HomeMy WebLinkAboutB17-0092_G-010.1_1503950469.pdfREF.
UP
REF.
REF.
UP
DN
REF.
REF.
REF.
FD
FD
SEQUENCE #1
SEQUENCE #1
SCOPE INCLUDES
INTERIOR RENOVATION
OF AN OFFICE AREA (ADMINISTRATION)
EXIT TO BE USED FOR
CONSTRUCTION ONLY
ED EGRESS TO BE MAINTAINED
TEMPORARY ENTRY
REMOVED
EGRESS THROUGH
FRONT LOBBY TO BE
MAINTAINED
SCOPE
INCLUDES
PHARMACY
CONSTRUCTION
SEQUENCE # 1
SCOPE INCLUDES
INSTALLATION
OF EXHUAST FAN
AND DUCTWORK
SEQUENCE # 1
SEQUENCE #1
SCOPE INCLUDES
REPLACEMENT OF
EXISTING EXHAUST FAN.
SCOPE INCLUDES
INSTALLATION OF DUCT
AND EXHAUST FAN.
CONSTRUCTION SEQUENCE #1 LEGEND
GENERAL NOTES:
• FOR INTERIM LIFE SAFETY PLANS AND NOTES, SEE LS200A.1, LS200B.1, AND LS200C.1
• TEMPORARY PARTITIONS TO COMPLY WITH 2012 NFPA 241.
• WORK IMPACTING EGRESS TO OCCUR OFF HOURS AND BE MAINTAINED BY FIRE WATCH
• FIRE DEPARTMENT STAGING TO BE MAINTAINED THROUGHOUT SEQUENCE.
AREA NOT IN SCOPE
AREA OF SEQUENCE #1 - ADMINISTRATION
PLANNED TIMELINE: 05/08/17 - 10/20/17
NOTE: SPACE IS NON-OCCUPIED DURING
CONSTRUCTION AND DOES NOT IMPACT BUILDING
OCCUPANT EGRESS.
AREA OF SEQUENCE #1 - INPATIENT PHARMACY
PLANNED TIMELINE: 06/05/17 - 10/20/17
NOTE: SPACE IS NON-OCCUPIED DURING
CONSTRUCTION BUT ILSM IS REQUIRED FOR
OCCUPANT SAFETY.
TEMPORARY PARTITION - COMPLIANT WITH NFPA
REDUCED CORRIDOR WIDTH WITH TEMPORARY
PARTITION - MIN 4' - 0"
4'-0" MIN
EXIT DISCHARGE
EXIT ACCESS
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
CENTRAL
WING
RENOVATION
7/11/2017
10:28:18 AM
15924.00
G-010.1
SEQUENCE PLAN #1
2017
07/11/17
PERMIT
RESUBMISSION
VAIL
VALLEY
MEDICAL
CENTER
180 S. Frontage
Road
West,
Vail, CO 81657
1" = 30'-0" A2
PROPOSED SEQUENCE #1 PLAN - LEVEL 1
1" = 30'-0"
B2
PROPOSED SEQUENCE #1 PLAN - LEVEL 2
1" = 30'-0"
D2
PROPOSED SEQUENCE #1 PLAN - ROOF
NORTH
NORTH
NORTH
ADDENDUM 1 05/23/17 1
08/28/17