Loading...
HomeMy WebLinkAboutB17-0092_P-131-1_1498849080.pdf~ ~ ~ ~ ~ ~ ~~ ~ ~ ~ ~ ~ ~ ~ 1 1/2" VAC N N MA MA O2 O2 O2 O2 VAC VAC VAC VAC VAC 1i" i" i" 1i" AAP s" i" i" 1" i" s" i" 1i" i" i" i" i" i" i" VAC VAC O O2 O2 s" ZVB 1" 3/4" 1 1/4" 3/4" 1" 1 1/2" 02 SUPPLY PIPING FOR ENTIRE SECOND AND THIRD FLOORS OF THE CENTRAL WING 2 PIPING AROUND O2 f" 1i" 1" 1" i" ZVB ZVB O2 O2 O2 O2 O2 O2 O2 O2 O2 O2 O2 VAC VAC VAC VAC G10 2" O G11 G11 PROVIDE NEW ZONE VALVE BOX DOWN TO OUTLETS: (1) O2, (1) VAC, (1) VAC W/SLIDE 1" VAC 1" VAC (1) NEW VAC OUTLET. LOCATE ADJACENT TO EXISTING O2 OUTLET. G12 G12 G12 CONNECT TO (E) VAC AND O2 MAINS UPSTREAM OF (E) ZVB G13 CONNECT TO (E) VALVED CONNECTIONS. 1/2" O 3/4" VAC 1/2" O 3/4" VAC ALTERNATE VAC PIPING BASE SCOPE BASE SCOPE (E) 3/4" O AND 3/4" VAC G12 NO NEW MEDICAL GAS SERVICES IN THIS SCOPE AREA G15 G16 3/4" O 1" VAC 3/4" O 1" VAC 1/2" O 3/4" VAC G15 G15 G15 G15 1" VAC 3/4" O 3/4" VAC 1/2" O PROVIDE NEW ZONE VALVE BOX 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date Sheet Information Project Information Issuance Consultant CENTRAL WING RENOVATION 3/10/2017 9:53:10 AM 180 S. Frontage Road West, Vail, CO 81657 15924.00 P-131.1 LEVEL 1 AND 2 MEDICAL GAS PLANS - CENTRAL 2017 03/10/17 PERMIT VAIL VALLEY MEDICAL CENTER A B C KEYNOTES G10 REPLACE (E) ZONE VALVE BOX. EXISTING VALVE BOX INCLUDES OXYGEN ONLY. ADD VAC AND ROUTE TO NEW OUTLET IN ULTRASOUND. THIS IS ADD ALTERNATE SCOPE. BASE SCOPE IS NO HARD PIPED MODIFICATIONS TO THESE ROOMS. G11 REPLACE EXISTING 3/4" O2 PIPING WITH NEW 2" O2 LINE AND CONTINUE TO A FUTURE POINT OF CONNECTION AT FUTURE EAST WING. G12 3/4" VAC DOWN TO (1) NEW VAC OUTLET. LOCATE ADJACENT TO EXISTING O2 OUTLET. THIS IS ADD ALTERNATE SCOPE. BASE SCOPE IS NO HARD PIPED MODIFICATIONS TO THESE ROOMS. G13 RE-FEED OXYGEN FROM MAINS THAT WILL REMAIN - (E) O2 VALVES ARE FED FROM EAST WING PIPING. UTILIZE 1" O2 PIPING. G15 PROVIDE (1) VAC AND (1) O2 OUTLET. COORDINATE WITH ARCHITECTURAL PLANS AND ELEVATIONS FOR EXACT LOCATION. ALL MED GAS SCOPE INDICATED ON LEVEL 2 IS AN ADDITIVE ALTERNATE. BASE SCOPE IS NO HARD PIPED MED GASSES. G16 CONNECT TO EXISTING O2 AND VAC. COORDINATE ALL SHUTDOWNS CAREFULLY WITH OWNER VIA MOP. ALL MED GAS SCOPE INDICATED ON LEVEL 2 IS AN ADDITIVE ALTERNATE. BASE SCOPE IS NO HARD PIPED MED GASSES. SCALE: 1/8" = 1'-0" LEVEL 1 MEDICAL GAS PLAN - CENTRAL SCALE: 1/8" = 1'-0" LEVEL 1 MEDICAL GAS PLAN - PHARMACY SCALE: 1/8" = 1'-0" LEVEL 2 MEDICAL GAS PLAN - CENTRAL 06/30/17