HomeMy WebLinkAboutB16-0266_M002_1498075792.pdfELASTOMERIC RUBBER IN SHEAR
VIBRATION ISOLATORS (TYP. 4)
AIR HANDLER
HANGER RODS
SECURED TO
STRUCTURE
HOT WATER PIPING TO
BOILER.
FLEX CONNECTION
RETURN AIR
1-1/2" DEEP 18 GAUGE GALVANIZED
AUXILIARY DRAIN PAN SUSPENDED
BELOW UNIT.
SUPPLY AIR
FLEXIBLE
P-TRAP
CONNECTION
DISCHARGE TO PLUMBING DRAIN
FILTERS
REFRIGERANT PIPING TO
CONDENSING UNITS.
HOT WATER COIL
MECHANICAL DUCTWORK AND PIPE INSULATION SCHEDULE
INSULATION
ITEMS SYSTEM LOCATION MATERIAL THICK REMARKS
-NESS
DUCTWORK: DW - DUCTWRAP; FE - FLEXIBLE ELASTOMERIC
SUPPLY AIR DUCT ALL INDOOR DW OR FE 2"
RETURN AIR DUCT ALL INDOOR DW OR FE 2"
HOT WATER SUPPLY AND RETURN PIPING ALL INDOOR FE 1-1/2"
AC CONDENSATE ALL INDOOR FE 1"
REFRIGERANT SUCTION AND HOT GAS PIPING AND TUBING ALL OUTDOOR FE 2"
NOTES:
1. REFER TO PROJECT SPECIFICATION AND/OR SPECIFICATION NOTES ON DRAWINGS FOR PRODUCT MATERIAL INFORMATION, AND INSTALLATION REQUIREMENTS.
2. PAINT INSULATION WITH 2 COATS OF MANUFACTURER'S RECOMMENDED PROTECTIVE COATING.
REFRIGERANT SUCTION AND HOT GAS PIPING AND TUBING ALL INDOOR FE 1" SEE NOTE 2
SEE NOTE 2
1 A 2 3 4 5 6 A B C D E
1
3 4 5 6 2
COPYRIGHT 2016 BASKERVILL. USE OF THIS WORK IN WHOLE OR IN
PART IS FORBIDDEN WITHOUT EXPRESSED WRITTEN CONSENT.
B C D E
DRAWING
NO.
P.O. BOX 400, RICHMOND, VA 23218-0400
DRAWING TITLE
ISSUE
PROJECT
OWNER
®
8/29/2016
4:45:51 PM
DETAILS AND
SCHEDULES
THE WIDEWATERS
GROUP
2.160036.0
DOUBLETREE VAIL,
CO CONVERSION
GUESTROOMS &
PUBLIC SPACES
RENOVATION
08/25/16 -
CONSTRUCTION
DOCUMENTS
M002
2211 N FRONTAGE
RD, VAIL, COLORADO
81657
NOT TO SCALE 3AINSULATION SCHEDULE
NOT TO SCALE
3BAIR HANDLER HANGER DETAIL
1 8/25/2016 Revision 1
08/29/2016
06/21/17