Loading...
HomeMy WebLinkAboutB17-0092_G-010.1_1508947560.pdfREF. UP REF. REF. UPDN REF. REF. REF. FD FD SEQUENCE #1 SEQUENCE #1 SCOPE INCLUDES INTERIOR RENOVATION OF AN OFFICE AREA (ADMINISTRATION) EXIT TO BE USED FOR CONSTRUCTION ONLY ED EGRESS TO BE MAINTAINED TEMPORARY ENTRY REMOVED EGRESS THROUGH FRONT LOBBY TO BE MAINTAINED SCOPE INCLUDES PHARMACY CONSTRUCTION SEQUENCE # 1 SCOPE INCLUDES INSTALLATION OF EXHUAST FAN AND DUCTWORK SEQUENCE # 1 SEQUENCE #1 SCOPE INCLUDES REPLACEMENT OF EXISTING EXHAUST FAN. SCOPE INCLUDES INSTALLATION OF DUCT AND EXHAUST FAN. CONSTRUCTION SEQUENCE #1 LEGEND GENERAL NOTES: • FOR INTERIM LIFE SAFETY PLANS AND NOTES, SEE LS200A.1, LS200B.1, AND LS200C.1 • TEMPORARY PARTITIONS TO COMPLY WITH 2012 NFPA 241. • WORK IMPACTING EGRESS TO OCCUR OFF HOURS AND BE MAINTAINED BY FIRE WATCH • FIRE DEPARTMENT STAGING TO BE MAINTAINED THROUGHOUT SEQUENCE. AREA NOT IN SCOPE AREA OF SEQUENCE #1 - ADMINISTRATION PLANNED TIMELINE: 05/08/17 - 10/20/17 NOTE: SPACE IS NON-OCCUPIED DURING CONSTRUCTION AND DOES NOT IMPACT BUILDING OCCUPANT EGRESS. AREA OF SEQUENCE #1 - INPATIENT PHARMACY PLANNED TIMELINE: 06/05/17 - 10/20/17 NOTE: SPACE IS NON-OCCUPIED DURING CONSTRUCTION BUT ILSM IS REQUIRED FOR OCCUPANT SAFETY. TEMPORARY PARTITION - COMPLIANT WITH NFPA REDUCED CORRIDOR WIDTH WITH TEMPORARY PARTITION - MIN 4' - 0"4'-0" MINEXIT DISCHARGE EXIT ACCESS 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant CENTRAL WING RENOVATION 7/11/2017 10:28:18 AM15924.00 G-010.1 SEQUENCE PLAN #1 2017 07/11/17PERMIT RESUBMISSION VAIL VALLEY MEDICAL CENTER 180 S. Frontage Road West, Vail, CO 81657 1" = 30'-0" A2 PROPOSED SEQUENCE #1 PLAN - LEVEL 1 1" = 30'-0"B2 PROPOSED SEQUENCE #1 PLAN - LEVEL 2 1" = 30'-0"D2 PROPOSED SEQUENCE #1 PLAN - ROOF NORTH NORTH NORTH ADDENDUM 1 05/23/17 1 10/25/17