SEQUENCE #2
SCOPE INCLUDES
NUCLEAR MEDICINE SUITE
BUILD OUT AND ABOVE-CEILNG
CORRIDOR MODIFICATIONS.
WORK IN COORIDOR TO BE
PROVIDED IN TWO PHASES
TO ALLOW FOR EGRESS
AT ALL TIMES THROUGH CORRIDOR
TO BE MAINTAINED.
EXIT TO BE USED
BY CONTRACTOR ONLY
EGRESS FROM CARDIOPULMONARY TO BE
MAINTAINED THROUGH THIS EGRESS PATHWAY
EMERGENCY ONLY EGRESS TO BE MAINTAINED BY
CONTRACTOR AT THIS LOCATION
EMERGENCY EGRESS TO BE MAINTAINED BY
CONTRACTOR AT THIS LOCATION
4' - 0"
4' - 0"
4' - 0"
EXISTING CORRIDOR ACCESS WOULD NOT BE ACCESSIBLE
BY THE PUBLIC AT THIS LOCATION.
PASSAGE THROUGH EXISTING CORRIDOR
TO BE MAINTAINED AT ALL TIMES.
SEQUENCE #2
SCOPE INCLUDES
BUILD OUT OF CLINIC SPACE.
EGRESS BY
CONTRACTOR ONLY.
EXISTING EGRESS TO BE MAINTAINED
DURING CONSTRUCTION.
CONSTRUCTION SEQUENCE #2 LEGEND
AREA NOT IN SCOPE
AREA OF SEQUENCE #2 - NUCLEAR MEDICINE SUITE
PLANNED TIMELINE: 05/08/17 - 9/13/17
NOTE: SPACE IS NON-OCCUPIED DURING
CONSTRUCTION BUT ILSM IS REQUIRED FOR
OCCUPANT SAFETY.
AREA OF SEQUENCE #2 - CLINIC (MSA)
PLANNED TIMELINE: 06/15/17 - 9/01/17
NOTE: SPACE IS NON-OCCUPIED DURING
CONSTRUCTION AND DOES NOT IMPACT BUILDING
OCCUPANT EGRESS.
REDUCED CORRIDOR WIDTH - MIN 4' - 0" 4'-0" MIN
EXIT DISCHARGE
EXIT ACCESS
GENERAL NOTES:
• FOR INTERIM LIFE SAFETY PLANS AND NOTES, SEE LS200A.1, LS200B.1, AND LS200C.1
• TEMPORARY PARTITIONS TO COMPLY WITH 2012 NFPA 241.
• WORK IMPACTING EGRESS TO OCCUR OFF HOURS AND BE MAINTAINED BY FIRE WATCH
• FIRE DEPARTMENT STAGING TO BE MAINTAINED THROUGHOUT SEQUENCE.
TEMPORARY PARTITION - COMPLIANT WITH NFPA
2901 Blake Street, Suite
100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
CENTRAL
WING
RENOVATION
5/15/2017
1:30:59 PM
15924.00
G-010.2
SEQUENCE PLAN #2
2017
05/09/17
PERMIT
RESUBMISSION
VAIL
VALLEY
MEDICAL
CENTER
180 S. Frontage
Road
West,
Vail, CO 81657
1" = 30'-0"
A2
PROPOSED SEQUENCE #2 PLAN - LEVEL 1
NORTH
NORTH
NORTH
1" = 30'-0"
B2
PROPOSED SEQUENCE #2 PLAN - LEVEL 2
1" = 30'-0"
D2
PROPOSED SEQUENCE #2 PLAN - ROOF