Loading...
HomeMy WebLinkAboutB16-0266_M002_1498075792.pdfELASTOMERIC RUBBER IN SHEAR VIBRATION ISOLATORS (TYP. 4) AIR HANDLER HANGER RODS SECURED TO STRUCTURE HOT WATER PIPING TO BOILER. FLEX CONNECTION RETURN AIR 1-1/2" DEEP 18 GAUGE GALVANIZED AUXILIARY DRAIN PAN SUSPENDED BELOW UNIT. SUPPLY AIR FLEXIBLE P-TRAP CONNECTION DISCHARGE TO PLUMBING DRAIN FILTERS REFRIGERANT PIPING TO CONDENSING UNITS. HOT WATER COIL MECHANICAL DUCTWORK AND PIPE INSULATION SCHEDULE INSULATION ITEMS SYSTEM LOCATION MATERIAL THICK REMARKS -NESS DUCTWORK: DW - DUCTWRAP; FE - FLEXIBLE ELASTOMERIC SUPPLY AIR DUCT ALL INDOOR DW OR FE 2" RETURN AIR DUCT ALL INDOOR DW OR FE 2" HOT WATER SUPPLY AND RETURN PIPING ALL INDOOR FE 1-1/2" AC CONDENSATE ALL INDOOR FE 1" REFRIGERANT SUCTION AND HOT GAS PIPING AND TUBING ALL OUTDOOR FE 2" NOTES: 1. REFER TO PROJECT SPECIFICATION AND/OR SPECIFICATION NOTES ON DRAWINGS FOR PRODUCT MATERIAL INFORMATION, AND INSTALLATION REQUIREMENTS. 2. PAINT INSULATION WITH 2 COATS OF MANUFACTURER'S RECOMMENDED PROTECTIVE COATING. REFRIGERANT SUCTION AND HOT GAS PIPING AND TUBING ALL INDOOR FE 1" SEE NOTE 2 SEE NOTE 2 1 A 2 3 4 5 6 A B C D E 1 3 4 5 6 2 COPYRIGHT 2016 BASKERVILL. USE OF THIS WORK IN WHOLE OR IN PART IS FORBIDDEN WITHOUT EXPRESSED WRITTEN CONSENT. B C D E DRAWING NO. P.O. BOX 400, RICHMOND, VA 23218-0400 DRAWING TITLE ISSUE PROJECT OWNER ® 8/29/2016 4:45:51 PM DETAILS AND SCHEDULES THE WIDEWATERS GROUP 2.160036.0 DOUBLETREE VAIL, CO CONVERSION GUESTROOMS & PUBLIC SPACES RENOVATION 08/25/16 - CONSTRUCTION DOCUMENTS M002 2211 N FRONTAGE RD, VAIL, COLORADO 81657 NOT TO SCALE 3AINSULATION SCHEDULE NOT TO SCALE 3BAIR HANDLER HANGER DETAIL 1 8/25/2016 Revision 1 08/29/2016 06/21/17