Loading...
HomeMy WebLinkAboutB16-0222_A103 Roof Plan_1478902135.pdf1/4"=1'-0" A103 ROOF PLAN Sheet Scale 04.08.2016 1414 Project Date 1414 Moraine Drive Lot 7 Filing 1 Dauphinais Moseley Vail, Colorado 1414 Moraine Drive Revision/Issue Project Name and Address General Contractor GILLETTE LLC CONSTRUCTION POST OFFICE BOX 5821 888.719.1123 VAIL COLORADO 81658 gillettellc.com 05.31.2016 Permit Submittal 8162'-2 3/16" 8:12 8:12 8:12 8:12 6:12 6:12 8:12 8:12 1 A103 6 A103 4 A103 2 103 5 A103 Scale: 1/8"=1'-0" Upper North Bed 1 Scale: 1/8"=1'-0" Mid East Bath 3 10'-4" Scale: 1/8"=1'-0" South East Bed 4 10'-0" 10'-0" Scale: 1/8"=1'-0" Living Room 5 15'-5" 17'-5316" Scale: 1/8"=1'-0" South West Bed 6 10'-0" 7'-038" 10'-0" 8163' 8159'-1 13/16" 8157'-5 13/16" 8:12 8:12 6:12 9'-0" 9'-0" 3 103 8:12 8:12 8161'-1 13/16" Scale: 1/8"=1'-0" Guest Living 2 8'-4" 10'-6" 10'-0" 8162'-2 3/16" 8163'-0" 8161'-1 13/16" 8159'-1 13/16" 8157'-5 13/16" 8131'- 0" 8142'-0 5/8" Gutter, Heat Tape & Snow Guard 2'-0" 2'-0" 2'-0" 2'-0" 1'-6" 1'-6" 2'-0" 2'-0" 2'-0" 2'-0" 2'-0" 1'-6" 2'-0" 2'-0" 1'-6" 2'-0" 2'-0" 2'-0" NOTES: 07551 Roof Membrane 1. Include the material and labor to install Carlisle WIP or equal ice and water shield under all shingle roofing areas per manufactures instructions. 2. Membrane waterproofing is to cover all surfaces including ridges and valleys. 3. Extend up face of adjoining vertical walls a minimum of 4' behind finishes. 4. Install membrane full height at the chimneys. 5. Include high temp membrane at metal roof locations. 6. Include a 10-year warranty on the membrane. 7. Include mastic at all penetrations, including those needed to install snow guards and clips. 8. Include all Kynar coated metal eave, gable, valley “W” flashing with 4” exposure, cricket, stone ledge, chimney cap, and step flashing related to this scope of work. Wall flashing will run 12” up all walls. 07143 Deck Waterproofing System 1. Include the material and labor to install Carlisle Vapor-Lock Hot Applied Waterproofing System per the manufacturer's recommendations at the north east deck. 2. Include all Kynar coated metal related to this scope of work. 3. Assume the Vapor-Lock System will be applied over tapered insulation sloped to a center drain. 4. Extend system 18” vertically on adjacent walls. 5. Assume there will be a built up 2x curb at the leading edge of the deck. 6. Assume the deck will be finished with concrete. 07311 Shingles 1. Provide the material and labor to install the Davinchi Class A Multi-width shakes per the manufacture's specifications. 07/29/16