HomeMy WebLinkAboutB16-0209_Ground Engineering - Epoxy Inspection - Parking Deck Beams_1512688150.pdf Client: Ondrej Mertlik
RD11t4D Division Six Construction
PO Box 5115
Vail, CO 81658
ENGINEERING
Davos Trail Residence
Drill and Epoxy Cover Report
Date: March 3,2017 Job Number: 16-6581
General Contractor: Division Six Construction Rep. Notified: Ondrej Mertlik
As scheduled, a representative visited the project site to perform special inspections for drill and epoxy at
locations requested.
Comments or Photos:
0 ..iJ :r s r a. �� r g,-..J.
i
' , t \.
4,4
X
a
1. ` 1 .2. 'r. .O . i ,
1
�a �ti
' II ,.
? L ,o-
'3 1-7,-..-4,,,,:w, 's4
/
y R
l�f4%," . All
'� L er4. a t .i, Ckt J. ! Tt .
Yes No
Discrepancies Reported this Date? r (iii
No. of Pages Attached: 1
Field Representative: Chris Leeper/Shane Sorensen
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum
Client: Ondrej Mertlik
SROUND Division Six Construction
PO Box 5115
Vail, CO 81658
ENGINEERING
Davos Trail Residence
Report Date: March 3,2017 Job Number: 16-6581
General Contractor: Division Six Constuction Rep.Notified: Ondrej Mertlik
Subcontractor: Division Six Constuction Rep. Notified: Ondrej Mertlik
Documents Used: Plans
Drill and Epoxy
Drilling
Location: 1.)Anchor bolts for steel beams on east side of parking structure
2.)
3.)
4.)
Orientation(vertical/horizontal): 1.) Horizontal 3.)
2.) 4.)
Hole Diameter(inches): 1.) 7/8 Length (inches): 1.) 6 3/4
2.) 2.)
3.) 3.)
4.) 4.)
Hole Spacing(inches): 1.) 8 3.)
2.) 4.)
Drilling Equipment: Hammer Drill
Method to Clean Hole: Brush and compressed air
Epoxy
Epoxy Type: Sika Pro Select Anchoring Adhesive
Epoxy Expiration: 7/6/2017
Placement Method: Epoxy gun
Reinforcement
Type(rebar/bolt/anchor): 1.) Bolt Size: 1.) 6 Length(inches) 1.) 8
2.) 2.) 2.)
3.) 3.) 3.)
4.) 4.) 4.)
Placement Method: Hand set
Additional Reinforcing Steel: N/A
Field Representative: Chris Leeper/Shane Sorensen
Comments:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum