HomeMy WebLinkAboutElectrical Load Calcs_4.pdf 4.
r
HCE USE ONLY
• HCE No. Location
Meter Location Approved - Yes n No n Engineer
Transformer Approved - Yes n No Date
Secondary Voltage Trans Co # KVA:
HOLY CROSS ENERGY
RESIDENTIAL - LOAD INFORMATION AND METER LOCATION FORM
Is this: n Temp Service nTemp in Perm Position n Temp to Perm Permanent Position
Applicant Name Phone
ADDRESS:
SUBDIVISION ki 1J IL-List 6€ , LOT I , BLOCK I 0 ,FILING 4
PHYSICAL ADDRESS OF PROJECT nCe) 71(onC�LEGT kb , won" R
LOCATION: Within City Limits? No / Yes) City of UN L_
If location not in city limits please provide county, township, range and section.
Secondary Voltage: , lll) / 124 Phase l Secondary Wire Size 350 At GYVE
Number of conductors per phase ) Cable Distance ('Transformer to meter) / On ft
Meter Location: C Pole Structure Pedestal
NUMBERS ON FACE OF TRANSFORMER (upper left and right corners)
Nearby existing meter number
200 amp or less, self-contained meter socket 400 Amp, self-contained 10 service X
Main Fuse/ Breaker Size 20000 CT's required? N 0 Photo Voltaic
Calculated Maximum Demand (NEC) (:t, S kW Service Size U{/32.0 (amps)
ELECTRICIAN Ai L1A) LsZLC , PHONE q7,5- RQ -7355 Al Le
NAME OF HOLY CROSS ENERGY ENGINEER CONTACTED
SERVICE REQUESTED:
New Service Upgrade X
House(sq. ft) s-5-11-0 Modular(size) Other
ELECTRIC LOAD INFORMATION:
Lighting 34- kW Range: Electric 12 kW each (Number I )or Gas
Clothes Dryer. Electric kW each (Number _ ) or Gas X
Heat: Electric kW (Type ), Natural Gas/Propane X
Small appliance 3 kW, Laundry I . 5 kW, Air Conditioning S. 2 kW
Water Heater: Electric kW each (Number Natural Gas/Propane X
Other Major Electric Loads Snowmelt/Drive,Walkway, Gutter heat tape Q (kW),
08/01/10