HomeMy WebLinkAboutB16-0266_E131_1502723395.pdfSB
SB SB SB
EWH-1
N.I.C.
N.I.C.
26.51
AHU-5
EF-06 26.52
EF-05
MEETING
ROOM
127
BOARDROOM
126
POOL EQUIP
145
MECHANICAL
146
OFFICE 4
129
ELECTRICAL
116
FITNESS
CENTER
148
SKI & BOOT
STORAGE
111
WORK AREA
108
GM OFFICE
106
BALLROOM/
MEETING
ROOM
104
LUGGAGE
ROOM
118
ROOM
122
ROOM
121
ROOM
120
MASSAGE/
SPA WAITING
119
ROOM
123
CORRIDOR
119B
ROOM
124
STORAGE
135
EMPLOYEE
BREAK
ROOM
136
RECEPTION
128
LOBBY
LOUNGE
WITH
CONNECTIVITY
ZONE
102
VESTIBULE
101
SKI BOOT
REMOVAL
AREA
110
RETAIL
109
OFFICE 3
130
OFFICE 1
132
MADE
MARKET
105
KITCHEN
151
LOBBY BAR
103
CHECK-IN
107
EXIT
PASSAGE
112
EXIT
PASSAGE
114
ELEVATOR
EQUIP
113
ROOM
115
TELECOM
ROOM
117
M EMPLOYEE
LOCKER
ROOM
138
WOMEN'S
BATHROOM
139
MEN'S
BATHROOM
141
GUEST
LAUNDRY
147
MEN'S
149
WOMEN'S
150
CORRIDOR
140
PREFUNCTION
152
MEETING
STORAGE
153
W EMPLOYEE
LOCKER
ROOM
137
CORRIDOR
125
OFFICE 2
131
26.47
CU-5
26.48
26.52
P1
J
26.49
EF-7
EF-8
26.45
26.45
26.50
LLD
B
LIGHTING
CONTROL
PANEL
1 A 2 3 4 5 6 A B C D E
1
3 4 5 6 2
COPYRIGHT 2016 BASKERVILL. USE OF THIS WORK IN WHOLE OR IN
PART IS FORBIDDEN WITHOUT EXPRESSED WRITTEN CONSENT.
B C D E
DRAWING
NO.
P.O. BOX 400, RICHMOND, VA 23218-0400
DRAWING TITLE
ISSUE
PROJECT
OWNER
®
7/31/2017
9:14:02 AM
1st FLOOR PLAN -
MECHANICAL POWER
THE WIDEWATERS
GROUP
2.160036.0
DOUBLETREE VAIL,
CO CONVERSION
GUESTROOMS &
PUBLIC SPACES
RENOVATION
08/25/16 -
CONSTRUCTION
DOCUMENTS
E131
2211 N FRONTAGE
RD, VAIL, COLORADO
81657
KEYNOTES
26.49 FIELD VERIFY FINAL LOCATION FOR VAV CONTROL TRANSFORMER PRIOR TO
ROUGH-IN. CONNECT TO AVAILABLE 20A 1P 120V CIRCUIT OR PROVIDE MATCHING
AIC 20A 1P CIRCUIT BREAKER IN AVAILABLE SPACE AS NEEDED. FIELD VERIFY
PANEL DESIGNATIONS AND CIRCUIT AVAILABILITY.
26.50 FIELD VERIFY FINAL LOCATION FOR PUMP P1' PRIOR TO ROUGH-IN. CONNECT TO
AVAILABLE 15A 3P 208V CIRCUIT OR PROVIDE MATCHING AIC 15A 3P CIRCUIT
BREAKER IN AVAILABLE SPACES AS NEEDED. COORDINATE OVER CURRENT WITH
HVAC CONTRACTOR AND PROVIDE AS REQUIRED. PROVIDE MOTOR STARTER /
DISCONNECT PER NAMEPLATE DATA AND LOCATE AT/ON PUMP.
26.51 PROVIDE 2P 50A MATCHING AIC CIRCUIT BREAKER IN AVAILABLE SPACES.
PROVIDE (2) #8, (1) #10 - 3/4" C. AND CONNECT TO NEW EWH-1.
26.52 CONNECT FAN TO LIGHTING CIRCUIT AHEAD OF LOCAL SWITCHING SO AS TO
REMAIN ON AT ALL TIMES.
26.45 CONNECT TO AVAILABLE 20A 1P 120V CIRCUIT MADE AVAILABLE DURING
DEMOLITION OR PROVIDE MATCHING AIC 20A 1P CIRCUIT BREAKER IN AVAILABLE
SPACE OF EXISTING PANELBOARD AS NEEDED. FIELD VERIFY PANEL
DESIGNATIONS AND CIRCUIT AVAILABILITY.
26.47 CONNECT TO AVAILABLE 15A 3P 208V CIRCUIT BREAKER OR PROVIDE MATCHING
AIC 15A 3P CIRCUIT BREAKER IN AVAILABLE SPACES AS NEEDED.
26.48 PROVIDE MATCHING AIC 60A 3P CIRCUIT BREAKER IN AVAILABLE SPACES.
EXTEND CIRCUIT AND FEED EQUIPMENT WITH (3) #6, (1) #10GND - 1"C.
SCALE: 1/8" = 1'-0" DRAWING REF: E401a
6A1st FLOOR PLAN - MECHANICAL POWER
1 8/25/2016 FOR CONSTRUCTION SET
9 7/21/17 CCD-05
07/31/2017
08/14/17