Loading...
HomeMy WebLinkAboutB17-0092_MD-121-1_1498849080.pdf~~~~ ~ ~~ ~~ HWR 3/4" HWS 1" R 1" S (E) H (E) 5" HWS/R & 5" CWS/R UP LPS UP DN FC 1-1 CWR CWR CWR CWR CWR CWR CWS CWS CWS CWS CWS CWS HWR HWR HWR HWR HWR HWR HWR HWR HWR HWS HWS HWS HWS HWS HWS HWS HWS HWS HR HS CAP FO FUTUR 1r" 1r" CUH CWS CWR D s" 1" s" 1" s"HWS UP TO FTR s"HWR UP TO FTR s"HWS UP TO FTR s"HWR UP TO FTR HWS HWR FCU 3" 2i" P-9 P-1 WATER HEATER HWR HWR HWS HWS HWR (NO 3" BO PEE 4" 3/4" 1" 3/4" 4" 5" 5" 2" 1" 3/4" 3/4" 3/4" 3/4" 1" 1" 3/4" 3/4" 3/4" 1 1/4" 3/4" 1" 3/4" 3/4" 2"MPS UP H 1 1/2" HWR 2 1/2" HWS 1 1/2" HWR 2 1/2" HWS 3" S 3" R 2 1/2" HWS 1 1/2" HWR 2" HWR 2" HWS 2" HWS (D) DHC (TYP.) (D) FCU (D) FCU T T T T T T T T T T T T DEMO EXISTING SPLIT SYSTEM (FCU AND CONDENSER). EVACUATE, CAP AND ABANDON REFRIGERANT LINESETS. H4 H11 H11 H11 H11 H11 H11 H11 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant CENTRAL WING RENOVATION 3/10/2017 9:34:17 AM 180 S. Frontage Road West, Vail, CO 81657 15924.00 MD-121.1 LEVEL 1 DEMOLITION HVAC PIPING PLAN - CENTRAL 2017 03/10/17 PERMIT VAIL VALLEY MEDICAL CENTER A B C KEYNOTES H4 RELOCATE EXISTING VAV BOX AND HEATING WATER COIL AND RECONNECT H11 DEMO EXISTING DUCT HEATING COILS, FAN COILS AND RADIANT HEAT. DEMO RELATED HEATING WATER PIPING, CONDENSATE PIPING AND CONTROLS BACK TO MAIN AND CAP. LEAVE NO DEAD-LEGS. SCALE: 1/8" = 1'-0" LEVEL 1 DEMOLITION HVAC PIPING PLAN - CENTRAL SCALE: 1/8" = 1'-0" LEVEL 1 DEMOLITION HVAC PIPING PLAN - PHARMACY 06/30/17