HomeMy WebLinkAboutB16-0266_E403_1502723340.pdfkp
kp
J M Ref.
Under
Counter
V
J
J
M
H
ZONE
ZONE
BOARDROOM
126
MEETING
ROOM
127
ZONE
ZONE
CONNECT TO
CORRIDOR LIGHTING
CIRCUIT & CONTROLS
CONNECT TO
CORRIDOR LIGHTING
CIRCUIT & CONTROLS
26.31
26.31
R2
R4 R4
TYPICAL
TYPICAL
R2
R4
R4
R4
R4
R4
R2
R2
R2
R2
26.33
L1 L1E L1 P1
R4
ZONE ZONE
ZONE
R2E
R2E
R2E
R2E R2E
R2E
R2E
G H
H H
40" 40"
PR
H
40"
PR
PR
PR
BOARDROOM
126
MEETING
ROOM
127
26.45 26.45
26.45 26.45
26.53
PR
26.45 26.59
48"
48"
26.105
26.105
1 A 2 3 4 5 6 A B C D E
1
3 4 5 6 2
COPYRIGHT 2016 BASKERVILL. USE OF THIS WORK IN WHOLE OR IN
PART IS FORBIDDEN WITHOUT EXPRESSED WRITTEN CONSENT.
B C D E
DRAWING NO.
P.O. BOX 400, RICHMOND, VA 23218-0400
DRAWING TITLE
ISSUE
PROJECT
OWNER
®
7/31/2017
9:14:06 AM
ENLARGED PLANS -
MEETING ROOMS
THE WIDEWATERS
GROUP
2.160036.0
DOUBLETREE VAIL,
CO CONVERSION
GUESTROOMS &
PUBLIC SPACES
RENOVATION
08/25/16 -
CONSTRUCTION
DOCUMENTS
E403
2211 N FRONTAGE
RD, VAIL, COLORADO
81657
SCALE: 1/4" = 1'-0" DRAWING REF: E111
2ALIGHTING PLAN - MEETING ROOMS
SCALE: 1/4"
= 1'-0" DRAWING REF: E121
4A POWER AND COMMUNICATIONS PLAN - MEETING ROOMS
KEYNOTES
26.31 PROVIDE NEW LIGHTING CONTROLS / PANEL EQUAL TO LUTRON GRAFIK EYE QS.
26.33 PROVIDE RECESSED JUNCTION BOXES AND LIGHTING CIRCUIT THRU NEW
LIGHTING CONTROLS. INSTALL PENDANT LIGHTING SUPPLIED BY OTHERS AND
MAKE ALL FINAL CONNECTIONS.
26.45 CONNECT TO AVAILABLE 20A 1P 120V CIRCUIT MADE AVAILABLE DURING
DEMOLITION OR PROVIDE MATCHING AIC 20A 1P CIRCUIT BREAKER IN AVAILABLE
SPACE OF EXISTING PANELBOARD AS NEEDED. FIELD VERIFY PANEL
DESIGNATIONS AND CIRCUIT AVAILABILITY.
26.53 SAWCUT / TRENCH AND REPAIR FLOOR AS REQUIRED. PROVIDE RECESSED
FLOORBOX / POWER AND RECEPTACLES FOR MILLWORK / FURNITURE.
COORDINATE FINAL LOCATION WITH ARCHITECTS DRAWINGS.
26.59 PROVIDE POWER TO RECESSED MOTORIZED SCREEN AS ADD / ALTERNATE.
26.105 PROVIDE RECEPTACLE AND DATA OUTLET FOR DIGITAL EVENT READER. EXTEND
RECEPTACLE TO NEAREST RECEPTACLE CIRCUIT AND CONNECT. COORDINATE
FINAL LOCATION AND REQUIREMENTS WITH APPROVED PROVIDER PRIOR TO
ROUGH-IN.
1 8/25/2016 FOR CONSTRUCTION SET
5 12/07/2016 RFI #55
6 1/09/2017 CCD-03
9 7/21/17 CCD-05
07/31/2017
08/14/17