Loading...
HomeMy WebLinkAboutB17-0092_MD-111-1_1498849080.pdfFC 1-1 12/12 UP TO EF-8 14/12 14/12 14/10 12/10 12/8 10/10 10/8 10/8 8/8 12/10 12/10 8/8 8/8 10/8 8/10 8/8 8/8 4 12 46 16/14 10/8 STEADMAN IT ROOM AHU-14 100 H T AC 1 16"x12" 100 (E)105 VAV (E)109 VAV (E)102 VAV (E)114 VAV (E)113 VAV (E)112 VAV (E)108 VAV (E)103 VAV (E)104 VAV (E)101 VAV (E)115 VAV (E)107 VAV 300 (E)111 VAV 8" A 140 (TYP. OF 2) (E)106 VAV (E)110 VAV DEMO EXISTING SPLIT SYSTEM (FCU AND CONDENSER). EVACUATE, CAP AND ABANDON REFRIGERANT LINESETS. DEMO (E) DUCTWORK AND RELATED DAMPERS ETC UNDER (E) BEAM. H4 80 340 120 170 170 80 12"x10" 8"x8" 80 H18 100 100 145 145 75 75 180 180 300 300 145 170 150 150 100 100 75 75 125 110 300 230 230 575 150 200 100 50 50 75 50 85 80 90 90 90 90 120 140 100 100 100 100 140 140 75 75 H18 16"x12" 18"x14" 18"x22" 22"x14" 18"x16" 20"x14" 14"x10" 18"x16" 22"x14" 10" A 300 (TYP. OF 2) 10" A 300 (TYP. OF 2) 10" A 300 (TYP. OF 2) 10" A 300 (TYP. OF 2) 300 H18 H18 220 210 130 200 190 80 700 190 200 160 180 180 130 470 210 200 130 200 200 200 200 240 240 100 110 110 150 80 80 H18 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant CENTRAL WING RENOVATION 3/10/2017 9:34:10 AM 180 S. Frontage Road West, Vail, CO 81657 15924.00 MD-111.1 LEVEL 1 AND 2 DEMOLITION HVAC PLANS - CENTRAL 2017 03/10/17 PERMIT VAIL VALLEY MEDICAL CENTER A B C KEYNOTES H4 RELOCATE EXISTING VAV BOX AND HEATING WATER COIL AND RECONNECT H18 RELOCATE EXISTING GRD AND EXTEND DUCTWORK TO NEW LOCATION TO COORDINATE WITH NEW ARCHITECTURAL CEILING GRID. SCALE: 1/8" = 1'-0" LEVEL 1 DEMOLITION HVAC PLAN - CENTRAL SCALE: 1/8" = 1'-0" LEVEL 1 DEMOLITION HVAC PLAN - PHARMACY SCALE: 1/8" = 1'-0" LEVEL 2 DEMOLITION HVAC PLAN - EAST ENABLING 06/30/17