HomeMy WebLinkAboutB17-0092_M-121-1_1508947709.pdf~ ~ ~~~~~~~
HWR
3/4" HWS
1" R
1" S
(E)
H
(E) 5" HWS/R &
5" CWS/R UP
LPS UP
DN
FC
1-1
AC
2
CUH
1
CWRCWRCWRCWR CWR
CWR CWSCWSCWSCWS CWS
CWS HWRHWRHWRHWR HWR
HWRHWRHWR HWRHWSHWSHWSHWS HWS
HWS HWSHWS HWSHRHSCAP FO
FUTUR
1r"
1r"
CUH
CWSCWR D
s"
1"
s"
1"
s"HWS UP
TO FTR
s"HWR UP
TO FTR
s"HWS UP
TO FTR
s"HWR UP
TO FTR
HWSHWR
FCU
3"
2i"
P-9 P-1WATER HEATER
HWR
HWR
HWS
HWSHWR3" HWS/HWR UP TO
SECOND FLOOR
(NO
3"
BOPEE
s" HWRHWSHWSHWR
AC-3
H-1
4"
3/4"
1"
3/4"
4" 5"
5" 2" 1"
3/4"
3/4"
3/4"
3/4"
1" 1"
3/4"
3/4"
3/4"
1 1/4"
3/4"
1"
3/4"
3/4"
3/4"
3/4"
2"MPS UP HH
1 1/2" HWR
2 1/2" HWS
1 1/2" HWR
2 1/2" HWS
3" S
3" R
2 1/2" HWS
1 1/2" HWR
2" HWR
2" HWS2" HWS
T
T
T
T
T
T
T
T
T
T
T
T
(E)101
VAV
(E)115
VAV
(N)105A
VAV
(E)104
VAV (E)103
VAV
(N)102A
VAV
(E)114
VAV
(E)102
VAV
(N)109A
VAV
(E)109
VAV
(E)110
VAV
(E)106
VAV
(E)111
VAV
(E)112
VAV
(E)108
VAV
(E)113
VAV
(E)105
VAV
(R)107
VAV
(N)107A
VAV
R1
H
H
Q2
Q3
T
Q4
T
Q2
T
Q2
T
T
3/4" HWS
3/4" HWR
(N)108A
VAV
T
1
RCP
1
RCP
1
RCP
1
RCP
ALL HEATING WATER SUPPLY
AND RETURN PIPING 3/4"
UNLESS NOTED OTHERWISE
1 1/2" LPS
1
Q7
Q7
R1
H
3/4" LPC
COORD. STRUCTURAL
CORES WITH
INSULATED PIPE SIZES.
T Q3
UTILIZE VAV (E)110
TSTAT READING AS
SETPOINT FOR
BOTH (E)110 AND
(E) 114.
1
Q3
2
Q3
LOCATE STEAM CONDENSATE
TRAP IN WALL FRAMING WITH
ACCESS DOOR
3
T
Q1
T
T
T
P
T
COORD. LOCATION
OF NEW TSTAT
WITH EXISTING
RETAIL PHARMACY
1-2-21
VAV
1-2-23
VAV
1-2-24
VAV
1-2-25
VAV
1-2-22
VAV
H12
H12
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP,
P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
CENTRAL WING RENOVATION
7/10/2017 2:00:09 PM15924.00
M-121.1
LEVEL 1 HVAC PIPING
PLAN - CENTRAL
07/11/17PERMIT
RESUBMISSION
EAST WING
ADDITION
180 S Frontage Rd W, Vail, CO 81657A
B
C
KEYNOTES
H12 ADD ALTERNATE 2: REPLACE PNEUMATIC CONTROLS WITH DDC
CONTROLS AT THE MRI ROOM AND (2) OFFICES IN THE PHARMACY
AREA. PROVIDE SEQUENCES POINTS AND ALARMS TO MATCH NEW
TERMINAL BOXES IN THE AREA. RECORD THE EXISTING BOX
SETPOINTS PRIOR TO TAKING OUT OF OPERATION FOR
REPLACEMENT AND TRANSFER SETPOINT TO NEW DDC CONTROLS.
Q1 PROVIDE (3) ROOM PRESSURE MONITORS MONITORED AND
TRENDED BY BAS. GANG INDICATORS AT INDICATED LOCATION.
PRESSURE DIFFERENTIALS WILL BE MONITORED BETWEEN THE
CLEAN ROOM AND ANTE, BETWEEN THE CHEMO ROOM AND ANTE,
AND BETWEEN THE ANTE ROOM AND ADJACENT NON USP-800
PHARMACY. PROVIDE TEMPORARY LABELS INDICATING WHICH
ROOM IS MONITORED BY WHICH PRESSURE MONITOR. FINAL
LABELS WILL BE PROVIDED AND INSTALLED BY OWNER.
Q2 EXISTING THERMOSTAT TO REMAIN IN EXISTING LOCATION.
Q3 RELOCATE EXISTING THERMOSTAT TO LOCATION INDICATED.
Q4 PATCH ANY EXISTING INSULATION ON DUCTWORK, HYDRONIC
PIPING, AND DOMESTIC WATER PIPING WITHIN THIS SCOPE AREA.
Q7 RELOCATE EXISTING PACKAGED HUMIDIFIER STEAM GENERATOR
AND STEAM GRID FROM 2014 CATH LAB PROJECT FOR REUSE FOR
THIS PROJECT. INSTALL PER MANUFACTURER INSTALLATION
INSTRUCTIONS. COORDINATE ANY REQUIRED BACKING WITH
HUMIDIFIER WEIGHT. PROVIDE DRAIN COOLER TO (E) MSB, GANGING
MULTIPLE DRAINS FROM STEAM GENERATOR INTO SINGLE DRAIN
COOLER VIA SPILL FUNNEL. ROUTE DUCT DRAIN TO 104E SOILED
HOLD, NO DRAIN COOLER REQUIRED.
SCALE: 1/8" = 1'-0"
LEVEL 1 HVAC PIPING PLAN - CENTRAL
SCALE: 1/8" = 1'-0"
LEVEL 1 HVAC PIPING PLAN - PHARMACY
ADDENDUM 1 05/23/2017 1
ADDENDUM 3 06/27/2017 2
ADDENDUM 4 07/06/2017 3
10/25/17