Loading...
HomeMy WebLinkAboutB17-0092_S-200_1508947819.pdfA AAPPROXIMATE LINE LOCATION 2'-8"1'-0"3'-8" 8" 2" NOTCH EXISTING CONCRETE BEAM 12x64 WITH (3) #8 T&B AND #3 TIES AT 10" OC. FIELD VERIFY ALL LOCATIONS OF EXISTING REINFORCING CEILING NEW 5" DIA HOLE. CORE THROUGH EXISTING BEAM. PRIOR TO CORING OF EXISTING BEAM, GPR (GROUND PENETRATING RADAR) EXISTING BEAM TO LOCATED REINFORCING STEEL. FIELD LOCATED HOLE AROUND EXISTING REINFORCING STEEL. DO NOT DAMAGE EXISTING REINFORCING STEEL F.V.3'-1 1/2" FFE = 61'-4"2'-8"1'-0"10" 8" CEILING 5" DIA HOLE APPROXIMATE LINE LOCATION HDG PL 3/16x3 PIPE CLAMP AND CONNECTION TO FRAME BY OTHERS HDG HSS 3/16x3x3 WITH 1/4" CAP PLATE DUCT SEE MECHANICAL HDG L4x4x3/16x2'-0 T&B 1 1 1/8 1 1/8 1 TYP. ANGLE TO EXISTING METAL STUD 1/8 2 1/8 2 1/4 EXTERIOR VENEER PROVIDE ONE FRAME EACH SIDE OF DUCT FIELD VERIFY EXISTING METAL STUD SPACINGEQEQ 1" 1'-6" 1"LOCATE BEAM REINF PRIOR TO DRILLING ANCHORS. DO NOT CUT OR DAMAGE 5/16TYP 5/16 5/16TYP 6 1/2" 4'-0" 8" VIF 1'-5" (E) 6"Ø PEN 2"1" T&B 4"4" EQ EQ 4'-0 WIDE BY 1'-6 TALL OPENING. DRILL OR CORE CORNERS. DO NOT OVERCUT WASHER PL 1/4x4x4 W/ STD HOLE C12x20.7 EF W/ 3/4"Øx4 1/2" EMBED HILTI KWIK BOLT T2 @ 12" OC 1 3/4"Ø HOLE IN CHANNEL ELEVATION 3/16 3 2 SIDES, TYP LEVEL 2 FFE EXISTING SPANDREL BEAM 4 1/2" 1'-0" 1'-4 1/2" 1'-1" 1'-0" 2" 3'-0" 6 2" MAX 1/2" 1/2"5/16 5/16 (3) SIDES TYP FITTED STIFF PL 5/16 TYP L6x4x5/16x12" @ 5'-0" OC W/ (2) 3/4"Ø HILTI KWIK TZ EXPANSION BOLTS5 1/2" F.V. 8" F.V. CUT BEYOND EAST FACE OF EXISTING COLUMN/BEAM 2"4" 2" 8" 2" EXISTING 1969 CLINIC SOFFIT EXISTING 2001 BUILDING 2ND FLOOR 4"NOTE: DO NOT DAMAGE EXISTING REBAR. PROVIDE 2" LONG SLOTTED HOLES AND PLATE WASHERS FOR FIELD ADJUSTABLITY 1/2" SHIM PLATE (F.V.) TACK WELD TO 7/8" PLATE BELOW PL 7/8"x20"x6" @5'-0" OC W/ (2) 3/4"Ø HILTI KWIK TZ EXPANSION BOLTS 8" F.V. CUT BEYOND EAST FACE OF EXISTING COLUMN/BEAM 5 1/2" F.V. 2" 8" 6" 4" EXISTING 1969 CLINIC SOFFIT EXISTING 2001 BUILDING 2ND FLOOR 4"NOTE: DO NOT DAMAGE EXISTING REBAR. PROVIDE 2" LONG SLOTTED HOLES AND PLATE WASHERS FOR FIELD ADJUSTABLITY SEE FOR ANGLE 3/4" CAP PL W/ (4) 3/4" Ø EXPANSION BOLTS 5 1/2" 8" F.V. CUT BEYOND EAST FACE OF EXISTING COLUMN/BEAM 6/S-200 HSS4x4x1/4 2" 2"8" 2"8" 2" 3/16 T&B EQEQ2" 8" 2" 3/4" PL WITH (2) 3/4"Ø HAS THR ROD. DRILL & EPOXY W/ HILTI HIT-HY 200 1 1/2" GROUT 4 1/2" EXISTING 1969 CLINIC SOFFIT 4" 4"NOTE: DO NOT DAMAGE EXISTING REBAR. PROVIDE 2" LONG SLOTTED HOLES AND PLATE WASHERS FOR FIELD ADJUSTABLITY 2901 Blake Street, Suite 100 Denver, CO 80205 303.861.8555 Denver 1 A B C D E 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DPA Project: Sheet Number: COPYRIGHT - DAVIS PARTNERSHIP, P.C. Sheet Title: Revisions Date No. Sheet Information Project Information Issuance Date Consultant CENTRAL WING RENOVATION PERMIT RESUBMISSION 07/11/17 MM JOB #: PRINCIPAL:EOR: PROJECT MANAGER: DESIGNERS:DATE PRINTED: FILE PATH: 8/31/2017 11:27:45 AMC:\Proj\16.0188 - VVMC CENTRAL ENABLING - RS17_mrenes.rvt C:\Proj\16.0188 - VVMC CENTRAL ENABLING -RS17_mrenes.rvt 16.0188.S.01 S-200VAIL VALLEY MEDICAL CENTER 180 S. Frontage Road West, Vail, CO 81657FRAMING DETAILS Michael Renes Michael Renes Shane McCormick 16.0188.S.01Shane McCormick 1/2" = 1'-0" 2 FRAMING DETAIL 1/2" = 1'-0" 3 FRAMING DETAIL 3/4" = 1'-0" 4 DUCT SUPPORT DETAIL 1 1 1 1 ADDENDUM 2 06.12.2017 1 RFC 037 08.01.2017 2 ASI 04 08.31.2017 3 3/4" = 1'-0" 9 AREA B PEN 2 3/4" = 1'-0" 6 DETAIL AT EXISTING PAN JOIST 3/4" = 1'-0" 7 DETAIL AT EXISTING 6" SLAB 3/4" = 1'-0"8 DETAIL AT EXISTING PAN JOIST AND POST DOWN TO EXST FND 3 3 3 08.31.201710/25/17