Loading...
HomeMy WebLinkAboutB17-0092_S-102_1498849080.pdfUP DN CUT B/O BEAM 7'-11 1/2" INSTALLATION NOTES: 1. DRILL OVERSIZED HOLES, INSTALL THROUGH BOLTS, AND NON SHRINK GROUT BETWEEN IN THE VOID BETWEEN BOLT AND OVERSIZED HOLE. 2. INSTALL C15 EACH SIDE OF EXSITING BEAM. 3. WELD NUT AND WASHERS TO C15 BEAM AS NOTED IN 1/S-200. 4. CUT BOTTOM OF EXISTING BEAM AS NOTED IN 1/S-200. EXISTING 12" WIDE x 5'-2 1/2" DEEP CONCRETE BEAM AT LEVEL 2 STRUCTURE NEW MECH DUCT THROUGH NEW OPENING IN EXISTING CONCRETE BEAM. SEE MECH FOR DUCT SIZE. 1 S-200 NEW 18"x18" OPENING THROUGH EXISTING ROOF. GC TO REMOVE EXISTING CEILING SO THAT STRUCTURE IS VISABLE. NOTIFY DESIGN TEAM FOR REVIEW. PROVIDE 500 LBS OF STRUCTURAL STEEL FOR FRAME OPENING. De01 Ce01 Be01 Ee01 Fe01 Ge01He01 Je01 4e01 5e01 6e01 Ce78 Be78 5e86 6e86 7e86 8e86 Ke86 Je86 He86 3e78 4e78 5e78 6e78 7e78 9e78 12e78 13e78 14e78 15e78 18e78 21e78 De78 De79 FIELD VERIFY 24'-11 1/2" 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date No. Sheet Information Project Information Issuance Date Consultant CENTRAL WING RENOVATION PERMIT 03/10/17 MM JOB #: PRINCIPAL: EOR: PROJECT MANAGER: DESIGNERS: DATE PRINTED: FILE PATH: 3/9/2017 3:59:57 PM C:\Proj\16.0188 - VVMC CENTRAL ENABLING - RS16_mrenes.rvt C:\Proj\16.0188 - VVMC CENTRAL ENABLING -RS16_mrenes.rvt 16.0188.S.01 S-102 VAIL VALLEY MEDICAL CENTER 180 S. Frontage Road W. Vail, CO 81656 LEVEL 2 FRAMING PLAN Michael Renes Michael Renes Shane McCormick 16.0188.S.01 Shane McCormick 1/8" = 1'-0" LEVEL 2 1 06/30/17