HomeMy WebLinkAboutB17-0092_P-131-1_1498849080.pdf~ ~
~ ~
~
~
~~
~ ~
~
~
~
~ ~
1 1/2"
VAC
N
N
MA
MA
O2
O2
O2
O2
VAC
VAC VAC
VAC
VAC
1i"
i"
i"
1i"
AAP
s" i" i"
1"
i"
s"
i"
1i"
i"
i"
i"
i"
i"
i"
VAC
VAC
O
O2
O2
s"
ZVB
1" 3/4" 1 1/4"
3/4"
1"
1 1/2"
02 SUPPLY PIPING FOR
ENTIRE SECOND AND
THIRD FLOORS OF THE
CENTRAL WING
2 PIPING
AROUND O2
f"
1i"
1"
1"
i"
ZVB
ZVB
O2
O2 O2
O2 O2
O2
O2
O2
O2
O2 O2
VAC
VAC
VAC
VAC
G10
2" O
G11
G11
PROVIDE NEW
ZONE VALVE BOX
DOWN TO OUTLETS: (1)
O2, (1) VAC, (1) VAC
W/SLIDE
1" VAC
1" VAC
(1) NEW VAC OUTLET.
LOCATE ADJACENT TO
EXISTING O2 OUTLET.
G12
G12
G12
CONNECT TO (E) VAC AND O2
MAINS UPSTREAM OF (E) ZVB
G13
CONNECT TO (E) VALVED
CONNECTIONS.
1/2" O
3/4" VAC
1/2" O 3/4" VAC
ALTERNATE VAC PIPING
BASE SCOPE
BASE SCOPE
(E) 3/4" O AND
3/4" VAC
G12
NO NEW MEDICAL
GAS SERVICES IN
THIS SCOPE AREA
G15
G16
3/4" O
1" VAC
3/4" O
1" VAC
1/2" O
3/4" VAC
G15
G15
G15
G15
1" VAC
3/4" O
3/4" VAC
1/2" O
PROVIDE NEW
ZONE VALVE BOX
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP, P.C.
Sheet Title:
Revisions Date
Sheet Information
Project Information
Issuance
Consultant
CENTRAL
WING
RENOVATION
3/10/2017
9:53:10 AM
180 S. Frontage
Road
West,
Vail, CO 81657
15924.00
P-131.1
LEVEL 1 AND 2 MEDICAL
GAS PLANS - CENTRAL
2017
03/10/17
PERMIT VAIL
VALLEY
MEDICAL
CENTER
A
B
C
KEYNOTES
G10 REPLACE (E) ZONE VALVE BOX. EXISTING VALVE BOX INCLUDES
OXYGEN ONLY. ADD VAC AND ROUTE TO NEW OUTLET IN
ULTRASOUND. THIS IS ADD ALTERNATE SCOPE. BASE SCOPE IS NO
HARD PIPED MODIFICATIONS TO THESE ROOMS.
G11 REPLACE EXISTING 3/4" O2 PIPING WITH NEW 2" O2 LINE AND
CONTINUE TO A FUTURE POINT OF CONNECTION AT FUTURE EAST
WING.
G12 3/4" VAC DOWN TO (1) NEW VAC OUTLET. LOCATE ADJACENT TO
EXISTING O2 OUTLET. THIS IS ADD ALTERNATE SCOPE. BASE SCOPE
IS NO HARD PIPED MODIFICATIONS TO THESE ROOMS.
G13 RE-FEED OXYGEN FROM MAINS THAT WILL REMAIN - (E) O2 VALVES
ARE FED FROM EAST WING PIPING. UTILIZE 1" O2 PIPING.
G15 PROVIDE (1) VAC AND (1) O2 OUTLET. COORDINATE WITH
ARCHITECTURAL PLANS AND ELEVATIONS FOR EXACT LOCATION. ALL
MED GAS SCOPE INDICATED ON LEVEL 2 IS AN ADDITIVE ALTERNATE.
BASE SCOPE IS NO HARD PIPED MED GASSES.
G16 CONNECT TO EXISTING O2 AND VAC. COORDINATE ALL SHUTDOWNS
CAREFULLY WITH OWNER VIA MOP. ALL MED GAS SCOPE INDICATED
ON LEVEL 2 IS AN ADDITIVE ALTERNATE. BASE SCOPE IS NO HARD
PIPED MED GASSES.
SCALE: 1/8" = 1'-0"
LEVEL 1 MEDICAL GAS PLAN - CENTRAL
SCALE: 1/8" = 1'-0"
LEVEL 1 MEDICAL GAS PLAN - PHARMACY
SCALE: 1/8" = 1'-0"
LEVEL 2 MEDICAL GAS PLAN - CENTRAL
06/30/17