HomeMy WebLinkAboutB17-0092_LS000.1_1498849080.pdfEXISTING FIRE RESISTIVE REQUIREMENTS TO BE MAINTAINED:
STRUCTURAL FRAME
BEAMS
COLUMNS
EXTERIOR BEARING WALLS
INTERIOR BEARING WALLS
EXTERIOR NONBEARING WALLS
FLOOR CONSTRUCTION
ROOF CONSTRUCTION & CANOPY
SHAFT & VERTICAL EXIT ENCLOSURES
EXTERIOR OPENINGS
IBC
RATING
TEST NFPA
RATING
CONSTRUCTION (TYPE I B) (II-222)
UL 263
UL 790
IBC: 2 HR (TO MATCH FLOOR RATING)
NFPA: 2 HR IF 4+ STORIES, 1 HR IF >4 STORIES, EXISTING ENCLOSURES = 0.5 HR.
NOTE : REFER TO PARTITION TYPES SCHEDULE ON A720.1 FOR UL ASSEMBLIES AT ADDITIONAL
INTERIOR PARTITIONS AND WALL RATINGS AND SPECIFICATION SECTION 078413 PENETRATION
FIRESTOPPING FOR USE OF UL ASSEMBLIES AT THROUGH-PENETRATION FIRESTOP CONDITIONS.
REMARKS
2 HR
2 HR
2 HR
2 HR
0 HR
2 HR
1 HR
2 HR
2 HR
2 HR
2 HR
2 HR
1 HR
2 HR
1 HR
2 HR
1.5 HR
NOTE:
WORK TIMES LIMITED BY "VAIL 2016 VAIL VILLAGE AND LIONSHEAD VILLAGE CONSTRUCTION
INFORMATION HANDOUT" IN ADDITION TO OWNER REQUIREMENTS.
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP, P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
CENTRAL
WING
RENOVATION
3/10/2017
3:40:17 PM
15924.00
LS000.1
CODE ANALYSIS
2017
03/10/17
PERMIT VAIL
VALLEY
MEDICAL
CENTER
180 S. Frontage
Road
West,
Vail, CO 81657
06/30/17