Loading...
HomeMy WebLinkAboutB16-0473_B16-0473_S-2_1483477526_1492642380.pdfWD BUILT-INS FREE STANDING TUB A S-4 B S-4 C S-4 101'-6" T.O.C. 101'-5" T.O.C. CONC. SLAB & STEPS ON GRADE NEW (2) 2x10 LEDGER, DROPPED NEW (2) 2x10 LEDGER, DROPPED F S-4 EXISTING (2) 2x12 DROPPED BEAM D S-4 E S-4 NEW 2x10 RIM JOIST EXISTING (2) 2x12 NEW 2x10 (3) 2x6 STUD PACK (DN IN CRAWL SPACE) (4) 2x6 STUD PACK UP TO UPPER LEVEL & DWN TO FTG EXIST. STUD PACK UP TO BE REMOVED w/ ADDITION OF UPPER LEVEL BEAM VERIFY EXIST. COL. UP 3" STL PIPE TO REMAIN CENTERLINE OF EXISTING CRAWL SPACE WALL NEW STUD PACK UP TO NEW UPPER LEVEL BEAM AND DOWN TO FOOTING 3-2X6 3'-0" 2'-0" NEW STUD PACK UP TO NEW UPPER LEVEL BEAM AND DOWN TO FOOTING 3-2X6 BLOCKING NEW STUD PACK DOWN TO FOOTING 3-2X6 FIRST FLOOR PLAN PLAN NOTES: 1. NEW FLOOR SHEATHING IS 3/4" TONGUE & GROOVE APA RATED STURDI-FLOOR, EXPOSURE 1, RATING 24" o.c. 2. INTERIOR STRUCTURAL COLUMNS SHALL BE (3)-2x6 MINIMUM. 3. "LVL" "MICRO-LAM OR "VL" INDICATES: LAMINATED VENEER LUMBER BEAM AS MANUFACTURED BY BOISE CASCADE CORPORATION. ALTERNATIVES SHALL HAVE THE SAME OR GREATER CAPACITIES AS THOSE LISTED IN THE "STRUCTURAL GENERAL NOTES". 4. THE EXISTING CENTRAL CRAWL SPACE WALL IS CONSTRUCTED OF PRESSURE TREATED STUDS WITH TREATED PLYWOOD SHEATHING. MODIFICATIONS REQUIRED TO THIS WALL SHALL BE MADE WITH PRESSURE TREATED WOOD AND FASTENERS THAT ARE COMPATIBLE WITH THE EXISTING SYSTEM. IF SIGNS OF ROT OR DETERIORATION OF THE EXISTING TREATED WOOD MATERIAL ARE DISCOVERED, A REPLACEMENT OF THAT MATERIAL WITH NEW SHALL BE DONE. 5. RE: ARCHITECTURAL DRAWINGS FOR RAILING AND STAIR FRAMING DETAILS. 6. DESIGN OF STRUCTURAL FRAMING MODIFICATIONS WERE BASED ON REVIEW OF ORIGINAL CONSTRUCTION DRAWINGS DATED 1991, PROPOSED ARCHITECTURAL DRAWINGS AND A SITE VISIT 9 / 29/16. DUE TO THE NATURE OF REMODEL PROJECTS THE ACTUAL ORIGINAL CONSTRUCTION MAY NOT AGREE WITH THE PROPOSED REMODEL DRAWINGS. IT IS IMPERATIVE THAT CONTRACTOR INFORM ENGINEER OF DISCREPANCIES IN MEASUREMENTS, MATERIAL AND CONSTRUCTION THAT ARE DISCOVERED DURING CONSTRUCTION SO THAT FURTHER EVALUATION AND DIRECTION CAN BE PROVIDED. 1/4" = 1'-0" NO. ISSUE PROJECT: JOB NO. SHEET NO. JURISDICTION: 16033 S-2 ENTRYWAY FOUNDATION, MAIN LEVEL FRAMING PLANS A 10.12.16 ISSUED FOR REVIEW LOT 3, LIA ZNEIMER SUBDIVISION TOWN OF VAIL, CO 1714 BUFFEHR CREEK RD RENOVATION 10.25.16 01/03/17