SEQUENCE #3
THIS SUITE TO BE VACATED
DURING CONSTRUCTION.
EGRESS THROUGH CORRIDOR TO BE MAINTAINED
SCOPE INCLUDES BUILD OUT
OF EXISTING CARDIO PULMONARY
SUITE ENTRY MODIFICATION
CONSTRUCTION ONLY EGRESS
CONSTRUCTION ONLY EGRESS;
EGRESS TO BE MAINTAINED
BY CONTRACTOR
SEQUENCE #3
SCOPE INCLUDES DEMOLITION
AND NEW CONSTRUCTION OF
EXISTING CARDIO PULMONARY AREA
INTO MATERIALS MANAGEMENT AREA.
1
CONSTRUCTION SEQUENCE #3 LEGEND
AREA NOT IN SCOPE
AREA OF SEQUENCE #3 - MATERIALS MANAGEMENT
PLANNED TIMELINE: 06/05/17 - 10/20/17
NOTE: SPACE IS NON-OCCUPIED DURING
CONSTRUCTION AND DOES NOT IMPACT BUILDING
OCCUPANT EGRESS.
TEMPORARY PARTITION - COMPLIANT WITH NFPA 241
REDUCED CORRIDOR WIDTH WITH TEMPORARY
PARTITION - MIN 4' - 0"4'-0" MINEXIT DISCHARGE
EXIT ACCESS
GENERAL NOTES:
• FOR INTERIM LIFE SAFETY PLANS AND NOTES, SEE LS200A.1, LS200B.1, AND LS200C.1
• TEMPORARY PARTITIONS TO COMPLY WITH 2012 NFPA 241.
• WORK IMPACTING EGRESS TO OCCUR OFF HOURS AND BE MAINTAINED BY FIRE WATCH
• FIRE DEPARTMENT STAGING TO BE MAINTAINED THROUGHOUT SEQUENCE.
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
CENTRAL WING RENOVATION
7/11/2017 10:29:00 AM15924.00
G-010.3
SEQUENCE PLAN #3
2017
07/11/17PERMIT
RESUBMISSION
VAIL VALLEY
MEDICAL
CENTER
180 S. Frontage
Road West, Vail, CO 81657NORTH
NORTH
NORTH
1" = 30'-0"A1 PROPOSED SEQUENCE #3 PLAN - LEVEL 1
1" = 30'-0"B2 PROPOSED SEQUENCE #3 PLAN - LEVEL 2
1" = 30'-0"D3 PROPOSED SEQUENCE PLAN - ROOF
ADDENDUM 1 05/23/17 1
10/25/17