SEQUENCE #3
THIS SUITE TO BE VACATED
DURING CONSTRUCTION.
EGRESS THROUGH CORRIDOR TO BE MAINTAINED
SCOPE INCLUDES BUILD OUT
OF EXISTING CARDIO PULMONARY
SUITE ENTRY MODIFICATION
CONSTRUCTION ONLY EGRESS
CONSTRUCTION ONLY EGRESS;
EGRESS TO BE MAINTAINED
BY CONTRACTOR
CONSTRUCTION SEQUENCE #3 LEGEND
AREA NOT IN SCOPE
AREA OF SEQUENCE #3 - MATERIALS MANAGEMENT
PLANNED TIMELINE: 06/05/17 - 10/20/17
NOTE: SPACE IS NON-OCCUPIED DURING
CONSTRUCTION AND DOES NOT IMPACT BUILDING
OCCUPANT EGRESS.
TEMPORARY PARTITION - COMPLIANT WITH NFPA 241
REDUCED CORRIDOR WIDTH WITH TEMPORARY
PARTITION - MIN 4' - 0"
4'-0" MIN
EXIT DISCHARGE
EXIT ACCESS
GENERAL NOTES:
• FOR INTERIM LIFE SAFETY PLANS AND NOTES, SEE LS200A.1, LS200B.1, AND LS200C.1
• TEMPORARY PARTITIONS TO COMPLY WITH 2012 NFPA 241.
• WORK IMPACTING EGRESS TO OCCUR OFF HOURS AND BE MAINTAINED BY FIRE WATCH
• FIRE DEPARTMENT STAGING TO BE MAINTAINED THROUGHOUT SEQUENCE.
2901 Blake Street, Suite
100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
CENTRAL
WING
RENOVATION
5/15/2017
1:31:08 PM
15924.00
G-010.3
SEQUENCE PLAN #3
2017
05/09/17
PERMIT
RESUBMISSION
VAIL
VALLEY
MEDICAL
CENTER
180 S. Frontage
Road
West,
Vail, CO 81657
NORTH
NORTH
NORTH
1" = 30'-0" A1
PROPOSED SEQUENCE #3 PLAN - LEVEL 1
1" = 30'-0"
B2
PROPOSED SEQUENCE #3 PLAN - LEVEL 2
1" = 30'-0"
D3
PROPOSED SEQUENCE PLAN - ROOF
06/30/17