HomeMy WebLinkAboutB17-0092_S-101_1498849140.pdfUP
EXISTING E-CAM EQUIPMENT TO BE RELOCATED TO
NEW CENTRAL WING NUCMED. EQUIPMENT TO BE
SUPPORTED BY EXISTING 4" REINFORCED SLAB ON
GRADE.
SEE S-102 FOR NEW
PENETRATION THROUGH
EXISTING BEAM ABOVE
THE PHARMACY
CEILING OF LEVEL 1
De01 Ce01 Be01 Ee01 Fe01 Ge01He01 Je01
4e01
5e01
6e01
Ce78
Be78
5e86 6e86 7e86 8e86
Ke86
Je86
He86
3e78 4e78 5e78 6e78 7e78 9e78 12e78 13e78 14e78 15e78 18e78 21e78
De78
De79
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP, P.C.
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant
CENTRAL
WING
RENOVATION
PERMIT 03/10/17
MM JOB #: PRINCIPAL:
EOR: PROJECT
MANAGER:
DESIGNERS:
DATE
PRINTED:
FILE PATH:
3/9/2017
3:59:52 PM
C:\Proj\16.0188 - VVMC
CENTRAL
ENABLING - RS16_mrenes.rvt
C:\Proj\16.0188 - VVMC
CENTRAL
ENABLING -RS16_mrenes.rvt
16.0188.S.01
S-101
VAIL
VALLEY
MEDICAL
CENTER
180 S. Frontage
Road W. Vail, CO 81656
LEVEL 1 FRAMING PLAN
Michael
Renes
Michael
Renes
Shane
McCormick
16.0188.S.01
Shane
McCormick 1/8" = 1'-0"
LEVEL 1
1
06/30/17