Loading...
HomeMy WebLinkAboutB17-0092_M-121-1_1498849080.pdf~ ~ ~~ ~ ~~ ~~ HWR 3/4" HWS 1" R 1" S (E) H (E) 5" HWS/R & 5" CWS/R UP LPS UP DN FC 1-1 AC 2 CUH 1 CWR CWR CWR CWR CWR CWR CWS CWS CWS CWS CWS CWS HWR HWR HWR HWR HWR HWR HWR HWR HWR HWS HWS HWS HWS HWS HWS HWS HWS HWS HR HS CAP FO FUTUR 1r" 1r" CUH CWS CWR D s" 1" s" 1" s"HWS UP TO FTR s"HWR UP TO FTR s"HWS UP TO FTR s"HWR UP TO FTR HWS HWR FCU 3" 2i" P-9 P-1 WATER HEATER HWR HWR HWS HWS HWR 3" HWS/HWR UP TO SECOND FLOOR (NO 3" BO PEE s" HWR HWS HWS HWR AC-3 H-1 4" 3/4" 1" 3/4" 4" 5" 5" 2" 1" 3/4" 3/4" 3/4" 3/4" 1" 1" 3/4" 3/4" 3/4" 1 1/4" 3/4" 1" 3/4" 3/4" 3/4" 3/4" 2"MPS UP H H 1 1/2" HWR 2 1/2" HWS 1 1/2" HWR 2 1/2" HWS 3" S 3" R 2 1/2" HWS 1 1/2" HWR 2" HWR 2" HWS 2" HWS T T T T T T T T T T T T T (E)101 VAV (E)115 VAV (N)105A VAV (E)104 VAV (E)103 VAV (N)102A VAV (E)114 VAV (E)102 VAV (N)109A VAV (E)109 VAV (E)110 VAV (E)106 VAV (E)111 VAV (E)112 VAV (E)108 VAV (E)113 VAV (E)105 VAV (R)107 VAV (N)107A VAV N1 H H CONNECT TO (E) STEAM 1" LPS Q2 Q3 T Q4 T Q3 Q2 T Q2 T T Q2 3/4" HWS 3/4" HWR (N)108A VAV T PROVIDE DRAIN COOLER. SIZE AS RECOMMENDED BY HUMIDIFIER MANUFACTURER. ROUTE ANY REQUIRED STEAM TRAPS TO THIS DRAIN COOLER. 3/4" LPC 10' - 0" 1 RCP 10' - 0" 1 RCP 6' - 0" 1 RCP 10' - 0" 1 RCP ALL HEATING WATER SUPPLY AND RETURN PIPING 3/4" UNLESS NOTED OTHERWISE T Q1 T T T P T COORD. LOCATION OF NEW TSTAT WITH EXISTING RETAIL PHARMACY 1-2-21 VAV 1-2-23 TB 1-2-24 VAV 1-2-25 VAV 1-2-22 VAV H12 H12 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant CENTRAL WING RENOVATION 3/10/2017 9:33:58 AM 180 S. Frontage Road West, Vail, CO 81657 15924.00 M-121.1 LEVEL 1 HVAC PIPING PLAN - CENTRAL 2017 03/10/17 PERMIT VAIL VALLEY MEDICAL CENTER A B C KEYNOTES H12 ADD ALTERNATE 2: REPLACE PNEUMATIC CONTROLS WITH DDC CONTROLS AT THE MRI ROOM AND (2) OFFICES IN THE PHARMACY AREA. PROVIDE SEQUENCES POINTS AND ALARMS TO MATCH NEW TERMINAL BOXES IN THE AREA. RECORD THE EXISTING BOX SETPOINTS PRIOR TO TAKING OUT OF OPERATION FOR REPLACEMENT AND TRANSFER SETPOINT TO NEW DDC CONTROLS. Q1 PROVIDE (3) ROOM PRESSURE MONITORS MONITORED AND TRENDED BY BAS. GANG INDICATORS AT INDICATED LOCATION. PRESSURE DIFFERENTIALS WILL BE MONITORED BETWEEN THE CLEAN ROOM AND ANTE, BETWEEN THE CHEMO ROOM AND ANTE, AND BETWEEN THE ANTE ROOM AND ADJACENT NON USP-800 PHARMACY. PROVIDE TEMPORARY LABELS INDICATING WHICH ROOM IS MONITORED BY WHICH PRESSURE MONITOR. FINAL LABELS WILL BE PROVIDED AND INSTALLED BY OWNER. Q2 EXISTING THERMOSTAT TO REMAIN IN EXISTING LOCATION. Q3 RELOCATE EXISTING THERMOSTAT TO LOCATION INDICATED. Q4 PATCH ANY EXISTING INSULATION ON DUCTWORK, HYDRONIC PIPING, AND DOMESTIC WATER PIPING WITHIN THIS SCOPE AREA. SCALE: 1/8" = 1'-0" LEVEL 1 HVAC PIPING PLAN - CENTRAL SCALE: 1/8" = 1'-0" LEVEL 1 HVAC PIPING PLAN - PHARMACY 06/30/17