Loading...
HomeMy WebLinkAboutB16-0266_E403_1502723396.pdfkp kp J M Ref. Under Counter V J J M H ZONE ZONE BOARDROOM 126 MEETING ROOM 127 ZONE ZONE CONNECT TO CORRIDOR LIGHTING CIRCUIT & CONTROLS CONNECT TO CORRIDOR LIGHTING CIRCUIT & CONTROLS 26.31 26.31 R2 R4 R4 TYPICAL TYPICAL R2 R4 R4 R4 R4 R4 R2 R2 R2 R2 26.33 L1 L1E L1 P1 R4 ZONE ZONE ZONE R2E R2E R2E R2E R2E R2E R2E G H H H 40" 40" PR H 40" PR PR PR BOARDROOM 126 MEETING ROOM 127 26.45 26.45 26.45 26.45 26.53 PR 26.45 26.59 48" 48" 26.105 26.105 1 A 2 3 4 5 6 A B C D E 1 3 4 5 6 2 COPYRIGHT 2016 BASKERVILL. USE OF THIS WORK IN WHOLE OR IN PART IS FORBIDDEN WITHOUT EXPRESSED WRITTEN CONSENT. B C D E DRAWING NO. P.O. BOX 400, RICHMOND, VA 23218-0400 DRAWING TITLE ISSUE PROJECT OWNER ® 7/31/2017 9:14:06 AM ENLARGED PLANS - MEETING ROOMS THE WIDEWATERS GROUP 2.160036.0 DOUBLETREE VAIL, CO CONVERSION GUESTROOMS & PUBLIC SPACES RENOVATION 08/25/16 - CONSTRUCTION DOCUMENTS E403 2211 N FRONTAGE RD, VAIL, COLORADO 81657 SCALE: 1/4" = 1'-0" DRAWING REF: E111 2ALIGHTING PLAN - MEETING ROOMS SCALE: 1/4" = 1'-0" DRAWING REF: E121 4A POWER AND COMMUNICATIONS PLAN - MEETING ROOMS KEYNOTES 26.31 PROVIDE NEW LIGHTING CONTROLS / PANEL EQUAL TO LUTRON GRAFIK EYE QS. 26.33 PROVIDE RECESSED JUNCTION BOXES AND LIGHTING CIRCUIT THRU NEW LIGHTING CONTROLS. INSTALL PENDANT LIGHTING SUPPLIED BY OTHERS AND MAKE ALL FINAL CONNECTIONS. 26.45 CONNECT TO AVAILABLE 20A 1P 120V CIRCUIT MADE AVAILABLE DURING DEMOLITION OR PROVIDE MATCHING AIC 20A 1P CIRCUIT BREAKER IN AVAILABLE SPACE OF EXISTING PANELBOARD AS NEEDED. FIELD VERIFY PANEL DESIGNATIONS AND CIRCUIT AVAILABILITY. 26.53 SAWCUT / TRENCH AND REPAIR FLOOR AS REQUIRED. PROVIDE RECESSED FLOORBOX / POWER AND RECEPTACLES FOR MILLWORK / FURNITURE. COORDINATE FINAL LOCATION WITH ARCHITECTS DRAWINGS. 26.59 PROVIDE POWER TO RECESSED MOTORIZED SCREEN AS ADD / ALTERNATE. 26.105 PROVIDE RECEPTACLE AND DATA OUTLET FOR DIGITAL EVENT READER. EXTEND RECEPTACLE TO NEAREST RECEPTACLE CIRCUIT AND CONNECT. COORDINATE FINAL LOCATION AND REQUIREMENTS WITH APPROVED PROVIDER PRIOR TO ROUGH-IN. 1 8/25/2016 FOR CONSTRUCTION SET 5 12/07/2016 RFI #55 6 1/09/2017 CCD-03 9 7/21/17 CCD-05 07/31/2017 08/14/17