Loading...
HomeMy WebLinkAboutB17-0092_P-001-1_1498849080.pdfPLUMBING LEGEND SYMBOL DESCRIPTION ABBR. DESCRIPTION ACID RESISTANT WASTE PIPING (ABOVE FLOOR IN BUILDING) DOMESTIC COLD WATER PIPING DOMESTIC HOT WATER PIPING DOMESTIC HOT WATER CIRC. PIPING SOFTENED DOMESTIC COLD WATER PIPING SOFTENED DOMESSTIC HOT WATER PIPING DOMESTIC HOT WATER PIPING @ TEMPERATURE SHOWN SURFACE CLEANOUT FLOOR CLEANOUT LINE CLEANOUT FIXTURE OR DRAIN P-TRAP AREA DRAIN FLOOR SINK (SQUARE GRATE) ROOF DRAIN OR OVERFLOW DRAIN GAS PRESSURE REDUCING VALVE ATMOSPHERIC VACUUM BREAKER ACID RESISTANT VENT PIPING WASTE PIPING (ABOVE FLOOR IN BUILDING) WASTE PIPING (BELOW FLOOR IN BUILDING) WALL CLEANOUT CLEANOUT TEE ABBR. SYMBOL VENT PIPING FLOOR DRAIN (ROUND GRATE) HW HWC C-SW 140° HW V H-SW AV W W AW AW CW FS RD / OD VB AV W W AW AW GD IW S ST SSD SD SD OD OD A G G ACID RESISTANT WASTE PIPING (BELOW FLOOR IN BUILDING) IW S ST SSD SD GD SD OD OD A COMPRESSED AIR GREASE DRAIN (WASTE LINE TO GREASE INTERCEPTOR) INDIRECT WASTE PIPING SANITARY SEWER PIPING (OUTSIDE BUILDING) STORM SEWER PIPING (BELOW GRADE OUTSIDE BUILDING) SUB-SURFACE DRAIN PIPING OVERFLOW DRAIN PIPING (ABOVE FLOOR IN BUILDING) STORM DRAIN PIPING (ABOVE FLOOR IN BUILDING) STORM DRAIN PIPING (BELOW FLOOR IN BUILDING) OVERFLOW DRAIN PIPING (BELOW FLOOR IN BUILDING) FCO WCO COT AD LCO FD SCO BFP SA GC FC WH HB YH MH CI MANHOLE DOUBLE CHECK BACKFLOW PREVENTER SHOCK ARRESTOR W / ISOLATION VALVE GAS SHUT-OFF VALVE STOP AND DRAIN VALVE HOSE BIBB HWC BALANCING VALVE CAST IRON WALL HYDRANT YARD HYDRANT INVERT ELEVATION CATCH BASIN POLYVINYL CHLORIDE VITRIFIED CLAY PIPE VENT THRU ROOF VCP CB VTR IE PVC SW SW 140° FUEL OIL PIPING LEGEND SYMBOL DESCRIPTION ABBR. DESCRIPTION FUEL OIL SUPPLY PIPING FUEL OIL RETURN PIPING FUEL OIL FILL PIPING FUEL OIL VENT PIPING FUEL OIL OVERFLOW PIPING DAY TANK PUMP OUT PIPING PRESSURE RELIEF VALVE VACUUM GAUGE W/ COCK VALVE FUEL OIL HAND PUMP GENERATOR FUEL OIL RETURN PIPING PRESSURE GAUGE W/ COCK VALVE FUSIBLE LINK VALVE ABBR. SYMBOL GENERATOR FUEL OIL SUPPLY PIPING FOR FOF FOV DPO GFOS FOO GFOR FOS FOR FOF FOV DPO GFOS FOO GFOR FOS V F P FIRE PROTECTION LEGEND SYMBOL DESCRIPTION ABBR. DESCRIPTION FIRE SERVICE PIPING FIRE SPRINKLER PIPING WET STANDPIPE O.S.&Y. VALVE W/ TAMPER SWITCH FLOW SWITCH POST INDICATOR VALVE NEW SPRINKLER HEAD EXISTING SPRINKLER HEAD DRY SPRINKLER HEAD (SHAFT) FIRE HOSE CABINET FIRE VALVE CABINET FIRE DEPARTMENT CONNECTION RELOCATED SPRINKLER HEAD SIDEWALL SPRINKLER HEAD ABBR. F SYMBOL FIRE HYDRANT AUTOMATIC FIRE SPRINKLER FS WSP PIV FH FS FDC F FS N20 FHC FVC A/S D24 LABORATORY / MEDICAL SERVICES LEGEND SYMBOL DESCRIPTION ABBR. DESCRIPTION LABORATORY COMPRESSED AIR PIPING OXYGEN PIPING VACUUM PIPING NITROUS OXIDE PIPING NITROGEN PIPING MEDICAL AIR PIPING CARBON DIOXIDE OXYGEN SERVICE OUTLET VACUUM SERVICE INLET NITROGEN SERVICE OUTLET NATURAL GAS SERVICE OUTLET LABORATORY/MEDICAL AIR SERVICE OUTLET ZONE VALVE BOX MEDICAL GAS OUTLET AREA ALARM PANEL MASTER ALARM PANEL DEIONIZED WATER PIPING HYDROGEN PIPING LIQUID NITROGEN PIPING NATURAL GAS PIPING WASTE ANESTHESIA GAS DISPOSAL INLET NITROUS OXIDE SERVICE OUTLET ABBR. 02 SYMBOL WASTE ANESTHESIA GAS DISPOSAL CARBON DIOXIDE SERVICE OUTLET VAC N2O N CO2 WAGD MA DI H NL LA G O2 ZVB MGO AAP MAP VAC N WAGD DI H NL LA G N20 MA CO2 GENERAL LEGEND SYMBOL DESCRIPTION ABBR. DESCRIPTION NEW SECTION DESIGNATION SECTION DRAWN ON THIS SHEET SECTION CUT ON THIS SHEET RISER DIAGRAM NUMBER SHEET RISER IS DRAWN ON EQUIPMENT UNIT IDENTIFICATION CAP END OF PIPE PITCH DOWN IN DIRECTION OF ARROW UNION OR FLANGE CONCENTRIC PIPE REDUCER ECCENTRIC PIPE REDUCER PRESSURE AND/OR TEMPERATURE RELIEF VALVE PLUG VALVE GATE VALVE VERTICAL PIPE VALVE DIFFUSER IDENTIFICATION DIFFUSER NECK DIAMETER DIFFUSER CFM EXISTING PIPE ANCHOR PIPE ALIGNMENT GUIDE ABBR. SYMBOL EQUIPMENT UNIT NUMBER PRESSURE REDUCING VALVE (E) (N) (R) PTRV (F) DIA WAD NIC AFF GC MC EC RELOCATED FUTURE POINT OF CONNECTION, NEW TO EXISTING DIRECTION OF FLOW IN PIPE DUCTWORK, PIPING AND EQUIPMENT TO BE REMOVED DIAMETER ABOVE FINISHED FLOOR WALL ACCESS DOOR ELECTRICAL CONTRACTOR NOT IN CONTRACT GENERAL CONTRACTOR PRV GLV BFV BV CV P/T STRAINER W/ BLOWDOWN GLOBE VALVE BUTTERFLY VALVE BALL VALVE CHECK VALVE SOLENOID VALVE PRESSURE / TEMPERATURE TAP BUTTERFLY SOLENOID VALVE FLEXIBLE PIPE CONNECTOR HOSE END DRAIN VALVE STRAINER CEILING ACCESS PANEL PRESSURE GAUGE PUMP THERMOMETER SIGHT GLASS C.A.P. TB MECHANICAL CONTRACTOR # UNIT M-X X X.X X.X X GV THRUST BLOCK XX P/T DETAIL SHEETS PLAN SHEETS XX NATURAL GAS PIPING (Not all symbols listed below are used on these drawings) (Not all symbols listed below are used on these drawings) (Not all symbols listed below are used on these drawings) (Not all symbols listed below are used on these drawings) (Not all symbols listed below are used on these drawings) NECK CFM X POINT OF DISCONNECTION (DEMO) 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant CENTRAL WING RENOVATION 3/10/2017 9:34:19 AM 180 S. Frontage Road West, Vail, CO 81657 15924.00 P-001.1 PLUMBING LEGENDS & NOTES 2017 03/10/17 PERMIT VAIL VALLEY MEDICAL CENTER PLUMBING NOTES: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. CONTRACTOR SHALL NOT SHUT-OFF/PUT OUT OF SERVICE ANY SYSTEMS/SERVICES WITHOUT FIRST COORDINATING WITH OWNER. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF ANY WORK AND SHALL NOTIFY THE ARCHITECT/ENGINEER OF ANY DISCREPANCIES FOR RESOLUTIONS. THIS CONTRACTOR SHALL COORDINATE LOCATIONS OF PIPING WITH OTHER TRADES AND ADVISE ARCHITECT/ENGINEER OF ANY POSSIBLE CONFLICTS. VERIFY EXACT LOCATIONS, ELEVATIONS AND DIMENSIONS OF STRUCTURAL MEMBERS AND OPENINGS. SEE SPECIFICATIONS FOR WATER HAMMER ARRESTOR SIZING. ALL FLUSH VALVES AND SOLENOID OPERATED EQUIPMENT SHALL HAVE A WATER HAMMER ARRESTOR. SEE PLUMBING FIXTURE SCHEDULE FOR PIPE SIZING TO INDIVIDUAL PLUMBING FIXTURES. ALL EXISTING FIXTURES AND EQUIPMENT TO BE REMOVED SHALL HAVE ALL ASSOCIATED PIPING CONTROLS, HANGERS, SUPPORTS AND ANY MISCELLANEOUS ASSOCIATED SERVICE OR PART REMOVED COMPLETELY. ALL MEDICAL GAS PIPING SHALL HAVE TOP TAKE-OFFS WHENEVER POSSIBLE. REFER TO ARCHITECTURAL DRAWINGS FOR ROOF PENETRATION DETAILS. REFER TO ARCHITECTURAL DRAWINGS FOR FIXTURE ELEVATIONS AND LOCATIONS. SEE ARCHITECTURAL CONSTRUCTION DOCUMENTS FOR DIMENSIONED LOCATION OF PLUMBING FIXTURES AND WALLS. PROVIDE CLEANOUTS IN ACCESSIBLE LOCATIONS PER THE PROJECT SPECIFICATIONS AND LOCAL PLUMBING CODES. FOUNDATION PLUMBING NOTES: 1. 2. 3. 4. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF ANY WORK. COORDINATE WORK WITH ALL TRADES. SEE ARCHITECTURAL CONSTRUCTION DOCUMENTS FOR EXACT LOCATION OF PLUMBING FIXTURES AND WALLS. PROVIDE A WALL CLEANOUT ON ALL VERTICAL VENT PIPING SERVING BELOW GRADE HORIZONTAL WASTE PIPING. FIRE PROTECTION PLAN NOTES: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES NECESSARY FOR THE INSTALLATION OF A COMPLETE AND PROPERLY FUNCTIONING FIRE PROTECTION SYSTEM. THE FIRE PROTECTION WORK INVOLVES ENGINEERING AND DESIGN BY THE CONTRACTOR TO DETERMINE THE EXTENT OF NEW WORK AND THE MODIFICATION AND EXTENSION OF EXISTING SYSTEMS TO PROVIDE FULL COVERAGE TO THE PROJECT AREA SHOWN ON THESE AND THE ARCHITECTURAL PLANS. THE INFORMATION PRESENTED ON THESE DRAWINGS IS DIAGRAMMATIC. IT DOES NOT NECESSARILY REPRESENT ALL ELBOWS, OFFSETS, HANGERS, ETC., REQUIRED FOR A COMPLETE WORKING SYSTEM. ALL FIRE PROTECTION SYSTEMS INSTALLED SHALL BE IN ACCORDANCE WITH NFPA-13, 14, 20, ETC. AND LOCAL BUILDING CODES AND ORDINANCES. FIRE PROTECTION CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL NEW FIRE PROTECTION EQUIPMENT AND PIPING WITH ALL OTHER TRADES PRIOR TO SUBMITTAL OF SHOP DRAWINGS AND SYSTEM INSTALLATION, SO AS NOT TO INTERFERE WITH THE ROUTING OF NEW DUCTWORK, PLUMBING PIPING, ETC. PROVIDE ALL FITTINGS, RISER NIPPLES, ARM-OVERS, HANGERS, ETC. TO MAINTAIN CONFORMANCE WITH APPLICABLE STANDARDS AND TO POSITION THE SPRINKLERS IN THE PROPER LOCATIONS. SEAL ALL PIPE PENETRATIONS THROUGH FIRE RATED WALLS AND CEILINGS WITH FIRE STOPPING MATERIALS AS REQUIRED. FOR REMODEL AREAS NEW SPRINKLERS SHALL MATCH EXISTING SPRINKLERS. PROVIDE WORKING DRAWINGS AND HYDRAULICALLY CALCULATE THIS FIRE SPRINKLER SYSTEM PER NFPA-13 WHERE REQUIRED BY THE LOCAL AUTHORITY HAVING JURISDICTION. PROVIDE FIELD COORDINATION OF PIPING AND SPRINKLER INSTALLATIONS WITH DUCTWORK, LIGHTS, SMOKE DETECTORS, DIFFUSERS, ETC. 06/30/17