HomeMy WebLinkAboutB16-0209_HP Geotech - Rebar - Garage Walls (09-28-16)_1512688150.pdf 5020 County Road 154
Glenwood Springs, CO 81601
Geotechnical Engineering I Engineering Geology Phone: (970)945-7988
Materials Testing I Environmental Fax: (970)945-8454
Email: hpkglenwoodekumarusa.com
Office Locations: Parker,Glenwood Springs, and Silverthome, Colorado
REINFORCEMENT STEEL INSPECTION REPORT
Client: Division Six Construction Project No.: 16-7-352 Day: Wednesday
Attn: Randy Fischer Date: 9/28/16
2636 Davos Trail Page: 1 of 1
Vail, Colorado 81657
Project: Proposed Garage Addition, 2636 Davos Trail, Lot 2, Block C, Vail Ridge, Vail, Colorado
Area of Inspection: All new garage foundation walls, Lower level addition and one 12" pier.
Reference Documents Sheet S1.1, Foundation Plan Dated 5-11-16 and Details 36 and 39 on
Used: Sheet S2.5.
Inspection Notes:
Inspection Status: ❑ Preliminary ® Final
❑ Concrete reinforcement as noted above was judged to be in reasonable conformance with the
referenced construction documents.
❑ Exceptions Noted:
Verbal Ondrej with Division Six Construction was informed of our inspection
Communication: results.
Distribution:
Division Six Construction-Randy Fischer(randydivisionsixconst.carnl
Division Six Construction—Ondrej Mertlik(o mdivisionsixconst.com)
ilii
Philip Orgill Steven L. Pawlak, P.E.
Field Technician Reviewed By