Loading...
HomeMy WebLinkAboutB16-0209_HP Geotech - Compaction - Driveway (10-26-16)_1512688149.pdf H - P <u MAR5020 County Road 154 Glenwood Springs,CO 81601 aotechnical Engineerinc, .ngineering Geology Phone:(970)945-7988 Materials Testing i Environmental Fax: (970)945-8454 Email: hpkglenwood(a kumarusa.com Office Locations: Parker,Glenwood Springs,and Silverthorne, Colorado Earthwork Compaction Testing Report Client: Division Six Construction Project No.: 16-7-352 Day: Wednesday Attn: Randy Fischer Date: 10/26/16 P.O. Box 2952 Page: 1 of 1 Vail, CO 81658 Project: Proposed Garage Addition, 2636 Davos Trail, Lot 2, Block C, Vail Ridge, Vail, Colorado Weather: Clear, calm, dry Temperature: 49° at 10:30 am Earthwork Contractor: Division Six Construction Equipment Used: Not observed Description of Earthwork We performed compaction testing at base grade in the driveway. Both tests Tested: met minimum project compaction specifications. Sample(s) Obtained: Verbal Communication: Ondrej with Division Six Construction was informed of our test results. Placement and Compaction Procedure: Not observed by H-PlKumar Lift Thickness: Max. Rock Size: 3/4" Moisture hose Conditioning: Compactor(s) Used: Number of Passes: Nuclear Gauge Moisture/Density Test Results Test Location Depth or Field Dry Moiield Min ture Field Comp. Proctor No. Elev. Density Content Cop. Req. Lab No. (pc) % (/o) (%) 1 10'W. of center base 134.8 5.4 99 95 est. grade 2 12' E. of center base 135.6 5.8 100 95 est. grade Proctor Sample Reference: Lab No. Method Description Max. Dry Opt. Dens. (%) Moist. (%) Estimated ASTM D 698 3/4' Aggregate Base Course 136 7 THIS REPORT PRESENTS OPINIONS AS A RESULT OF OUR OBSERVATIONSOF FILL PLACEMENT WE HAVE RELIED ON THE CONTRACTOR TO CONTINUE APPLYING THE RECOMMENDED COMPACTIVE EFFORT AND MOISTURE TO FILL DURING THE TIMES WHEN OUR OBSERVER IS NOT OBSERVING OPERATIONS THE NUCLEAR DENSOMETER METHOD OF TESTING WAS USED IN SUBSTANTIAL ACCORDANCE WITH ASTM D 6938 Distribution: Division Six Construction-Randy Fischer(randyAdivisionslxconst,comi Division Six Construction--Ondrej Mertlik torn r.EisigneIxcvnst.contl Philip Orgill Steven L. Pawlak, P.E. /Ijt Field Technician Reviewed By