Loading...
HomeMy WebLinkAboutB17-0092_M-121-1_1508947709.pdf~ ~ ~~~~~~~ HWR 3/4" HWS 1" R 1" S (E) H (E) 5" HWS/R & 5" CWS/R UP LPS UP DN FC 1-1 AC 2 CUH 1 CWRCWRCWRCWR CWR CWR CWSCWSCWSCWS CWS CWS HWRHWRHWRHWR HWR HWRHWRHWR HWRHWSHWSHWSHWS HWS HWS HWSHWS HWSHRHSCAP FO FUTUR 1r" 1r" CUH CWSCWR D s" 1" s" 1" s"HWS UP TO FTR s"HWR UP TO FTR s"HWS UP TO FTR s"HWR UP TO FTR HWSHWR FCU 3" 2i" P-9 P-1WATER HEATER HWR HWR HWS HWSHWR3" HWS/HWR UP TO SECOND FLOOR (NO 3" BOPEE s" HWRHWSHWSHWR AC-3 H-1 4" 3/4" 1" 3/4" 4" 5" 5" 2" 1" 3/4" 3/4" 3/4" 3/4" 1" 1" 3/4" 3/4" 3/4" 1 1/4" 3/4" 1" 3/4" 3/4" 3/4" 3/4" 2"MPS UP HH 1 1/2" HWR 2 1/2" HWS 1 1/2" HWR 2 1/2" HWS 3" S 3" R 2 1/2" HWS 1 1/2" HWR 2" HWR 2" HWS2" HWS T T T T T T T T T T T T (E)101 VAV (E)115 VAV (N)105A VAV (E)104 VAV (E)103 VAV (N)102A VAV (E)114 VAV (E)102 VAV (N)109A VAV (E)109 VAV (E)110 VAV (E)106 VAV (E)111 VAV (E)112 VAV (E)108 VAV (E)113 VAV (E)105 VAV (R)107 VAV (N)107A VAV R1 H H Q2 Q3 T Q4 T Q2 T Q2 T T 3/4" HWS 3/4" HWR (N)108A VAV T 1 RCP 1 RCP 1 RCP 1 RCP ALL HEATING WATER SUPPLY AND RETURN PIPING 3/4" UNLESS NOTED OTHERWISE 1 1/2" LPS 1 Q7 Q7 R1 H 3/4" LPC COORD. STRUCTURAL CORES WITH INSULATED PIPE SIZES. T Q3 UTILIZE VAV (E)110 TSTAT READING AS SETPOINT FOR BOTH (E)110 AND (E) 114. 1 Q3 2 Q3 LOCATE STEAM CONDENSATE TRAP IN WALL FRAMING WITH ACCESS DOOR 3 T Q1 T T T P T COORD. LOCATION OF NEW TSTAT WITH EXISTING RETAIL PHARMACY 1-2-21 VAV 1-2-23 VAV 1-2-24 VAV 1-2-25 VAV 1-2-22 VAV H12 H12 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant CENTRAL WING RENOVATION 7/10/2017 2:00:09 PM15924.00 M-121.1 LEVEL 1 HVAC PIPING PLAN - CENTRAL 07/11/17PERMIT RESUBMISSION EAST WING ADDITION 180 S Frontage Rd W, Vail, CO 81657A B C KEYNOTES H12 ADD ALTERNATE 2: REPLACE PNEUMATIC CONTROLS WITH DDC CONTROLS AT THE MRI ROOM AND (2) OFFICES IN THE PHARMACY AREA. PROVIDE SEQUENCES POINTS AND ALARMS TO MATCH NEW TERMINAL BOXES IN THE AREA. RECORD THE EXISTING BOX SETPOINTS PRIOR TO TAKING OUT OF OPERATION FOR REPLACEMENT AND TRANSFER SETPOINT TO NEW DDC CONTROLS. Q1 PROVIDE (3) ROOM PRESSURE MONITORS MONITORED AND TRENDED BY BAS. GANG INDICATORS AT INDICATED LOCATION. PRESSURE DIFFERENTIALS WILL BE MONITORED BETWEEN THE CLEAN ROOM AND ANTE, BETWEEN THE CHEMO ROOM AND ANTE, AND BETWEEN THE ANTE ROOM AND ADJACENT NON USP-800 PHARMACY. PROVIDE TEMPORARY LABELS INDICATING WHICH ROOM IS MONITORED BY WHICH PRESSURE MONITOR. FINAL LABELS WILL BE PROVIDED AND INSTALLED BY OWNER. Q2 EXISTING THERMOSTAT TO REMAIN IN EXISTING LOCATION. Q3 RELOCATE EXISTING THERMOSTAT TO LOCATION INDICATED. Q4 PATCH ANY EXISTING INSULATION ON DUCTWORK, HYDRONIC PIPING, AND DOMESTIC WATER PIPING WITHIN THIS SCOPE AREA. Q7 RELOCATE EXISTING PACKAGED HUMIDIFIER STEAM GENERATOR AND STEAM GRID FROM 2014 CATH LAB PROJECT FOR REUSE FOR THIS PROJECT. INSTALL PER MANUFACTURER INSTALLATION INSTRUCTIONS. COORDINATE ANY REQUIRED BACKING WITH HUMIDIFIER WEIGHT. PROVIDE DRAIN COOLER TO (E) MSB, GANGING MULTIPLE DRAINS FROM STEAM GENERATOR INTO SINGLE DRAIN COOLER VIA SPILL FUNNEL. ROUTE DUCT DRAIN TO 104E SOILED HOLD, NO DRAIN COOLER REQUIRED. SCALE: 1/8" = 1'-0" LEVEL 1 HVAC PIPING PLAN - CENTRAL SCALE: 1/8" = 1'-0" LEVEL 1 HVAC PIPING PLAN - PHARMACY ADDENDUM 1 05/23/2017 1 ADDENDUM 3 06/27/2017 2 ADDENDUM 4 07/06/2017 3 10/25/17