Loading...
HomeMy WebLinkAboutB16-0209_HP Geotech - Compaction + MSE Wall (10-11-16)_1512688150.pdf H-p <U It\/I 5020 County Road 154 Glenwood Springs,CO 81601 aoiechnical Engines igir. Phone: (970)945-7988 Iviaterials Testing I Environmental Fax:(970)945-8454 Email: hpkolenwoodekumarusa.com Office Locations: Parker,Glenwood Springs,and Silverthome,Colorado Earthwork Compaction Testing Report Client: Division Six Construction Project No.: 16-7-352 Day: Tuesday Attn: Randy Fischer Date: 10/11/16 P.O. Box 2952 Page: 1 of 1 Vail, CO 81658 Project: Proposed Garage Addition, 2636 Davos Trail, Lot 2, Block C, Vail Ridge, Vail, Colorado Weather: Partly cloudy, calm, dry Temperature: 51° at 10:30 am Earthwork Contractor: Division Six Construction Equipment Used: Trackhoe, Hand tamper Description of Earthwork We visited the site to observe MSE wall construction and to perform Tested: compaction testing. Sample(s) Obtained: Verbal Communication: Ondrej with Division Six Construction was informed of our test results. Placement and Compaction Procedure: Observed by H-P/Kumar on part time basis. Lift Thickness: 6" Max. Rock Size: S/4" Moisture hose Conditioning: Compactor(s) Used: Hand tamper Number of Passes: as requested Nuclear Gauge Moisture/Density Test Results Location Field Dry Field Field Min. Test Depth or Moisture Comp. Proctor om No. Elev. Dip y Content C °0 p' Req. Lab No. ) (%) 1 10'S. of N.end 5'^course 131.6 7.6 97 95 est. 2 at radius 8th course 132.2 6.7 97 95 est. Proctor Sample Reference: Lab No. Method Description Max. Dry Opt. _ Dens. (%) Moist. (%) estimated ASTM D 698 3/:'Aggregate Base Course 136 7 THIS REPORT PRESENTS OPINIONS AS A RESULT OF OUR OBSERVATIONSOF FILL PLACEMENT WE HAVE RELIED ON THE CONTRACTOR TO CONTINUE APPLYING THE RECOMMENDED COMPACTIVE EFFORT AND MOISTURE TO FILL DURING THE TIMES WHEN OUR OBSERVER IS NOT OBSERVING OPERATIONS THE NUCLEAR DENSOMETER METHOD OF TESTING WAS USED IN SUBSTANTIAL ACCORDANCE WITH ASTM D 6938 Distribution: Division Six Construction-Randy Fischer(randy@divisionsixconst.com) Division Six Construction—Ondrej Mertlik(et m dlVJsiansixcanst.com} /Ijf Philip Orgill Steven L. Pawlak, P.E. Field Technician Reviewed By