1 AREA E ENLARGED PLANS AND INTERIOR ELEVATIONS ASI 01R1 08/17/17
A-520B.1 EXTERIOR DETAILS ADDENDUM 1 05/23/17
A-550.1 INTERIOR DETAILS RFC0047 08/14/17
A-551.1 INTERIOR DETAILS ASI 04 08/31/17
A-591.1 DETAILS - CASEWORK ASI 02 08/11/17
A-592.1 DETAILS - CASEWORK ASI 01R1 08/17/17
A-621A.1 ENLARGED FINISH FLOOR PLAN - AREA A ASI 03R1 08/30/17
A-621B.1 ENLARGED FINISH FLOOR PLAN - AREA B ASI 03R1 08/30/17
CENTRAL
WING RENOVATION
VAIL VALLEY
MEDICAL
CENTER
180 S. Frontage
Road West, Vail, CO 8165710/25/17