Loading...
HomeMy WebLinkAboutB17-0092_G-010.3_1498849140.pdfUP UP DN REF. REF. REF. FD FD SEQUENCE #3 THIS SUITE TO BE VACATED DURING CONSTRUCTION. EGRESS THROUGH CORRIDOR TO BE MAINTAINED SCOPE INCLUDES BUILD OUT OF EXISTING CARDIO PULMONARY SUITE ENTRY MODIFICATION CONSTRUCTION ONLY EGRESS CONSTRUCTION ONLY EGRESS; EGRESS TO BE MAINTAINED BY CONTRACTOR CONSTRUCTION SEQUENCE #3 LEGEND AREA NOT IN SCOPE AREA OF SEQUENCE #3 - MATERIALS MANAGEMENT PLANNED TIMELINE: 06/05/17 - 10/20/17 NOTE: SPACE IS NON-OCCUPIED DURING CONSTRUCTION AND DOES NOT IMPACT BUILDING OCCUPANT EGRESS. TEMPORARY PARTITION - COMPLIANT WITH NFPA 241 REDUCED CORRIDOR WIDTH WITH TEMPORARY PARTITION - MIN 4' - 0" 4'-0" MIN EXIT DISCHARGE EXIT ACCESS GENERAL NOTES: • FOR INTERIM LIFE SAFETY PLANS AND NOTES, SEE LS200A.1, LS200B.1, AND LS200C.1 • TEMPORARY PARTITIONS TO COMPLY WITH 2012 NFPA 241. • WORK IMPACTING EGRESS TO OCCUR OFF HOURS AND BE MAINTAINED BY FIRE WATCH • FIRE DEPARTMENT STAGING TO BE MAINTAINED THROUGHOUT SEQUENCE. 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant CENTRAL WING RENOVATION 5/15/2017 1:31:08 PM 15924.00 G-010.3 SEQUENCE PLAN #3 2017 05/09/17 PERMIT RESUBMISSION VAIL VALLEY MEDICAL CENTER 180 S. Frontage Road West, Vail, CO 81657 NORTH NORTH NORTH 1" = 30'-0" A1 PROPOSED SEQUENCE #3 PLAN - LEVEL 1 1" = 30'-0" B2 PROPOSED SEQUENCE #3 PLAN - LEVEL 2 1" = 30'-0" D3 PROPOSED SEQUENCE PLAN - ROOF 06/30/17