Loading...
HomeMy WebLinkAboutB16-0209_HP Geotech - Compaction - MSE Wall (9-16-16)_1512688151.pdf H5020 mA County Road 154 Glenwood Springs, CO 81601 Geotechnical engineering I Engineering GL Phone: (970)945-7988 Materials Testing I Environmental Fax: (970)945-8454 Email: hpkolenwoodAkumarusa.com Office Locations: Parker, Glenwood Springs,and Silverthome, Colorado Earthwork Compaction Testing Report Client: Division Six Construction Project No.: 16-7-352 Day: Friday Attn: Randy Fischer Date: 9116116 P.O. Box 2952 Page: 1 of 1 Vail, Colorado 81658 Project: Proposed Garage Addition, 2636 Davos Trail, Lot 2, Block C, Vail Ridge, Vail, Colorado Weather: Clear, calm, dry Temperature: 63° at 10:00 am Earthwork Contractor: Division Six Construction Equipment Used: not observed Description of Earthwork The contractor had completed backfill operations under the planned MSE wall. Tested: Both tests met minimum project compaction specifications. Sample(s) Obtained: Verbal Communication: Ondrej with Division Six Construction was informed of our test result. Placement and Compaction Procedure: Reported by the Contractor. Lift Thickness: 1' Max. Rock Size: ,/" Moisture hose Conditioning: Compactor(s) Used: hand tamper Number of Passes: as requested Nuclear Gauge Moisture/Densi Test Results Location Field Dry Field Field Min. Test Depth or Moisture Camp. Proctor No. Elev. Density Content Comp. Req. Lab No. (pc0 °/o (%) (°% 1 'S.of column base 18137.6 4.5 100 95 212-16 grade 2 between columns base 139.0 4.7 100 95 212-16 grade Proctor Sample Reference: Lab No. Method Description Max. Dry Opt. Dens. (%) Moist. (%) 212-16 ASTM t7 698 %'Aggregate Base Course 136.3 7.2 THIS REPORT PRESENTS OPINIONS AS A RESULT OF OUR OBSERVATIONSOF FILL PLACEMENT WE HAVE RELIED ON THE CONTRACTOR TO CONTINUE APPLYING THE RECOMMENDED COMPACTIVE EFFORT AND MOISTURE TO FILL DURING THE TIMES WHEN OUR OBSERVER IS NOT OBSERVING OPERATIONS THE NUCLEAR OENSOMETER METHOD OF TESTING WAS USED IN SUBSTANTIAL ACCORDANCE WITH ASTM O 6938 Distribution: Division Six Construction-Randy Fischer(randYadivIsionsixGori t.Gom) Division Six Construction—ondrej Mertilk(om@dIvisionsixconst.coml nif Philip Orgill Steven L. Pawlak, P.E. Field Technician Reviewed By