Loading...
HomeMy WebLinkAboutB16-0222_G000 Code Review_1469830500.pdfG000 CODE REVIEW Sheet Scale 04.08.2016 1414 Project Date 1414 Moraine Drive Lot 7 Filing 1 Dauphinais Moseley Vail, Colorado 1414 Moraine Drive Revision/Issue Project Name and Address General Contractor GILLETTE LLC CONSTRUCTION POST OFFICE BOX 5821 888.719.1123 VAIL COLORADO 81658 gillettellc.com 05.31.2016 Permit Submittal 06.09.2016 Load Calculations 06.28.2016 Permit Resubmittal Scale: 1"=20'-0" Upper Level 3 Scale: 1"=20'-0" Lower Level 2 Scale: 1"=20'-0" Site Coverage 1 SDD 22 Zoning Review Lot Size 11823 GRFA Allowed Not Applicable Site Coverage Allowed 25% 2956 Main House 3070 Proposed Site Coverage 2953 Single Guest 425 South Patio 504 Double Guest 1257 Driveway 1870 Total Living Square Footage 4752 Landscaping 6496 Garage 649 % Landscaping 0.55 Gross Square Footage 5401 Snow Storage 30% 561 Max Building Height 33'-0" Dwelling Units Allowed 1 Required Parking 4000-5500 4 Enclosed Parking 1 GENERAL NOTES ALL CONSTRUCTION AND MATERIALS SHALL BE AS SPECIFIED, AND IN ACCORDANCE WITH ALL APPLICABLE CODES, ORDINANCES, PERMITS, AND CONTRACT DOCUMENTS. THE SUB-CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS BEFORE STARTING WORK. SHOULD A DISCREPANCY APPEAR IN THE CONTRACT DOCUMENTS, OR BETWEEN THE CONTRACT DOCUMENTS AND EXISTING CONDITlONS, THE SUB-CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR. SHOULD A CONFLICT OCCUR IN OR BETWEEN DRAWINGS AND SPECIFICATIONS, CONSULT WITH THE GENERAL CONTRACTOR FOR CLARIFICATION. DETAILS NOT SHOWN ON THE DRAWINGS SHALL BE CONSTRUED IN A MANNER SIMILAR TO THE DETAILS THAT ARE SHOWN FOR LIKE CONDITIONS. THESE ITEMS SHALL BE BROUGHT TO THE ATTENTION OF THE GENERAL CONTRACTOR AS SOON AS POSSIBLE FOR APPROVAL. DATUM 100'-0" EQUALS DATUM 0100' USGS SHEET INDEX G000 CODE REVIEW C101 SITE & LANDSCAPE PLAN A101 LOWER LEVEL A102 UPPER LEVEL A103 ROOF PLAN A201 NORTH & SOUTH ELEVATIONS A202 EAST AND WEST ELEVATIONS A301 WALL SECTIONS A601 WINDOWS & DOORS E101 LOWER LEVEL LIGHTING E102 UPPER LEVEL LIGHTING S1 STRUCTURAL NOTES S2 FOUNDATION PLAN S3 MAIN LEVEL FRAMING S4 ROOF FRAMING S5 STRUCTURAL DETAILS Town of Vail Adopted Codes & Standards: 2015 International Residential Code 2012 International Plumbing Code 2015 International Mechanical Code 2012 International Fuel Gas Code 2015 International Fire Code 2015 International Energy Conservation Code 2014 National Electrical Code 2015 Amendments located in Ordinance No. 14, Series 2015 Inspections: Open Hole Soils Report Foundation Footing Foundation Wall Foundation ILC Electrical Service Underground Plumbing In-floor Heat Framing ILC Fire Alarm Rough-in Fire Sprinkler Rough-in Domestic H2O Waste & Vent Gas Venting Fireplace Rough-in Electrical Rough-in Structural Engineer's Field Inspection Framing Insulation 1-hour Separation Snowmelt - Send Pictures of Snowmelt in Right of Way to Public Works Blower Door Test Plumbing Final Mechanical (Heat) Final Mechanical (Venting) Final Mechanical (Fireplace) Final Electrical Final Planning Final Public Works Final Fire Alarm Final Fire Sprinkler Final Building Final Fire Alarm: Fire Alarm System to comply with current NFPA 72, NFPA 720, 2015 International Fire Code, and Vail Fire and Emergency Services fire sprinkler installation standards. Scale: 1/4"=1'-0" Radon Vent 4 NOTES: 1. Openings around bathtubs, showers, water closets, pipes, wires or other objects that penetrate concrete slabs or other floor assemblies shall be filled with a polyurethane caulk or equivalent sealant applied in accordance with the manufacturer’s recommendations. 2. Condensate drains shall be trapped or routed through non perforated pipe to daylight. 3. Sump pits open to soil or serving as the termination point for sub-slab or exterior drain tile loops shall be covered with a gasketed or otherwise sealed lid. 4. Penetrations of concrete walls shall be filled. 5. Ductwork passing through or beneath a slab shall be of seamless material unless the air-handling system is designed to maintain continuous positive pressure within such ducting. Joints in such ductwork shall be sealed to prevent air leakage. Provide 4" ABS, PVC, or equivlent gas-tight, subslab depressurization vent. Route through interior walls to roof. Provide positive drainage to the ground beneath the slab. All control joints, isolation joints, construction joints and any other joints in concrete slabs or between slabs and foundation walls shall be sealed with a caulk or sealant. Gaps and joints shall be cleared of loose material and filled with polyurethane caulk or other elastomeric sealant applied in accordance with the manufacturer’s recommendations. Install continuous layer of InsulTarp R-6 Subslab insulation/vapor barrier on top of 4" of free draining gravel per manufacture's instruction. The sheeting shall fit closely around any pipe, wire or other penetrations of the material. Extend vent pipe 12" above roof. Install 90 degree fitting and 4" drain tile embedded in free draining gravel. Extend to lower guest and garage slabs. Provided sprayed Dissco waterproofing at basement walls and damp proofing at frost walls per manufacture's instructions. Allow for future fan in laundry attic. Provide 110 volt outlet. Occupancy Group: R-3 Residential One and Two Family Construction Type: VB Fire Sprinkler System: Automatic residential fire sprinkler systems shall be designed and installed in accordance with NFPA 13D and Vail Fire and Emergency Services fire sprinkler installation standards. 07/29/16