Loading...
HomeMy WebLinkAboutB16-0209_HP Geotech - Compaction - MSE Wall (10-05-16)_1512688151.pdf El - P I<U rtbR 5020 County Road 154 Glenwood Springs, CO 81601 Geotechnical Engineering I Engineering Geology Phone: (970)945-7988 Materials Testing I Environmental Fax:(970)945-8454 Email: hpkaIenwoodc kumarusa.com Office Locations: Parker, Glenwood Springs,and Silverthome, Colorado Earthwork Compaction Testing Report Client: Division Six Construction Project No.: 16-7-352 Day: Wednesday Attn: Randy Fischer Date: 10/5116 P.O. Box 2952 Page: 1 of 1 Vail, Colorado 81658 Project: Proposed Garage Addition, 2636 Davos Trail, Lot 2, Block C, Vail Ridge, Vail, Colorado Weather: Cloudy, calm, dry Temperature: 61° at 10:00 am Earthwork Contractor: Division Six Construction Equipment Used: Trackhoe, Hand tamper Description of Earthwork The contractor had placed backfill at the MSE wall. Both tests met minimum Tested: project compaction specifications. Sample(s) Obtained: Verbal Communication: Ondrej with Division Six Construction was informed of our test result. Placement and Compaction Procedure: Reported by the Contractor. Lift Thickness: 1' Max. Rock Size: 3/4" Moisture hose Conditioning: Compactor(s) Used: hand tamper Number of Passes: as requested Nuclear Gauge MoisturelDensity Test Results Location Field Dry Field Field Min. Test Depth or Moisture Comp. Proctor No. Elev. Density Content Comp. Req. Lab No. (pcf) (o) (%) o/ 1 south end 3rd course 130.6 6.5 96 95 212-16 2 north end 3rd course 132.0 6.8 97 95 212-16 Proctor Sample Reference: Lab No. Method Description Max. Dry Opt. Dens. (%) Moist. (%) 212-16 ASTM D 698 3/4'Aggregate Base Course 136.3 7.2 THIS REPORT PRESENTS OPINIONS AS A RESULT OF OUR OBSERVATIONSOF FILL PLACEMENT WE HAVE RELIED ON THE CONTRACTOR TO CONTINUE APPLYING THE RECOMMENDED COMPACTIVE EFFORT AND MOISTURE TO FILL DURING THE TIMES WHEN OUR OBSERVER IS NOT OBSERVING OPERATIONS. THE NUCLEAR DENSOMETER METHOD OF TESTING WAS USED IN SUBSTANTIAL ACCORDANCE WITH ASTM D 6938. Distribution: Division Six Construction-Randy Fischer(randy.±divlslonslxccnstcom) Division Six Construction—Ondrej Mertlik(pm adlvIsionsixoDnstc3m rljf Philip Orgill Steven L. Pawlak, P.E. Field Technician Reviewed By H.p Ku mAR 5020 County Road 154 Glenwood Springs,CO 81601 Geotechnical Engineering I Engineering Geology Phone:(970)945-7988 Materials Testing 1 Environmental Fax (970)945-8454 Email: hpkulenwoodt kumarusa.com Office Locations: Parker,Glenwood Springs,and Silverthome, Colorado Earthwork Compaction Testing Report Client: Division Six Construction Project No.: 16-7-352 Day: Thursday Attn: Randy Fischer Date: 1016116 P.O. Box 2952 Page: 1 of 1 Vail, Colorado 81658 Project: Proposed Garage Addition, 2636 Davos Trail, Lot 2, Block C, Vail Ridge, Vail, Colorado Weather: Cloudy, calm, dry Temperature: 48° at 10:30 am Earthwork Contractor: Division Six Construction Equipment Used: Trackhoe, Hand tamper Description of Earthwork MSE wall backfill continues. Compaction was judged to be adequate based on Tested: our test results. Sample(s) Obtained: Verbal Communication: Ondrej with Division Six Construction was informed of our test result. Placement and Compaction Procedure: Reported by the Contractor. Lift Thickness: 1' Max. Rock Size: 3/411 Moisture hose Conditioning: Compactor(s) Used: hand tamper Number of Passes: as requested Nuclear Gauge Moisture/Density Test Results Location Field Dry Field Field Min. Test Depth or Moisture Comp. Proctor No. Elev. DSP y Content Comp. Req. Lab No. (%) 1 at radius 6th course 134.8 6.8 99 95 212-16 Proctor Sample Reference: Lab No. Method Description Max. Dry Opt. Dens. (%) s Moist. (%) 212-16 ASTM D 698 3/:'Aggregate Base Course 136.3 7.2 THIS REPORT PRESENTS OPINIONS AS A RESULT OF OUR OBSERVATIONSOF FILL PLACEMENT WE HAVE RELIED ON THE CONTRACTOR TO CONTINUE APPLYING THE RECOMMENDED COMPACTIVE EFFORT AND MOISTURE TO FILL DURING THE TIMES WHEN OUR OBSERVER IS NOT OBSERVING OPERATIONS THE NUCLEAR DENSOMETER METHOD OF TESTING WAS USED IN SUBSTANTIAL ACCORDANCE WITH ASTM D 6938 Distribution: Division Six Construction-Randy Fischer(randv@divlsionsixconst.com) Division Six Construction—Ondrej Mertlik tom@dEwlslgnsixconst.coml lilt Philip Orgill Steven L. Pawlak, P.E. Field Technician Reviewed By