STEAM HUMIDIFIER SCHEDULE
AIR FLOW CONDITIONS DUCT AREA AIR AIR STEAM MAXIMUM
DESIG. MFR. MODEL LEVEL SERVICE CFM AT EAT COOLING EAT HEATING LEAVING AIR W H VELOCITY PRESS PRESSURE (PSIG) LBS/HR VAPOR CONTROL REMARKS
ELEV °F %RH °F %RH TEMP %RH (IN) (IN) (FPM) DROP BEFORE AFTER ABSORBTION
RISE (IN WC) CONTROL CONTROL DISTANCE
FEET °F VALVE VALVE (INCHES)
H-N1 DRI-STEAM ULTRASORB XV 1 NUC MED 2430 53 10% 53 5% 2.4 60% 20 20 875 0.05 15 58 18 SEE SPEC ALL
REMARKS:
1. PROVIDE DUCT MOUNTED HUMIDISTAT SENSOR
2. PROVIDE HUMIDISTAT IN ROOM.
3. REFER TO HUMIDIFIER PIPING DETAIL FOR MORE INSTALLATION REQUIREMENTS INCLUDING DUCTWORK.
7/6/2017 13:12
8,150 8,150
FAN SCHEDULE
FAN WHEEL CFM S.P. APPROX. TIP OUTLET MOTOR VIBRATION DRIVE DAMPER APPROX. ARRANGE. SOUND OCTAVE BAND & CENTER BAND FREQUENCY SIZE (INCHES) OPER.
DESIG. MFR. MODEL FAN TYPE SERVICE CLASS DIA. AT ELEV IN. W.C. RPM SPEED VELOCITY REQ'D MAX ECM VFD/ VFD ISOLATOR TYPE TYPE THROAT & BAND 1 2 3 4 5 6 7 8 L W H WEIGHT CONTROL REMARKS
(INCHES) (FPM) (FPM) BHP HP (YES/ RELAY/ BYPASS TYPE DIM. MOUNTING Hz 63 125 250 500 1000 2000 4000 8000 LBS.
FEET FEET SIZE NO) STARTER (YES/NO) LOCATION
EF-16 GREENHECK USF-207-BI UTILITY CHEMO HOOD II 700 2.50 3175 8,729 1,107 0.85 1 1/2 NO VFD NO SEE SPEC DIRECT SEE SPEC 13.00 UPBLAST INLET 90 89 86 87 84 78 73 66 20 16 26 113 SEE SPEC
EF-17 GREENHECK GB-200HP UTILITY
ADMIN AREA GENERAL
EXHAUST
II 1,700 1.50 1252 7,005 NA 0.91 1 1/2 NO VFD NO SEE SPEC DIRECT SEE SPEC 30X30 DOWNBLAST INLET 92 85 81 77 75 71 69 66 36 36 28 101 SEE SPEC
REMARKS:
1. REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS.
2. PROVIDE SHAFT GROUNDING RINGS FOR EACH BEARING ON MOTORS POWERED THROUGH VARIABLE FREQUENCY DRIVES.
7/6/2017 13:12
AIR DEVICE SCHEDULE
DESIG. FUNCTION STYLE MFR. MODEL FRAME MODULE MATERIAL FINISH REMARKS
STYLE SIZE
A CEILING SUPPLY
PLAQUE FACE FIXED PATTERN
RECTANGULAR DIFFUSER
TITUS TDV LAY-IN OR
SURFACE
SEE PLANS STEEL WHITE NOTE 1
B CEILING RETURN, EXHAUST PERFORATED TITUS PAR LAY-IN OR
SURFACE
24x24 STEEL/ ALUMINUM WHITE NOTE 1,2,3
C SIDEWALL SUPPLY
ADJUST VANES, DOUBLE
DEFLECTION, 3/4" O.C.TITUS 300RL SURFACE SEE PLANS STEEL WHITE NOTE 1
D CEILING SUPPLY (2) 1" LINEAR SLOTS TITUS 350RL-SS SURFACE
NOMINAL 24" & 48"
LENGTH
STAINLESS STEEL WHITE NOTE 1
E SIDEWALL/CEILING RETURN,
EXHAUST
ADJUST VANES, DOUBLE
DEFLECTION, 3/4" O.C.TITUS 350RL-SS SURFACE SEE PLANS STEEL WHITE NOTE 1
F PHARMACY SUPPLY RADIAL HEPA TITUS TRITEC-AL SURFACE 24X48 ALUMINUM WHITE NOTE 4
REMARKS:
GENERAL - APPLIES TO ALL AIR DEVICES: MANUAL VOLUME DAMPERS SHALL BE ACCEPTABLE IN DUCTWORK AT THE BRANCH POINT OF THE RUNOUT DUCT OR IN-LINE TO THE AIR DEVICE BY THE
CONTRACTOR INSTALLING DUCTWORK. A DAMPER LOCATED AT THE AIR DEVICE SHALL BE ACCEPTABLE WHEN PERMITTED BY ENGINEER ON A CASE-BY-CASE BASIS OR WHEN THE MANUFACTURER
REQUIRES AN INTEGRAL MANUAL VOLUME DAMPER.
1. PROVIDE MODULE SIZE TO FIT CEILING TYPE; SEE PLANS FOR NECK SIZES.
2. PROVIDE OBD WHERE GRILLES ARE SHOWN IN A HARD LID CEILING AND THERE IS NO ACCESSIBLE MVD. PROVIDE TRM-S MOUNTING FRAMES IN HARD LID CEILINGS.
3. PROVIDE ALUMINUM FOR ALL WET AREAS.
4. PROVIDE WITH HEPA FILTER
7/6/2017 13:12
8150 8150 8150
135
180
135
135
135
135
280
625
175
135
200
135
150
135
1,250
480
1,400
700
355
TERMINAL BOX SCHEDULE (HOT WATER HEAT)
FINAL INTERIOR AIR PRESS COOLING DESIGN CFM HEATING HEATING WATER COIL DATA MODULATING
DESIG TAG OR MFR MODEL INLET DROP MAX MAXIMUM MINIMUM DESIGN CFM EAT LAT MBH GPM WATER EWT CONTROL SOUND REMARKS
(NOTE H) PERIMETER DIA. (IN WC) ELEV FT ELEV FT ELEV FT °F °F P.D. MAX °F VALVE TYPE ATTENUATOR
ZONE (IN.) (SEA LEVEL) (FT WC)
VAV-(E)102 INTERIOR TITUS EXIST 6 0.64 360 135 55 80 2.7 0.5 6.00 180 2-WAY NO 1, 5
VAV-(N)102A INTERIOR PRICE SDV 8 8 0.64 600 180 55 80 3.6 0.5 6.00 180 2-WAY NO 2
VAV-(E)103 INTERIOR TITUS EXIST 6 0.64 350 135 55 80 2.7 0.5 6.00 180 2-WAY NO 1, 5
VAV-(E)104 INTERIOR TITUS EXIST 6 0.64 300 135 55 80 2.7 0.5 6.00 180 2-WAY NO 1, 5
VAV-(E)105 INTERIOR TITUS EXIST 6 0.64 250 135 55 80 2.7 0.5 6.00 180 2-WAY NO 1, 5
VAV-(N)105A INTERIOR PRICE SDV 8 8 0.64 450 135 55 80 2.7 0.5 6.00 180 2-WAY NO 2
VAV-(E)106 TITUS EXIST 5
VAV-(R)107 INTERIOR TITUS EXIST 6 0.64 355 280 55 80 5.6 0.5 6.00 180 2-WAY NO 3
VAV-(N)107A INTERIOR PRICE SDV 14 14 0.85 2,075 625 55 80 12.5 1.0 10.00 180 2-WAY NO 2
VAV-(E)108 INTERIOR TITUS EXIST 12 0.64 580 765 55 80 15.3 1.2 6.00 180 2-WAY NO 1, 5
VAV-(N)108A INTERIOR PRICE SDV 8 8 0.64 300 135 55 80 2.7 0.5 6.00 180 2-WAY NO 2
VAV-(E)109 PERIMETER TITUS EXIST 10 0.48 660 200 55 90 5.6 0.5 4.00 180 2-WAY NO 1, 5
VAV-(N)109A PERIMETER TITUS EXIST 8 0.64 400 135 55 90 3.8 0.5 6.00 180 2-WAY NO 2
VAV-(E)110 TITUS EXIST 5
VAV-(E)111 INTERIOR TITUS EXIST 0.64 485 435 55 80 8.7 0.8 6.00 180 2-WAY NO 1, 5
VAV-(E)112 INTERIOR TITUS EXIST 6 0.64 150 150 55 80 3.0 0.5 6.00 180 2-WAY NO 1, 5
VAV-1-2-21 INTERIOR PRICE SDV 12 12 0.82 1,250 1,250 55 80 24.9 1.8 10.00 180 2-WAY NO 2
VAV-1-2-22 INTERIOR PRICE SDV 8 8 0.64 480 480 55 80 9.6 0.8 6.00 180 2-WAY NO 2, 4
VAV-1-2-23 INTERIOR PRICE SDV 12 12 0.82 1,400 1,400 55 80 27.9 2.0 10.00 180 2-WAY NO 2
VAV-1-2-24 INTERIOR PRICE SDV 9 9 0.48 700 700 55 80 14.0 1.0 4.00 180 2-WAY NO 2,4
VAV-1-2-25 INTERIOR PRICE SDV 8 8 0.64 355 355 55 80 7.1 0.6 6.00 180 2-WAY NO 2,4
REQUIREMENTS APPLYING TO ALL TERMINAL BOXES: 11,500 6,875 14.7
A. PROVIDE BOX SELECTION TO MEET LAT, DESIGN CFM AND HEATING MBH. FINAL GPM SHALL BE SET DURING BALANCING TO FLOW RATES IN LISTED PRODUCT DATA SUBMITTALS.
B. MAXIMUM STATIC PRESSURE IS BASED ON WIDE OPEN UNIT AT MAXIMUM FLOW FOR TERMINAL BOX WITH 2-ROW COIL.
C. HEATING WATER SYSTEM CONTAINS 40% PROPYLENE GLYCOL.
D. 2-ROW HEATING COIL CONDITIONS SHOW. 1- & 2-ROW HEATING COILS ACCEPTABLE COMPLIANT WITH MBH, WATER FLOW, AIR & WATER PRESSURE DROP REQUIREMENTS & LIMITATIONS.
E. USE OF 3- & 4-ROW COILS MUST BE SPECIFICALLY IDENTIFIED BY THE SUPPLIER & ACCEPTED BY THE ENGINEER FOR EACH LOCATION PROPOSED.
F. TERMINAL BOX MAXIMUM AIR FLOW CAPABILITIES: 6"=450 CFM, 8"=800 CFM, 9"=1050 CFM, 10"=1350 CFM, 12"=2000 CFM, 14"=3000 CFM, 16"=4000 CFM & 24"x16"=8000 CFM.
G. MINIMUM 2-ROW COILS REQUIRED ON ALL PERIMETER BOXES.
H. COORDINATE FINAL DESIGNATIONS WITH OWNER PRIOR TO LABELING OR BAS TAGGING. TAGS INDICATED ARE NOT FINAL.
REMARKS:
1. EXISTING TERMINAL BOX TO BE REUSED AND REBALANCED
2. NEW TERMINAL BOX
3. RELOCATED TERMINAL BOX TO BE REUSED AND REBALANCED
4. PROVIDE LOW FLOW ALARMS AT BAS FOR THESE TERMINAL BOXES TO INDICATE DIRTY HEPA FILTERS.
5. REPLACE EXISTING N2 COMM CONTROLS WITH BACNET CONTROLS FOR TERMINAL BOXES INDICATED. SEQUENCE AND POINTS TO MATCH SPECIFICATIONS FOR NEW
TERMINAL BOX OPERATIONS. TRANSFER EXISTING CONTROL SETPOINTS TO NEW CONTROLS. NEW BACNET COMMLINE TO BE RUN TO NAE 1 IN LOWER LEVEL. OLD
N2 COMM TO BE CUT BACK TO LAST VAV AND TERMINATED WITH EOL RESISTOR.
7/6/2017
DUCT PRESSURE CLASSIFICATION SCHEDULE
DUCT TYPE PRESSURE CLASS REMARKS
MEDIUM PRESSURE SUPPLY DUCT 4"
LOW PRESSURE SUPPLY AIR DUCT 2"
ALL RETURN, EXHAUST, OUTSIDE AIR ETC. 2"
ROOM PRESSURE DIFFERENTIAL SENSORS
SUPPLY AIR TERMINAL WITH REHEAT COIL
SUPPLY AIR TERMINAL WITH REHEAT COIL AND RADIANT PANEL
HUMIDIFIERS, DUCT MOUNTED, SYSTEM STEAM SUPPLY & RETURN
VARIABLE SPEED EXHAUST FANS
CONSTANT SPEED EXHAUST FANS
BUILDING AUTOMATION SYSTEM CONTROL MATRIX
IN ADDITION TO THE DDC POINTS LISTED BELOW, THE
CONTRACTOR SHALL CAREFULLY REVIEW ALL
DRAWINGS, ALL SPECIFICATIONS, & ALL SEQUENCES
OF OPERATION. THE DOCUMENTS ARE ALL INCLUSIVE
& COMPLIMENTARY TO EACH OTHER. THE PROJECT
SHALL INCLUDE ANY AND ALL NECESSARY DDC
POINTS TO SUPPORT THE REQUIREMENTS OF ALL THE
DOCUMENTS.
POINT TYPE STATUS
ALARM
NETWORK
COMMUNICATIONS
NO. OF UNITS
DIGITAL
INPUT
DIGITAL
OUTPUT
ANALOG
INPUT
ANALOG
OUTPUT
REMARKS
EQUIPMENT, SYSTEM & POINT
COORDINATE W/ROOM PRESSURE
SENSOR MFR
ROOM PRESSURE DIFFERENTIAL, INCHES OF WATER
COLUMN
X
ROOM NAME & NUMBER SHALL BE
INDICATED FOR EACH LOCATION,
CONFIRM W/OWNER
ROOM PRESSURE DIFFERENTIAL, LOW X
ROOM PRESSURE DIFFERENTIAL, HIGH X
AIR FLOW VOLUME X
DAMPER CONTROL X
DISCHARGE AIR TEMPERATURE X
REHEAT VALVE X
SET POINT ADJUSTMENT X
SPACE TEMP X
LOW AIRFLOW X
PROVIDE LOW FLOW ALARM WHERE
INDICATED IN TERMINAL BOX
SCHEDULE FOR TERMINAL BOXES
SERVING HEPA FILTER GRILLES FOR
DIRTY FILTER ALARM.
AIR FLOW VOLUME X
DAMPER CONTROL X
DISCHARGE AIR TEMPERATURE X
REHEAT VALVE X
SET POINT ADJUSTMENT X
SPACE TEMP X
RADIANT PANEL VALVE X
DUCT RELATIVE HUMIDITY X X
SAIL SWITCH X
SPACE RELATIVE HUMIDITY X X
STEAM CONTROL VALVE X
FAN FAILURE X
FAN IN HAND X
FAN ON/OFF STATUS X CURRENT TRANSDUCER
FAN RUNTIME EXCEEDED X
FAN START/STOP (VFD CONTROL) X
VFD FAILURE X
VFD SPEED X
FAN FAILURE X
FAN IN HAND X
FAN ON/OFF STATUS X CURRENT TRANSDUCER
FAN START/STOP X
ON/OFF STATUS X X CURRENT TRANSDUCER
START/STOP X
NOTES:
1. ALWAYS REFER TO DRAWINGS FOR QUANTITY.
2. PROVIDE OPEN PROTOCOL COMMUNICATION WITH FACTORY SUPPLIED CONTROLLER.
3. BAS CONTRACTOR SHALL COORDINATE STATUS LEVEL FOR EACH ALARM POINT WITH THE OWNER TO DETERMINE WHICH ONES REQUIRE IMMEDIATE
ATTENTION.
HYDRONIC RADIANT PANEL SCHEDULE (HYDRONIC)
PANEL SIZE
DESIG. MFR. MODEL WIDTH LENGTH BTU/HR/ GPM FINISH REMARKS
LF
RCP-1 PRICE RPL 12"RE: PLAN FOR
ACTIVE LENGTH
200 0.5 WHITE 1, 2
REMARKS:
1. AVERAGE WATER TEMPERATURE IS 170F.
2. PROVIDE RECESSED MOUNT FRAMES.
7/6/2017 13:12 P:\VVMC\2015-459 Phase II\Cad\Mech\Mschedules\[M-2015-459 Central Wing.xlsx]S810-1 SteamHumid
1
1
1
1
1
1
1
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
CENTRAL WING RENOVATION
7/10/2017 1:59:31 PM15924.00
M-002.1
MECHANICAL SCHEDULES