HomeMy WebLinkAboutB17-0092_S-102_1498849080.pdfUP
DN
CUT B/O BEAM
7'-11 1/2"
INSTALLATION NOTES:
1. DRILL OVERSIZED HOLES, INSTALL THROUGH BOLTS, AND NON SHRINK
GROUT BETWEEN IN THE VOID BETWEEN BOLT AND OVERSIZED HOLE.
2. INSTALL C15 EACH SIDE OF EXSITING BEAM.
3. WELD NUT AND WASHERS TO C15 BEAM AS NOTED IN 1/S-200.
4. CUT BOTTOM OF EXISTING BEAM AS NOTED IN 1/S-200.
EXISTING 12" WIDE x 5'-2 1/2" DEEP
CONCRETE BEAM AT LEVEL 2
STRUCTURE
NEW MECH DUCT THROUGH
NEW OPENING IN EXISTING
CONCRETE BEAM. SEE MECH
FOR DUCT SIZE.
1
S-200
NEW 18"x18" OPENING THROUGH
EXISTING ROOF. GC TO REMOVE
EXISTING CEILING SO THAT
STRUCTURE IS VISABLE. NOTIFY
DESIGN TEAM FOR REVIEW.
PROVIDE 500 LBS OF STRUCTURAL
STEEL FOR FRAME OPENING.
De01 Ce01 Be01 Ee01 Fe01 Ge01He01 Je01
4e01
5e01
6e01
Ce78
Be78
5e86 6e86 7e86 8e86
Ke86
Je86
He86
3e78 4e78 5e78 6e78 7e78 9e78 12e78 13e78 14e78 15e78 18e78 21e78
De78
De79
FIELD VERIFY
24'-11 1/2"
2901 Blake Street, Suite 100
Denver, CO 80205
303.861.8555
Denver
1
A
B
C
D
E
2 3 4 5 6
A
B
C
D
E
1 2 3 4 5 6
DPA Project:
Sheet Number:
COPYRIGHT - DAVIS PARTNERSHIP, P.C.
Sheet Title:
Revisions Date No.
Sheet Information
Project Information
Issuance Date
Consultant
CENTRAL
WING
RENOVATION
PERMIT 03/10/17
MM JOB #: PRINCIPAL:
EOR: PROJECT
MANAGER:
DESIGNERS:
DATE
PRINTED:
FILE PATH:
3/9/2017
3:59:57 PM
C:\Proj\16.0188 - VVMC
CENTRAL
ENABLING - RS16_mrenes.rvt
C:\Proj\16.0188 - VVMC
CENTRAL
ENABLING -RS16_mrenes.rvt
16.0188.S.01
S-102
VAIL
VALLEY
MEDICAL
CENTER
180 S. Frontage
Road W. Vail, CO 81656
LEVEL 2 FRAMING PLAN
Michael
Renes
Michael
Renes
Shane
McCormick
16.0188.S.01
Shane
McCormick 1/8" = 1'-0"
LEVEL 2
1
06/30/17