Loading...
HomeMy WebLinkAboutB16-0209_HP Geotech - Compaction - Parking Deck Piers (09-14-16)_1512688151.pdf H-p Ku MAR5020 County Road 154 Glenwood Springs,CO 81601 .�clttechnical Engineering I Engineering Geology Phone: (970)945-7988 Materials Testing I Environmental Fax: (970)945-8454 Email: hpkglenwood(&kumarusa,com Office Locations: Parker, Glenwood Springs,and Silverthome, Colorado Earthwork Compaction Testing Report Client: Division Six Construction Project No.: 16-7-352 Day: Wednesday Attn: Randy Fischer Date: 9/14/16 P.O. Box 2952 Page: 1 of 1 Vail, Colorado 81658 Project: Proposed Garage Addition, 2636 Davos Trail, Lot 2, Block C, Vail Ridge, Vail, Colorado Weather: Partly cloudy, calm, dry Temperature: 66° at 12:06 pm Earthwork Contractor: Division Six Construction Equipment Used: Hand tamp Description of Earthwork The contractor has reportedly placed about 3' of 3/4"aggregate base course Tested: around the elevated parking columns. Compaction testing indicated adequate compaction. Sample(s) Obtained: yes Verbal Communication: Ondrej with Division Six Construction was informed of our test result. Placement and Compaction Procedure: Reported by the Contractor. Lift Thickness: 1' Max. Rock Size: 3/R„ Moisture hose Conditioning: Compactor(s) Used: hand tamper Number of Passes: as requested Nuclear Gauge MoisturelDensity Test Results Field Min. Test Location Depth or Field Dry Moisture Field Comp Proctor n No. Elev. D{p o sitY Content Cha/o} Req. Lab No. 4' below 1 between columns bottom of 134.8 5.8 98 95 212-16 wall Proctor Sample Reference: Lab No. Method Description Max. Dry Opt. Dens. (%) Moist. (%) 212-16 ASTM El 698 W' Aggregate Base Course 136.3 7.2 THIS REPORT PRESENTS OPINIONS AS A RESULT of OUR OBSERVATIONSOF FILL PLACEMENT WE HAVE RELIED ON THE CONTRACTOR TO CONTINUE APPLYING THE RECOMMENDED COMPACTIVE EFFORT AND MOISTURE TO FILL DURING THE TIMES WHEN OUR OBSERVER tS NOT OBSERVING OPERATIONS THE NUCLEAR DENSO$AETER METHOD OF TESTING WAS USED IN SUBSTANTIAL ACCORDANCE WITH ASTM D 6938 Distribution: Division Six Construction-Randy Fischer(randvedivisionsixconst.com) Division Six Construction—Ondrej Mertlik tom¢ divisionsixeonst.coml lijf Philip Orgill Steven L. Pawlak, P.E. Field Technician Reviewed By Laboratory Proctor Compaction Test Report 137.5 I i—— --— _ T i i 7 2°/Q, 136.3 pc I __ 136 — 1 -_ --,-1 ^l i i __ LL \i ! _- i 1 _ _ ____ ir _4%i34. I ! 134.5 i i —1 1 ,_ I r c I W a) a 133 i ! i I i i i 131.5 ik ! _ N\L ZAV for — --- i Sp.G. = 130 I i i 2.63 5 6 7 8 9 10 11 Water content,% ---Rock Corrected >—-Uncorrected Test specification ASTM D 698-00a Method C Standard Oversize corr. applied to each test point Elev! Classification Nat. °/Q n % Depth USCS AASHTO Moist. Sp.G. LL PI 314 in. No.200 GP-GM A-1-a NV NP 10.0 8.3 ROCK CORRECTED TEST RESULTS UNCORRECTED MATERIAL DESCRIPTION Maximum dry density = 136.3 pcf 134.4 pcf Class 6 Aggregate I3ase Course Optimum moisture = 7.2°.a 7.9% Project No. 16.7-352 Client: Division Six Construction Remarks: Project: Lot 2,Block C,Vail Ridge 2636 Davos Trail,Vail,Colorado See Figure IA for classification results. o Location:On Site Stockpile Sample Number: 212-16 Hepworth-Pawlak Geotechnical, Inc. Glenwood Springs, Colorado Figure 1 Tested By: KO Checked By: SLP Particle Size Distribution Report c c c 6 S Sa 0 O g ❑ g a g co ea N . r : :t 1�1 R i A 7k ; ; i 100 I I 1k\ I I I I ' I ! ! 1 T- - 114"ABC Class 6 ' I . '\I I I I I I I I 1 1 90 I \ I I I . 4 1 I -I I 1 ' I 1 I k I \1 I I 1 I 1 I 1I 80 I I\ I I __ I I i ' ` I AI " 70 I Irl \\ I I ] f , _ ! I ! I Il I W 60I , I \ I I I t i `: E I \ I \ I I I I z 50 I t I \\ I , I I I W I ‘ • ti 1 I I I C I \ I �� I I I I Lu a 40 I 1 I • l-~ I • z . , All._ I I I iI I ' I I I I I I ` • I �\ I I 30 I I I I . I 'I 11 I I I I `� I • I I \ 1 I 20 I I I I ��i 1 `l 1---I` . I _ I I l 1 1 I h-. 1 ■ I I ' L 1 I 1 I I i-� I 10 4 I I I 1 I I I �I.j I I 0 1 I I l I 11 . : I 1 I I I I i 100 10 1 0.1 0.01 0.001 GRAIN SIZE-mm. y.+3" • %Gravel 1 Sand %Fines Coarse Fine Coarse Medium Fine Silt _ Clay 0 10 42 9 18 13 8 SIEVE PERCENT SPEC.. PASS? Material Description SIZE FINER PERCENT (X=NO) Class 6 Aggregate Base Course 1.5 100 .75 90 100- 100 .375 62 Atterberq Limits #4448 30-65 PL= NP LL= NV PI= NP #8 40 25-55 #16 34 Coefficients_ #30 26 D85= 16.8322 D60= 8.6238 D50 5.2469 #50 16 030= 0.8414 D15= 0.2612 D10 0.1160 #100 11 Cu— 74.32 Cc= 0.71 #200 8.3 3 12 Classification USCS= GP-GM PASHTO= A-1-a Remarks See Figure 1 for standard Proctor compaction results. 3W"ABC Class 6 Location: On Site Stockpile Sample Number: 212.16 Date: 9/14/20 I 6 ____ Hepworth-Pawlak Client: Division Six Construction Project: Lot 2,Block C,Vail Ridge 2636 Davos Trail,Vail,Colorado Geotechnical, Inc. Glenwood Springs, Colorado Project No: 16-7-352 Figure IA Tested By: KO - Checked By: SLP