Loading...
HomeMy WebLinkAboutB16-0266_M101_1502723397.pdfF G H J K L M N O M1 23.1 23.2 23.3 23.4 23.5 23.9 23.10 23.12 DEMOLISH EXISTING TRANSFER DUCT (NOT SHOWN, VERIFY LOCATION IN FIELD) BETWEEN 115/116 ELECTRICAL ROOM AND 114 EXIT STAIRS. SEAL ANY WALL PENETRATIONS. 1 A 2 3 4 5 6 A B C D E 1 3 4 5 6 2 COPYRIGHT 2016 BASKERVILL. USE OF THIS WORK IN WHOLE OR IN PART IS FORBIDDEN WITHOUT EXPRESSED WRITTEN CONSENT. B C D E DRAWING NO. P.O. BOX 400, RICHMOND, VA 23218-0400 DRAWING TITLE ISSUE PROJECT OWNER ® 7/18/2017 1:18:21 PM 1ST FLOOR DEMOLITION THE WIDEWATERS GROUP 2.160036.0 DOUBLETREE VAIL, CO CONVERSION GUESTROOMS & PUBLIC SPACES RENOVATION 08/25/16 - CONSTRUCTION DOCUMENTS M101 2211 N FRONTAGE RD, VAIL, COLORADO 81657 SCALE: 1/8" = 1'-0" DRAWING REF: E401a 6ADEMOLITION PLAN -1ST FLOOR 23.1 DISCONNECT SPLIT SYSTEMS AND TURN OVER UNITS, ACCESSORIES, AND CONTROLS TO OWNER. TYPICAL OF 3 INDOOR UNITS AND 3 OUTDOOR UNITS. 23.2 EQUIPMENT IN MECHANICAL ROOM TO REMAIN. KEEP EXISTING DUCTWORK, PIPING, AND CONTROLS IN PLACE EXCEPT WHERE OTHERWISE NOTED. 23.3 DEMOLISH THE INDICATED EXHAUST FAN (TAG EF-2, SERVING EXISTING BATHROOMS WITH 10" DIA. DUCTWORK PER THE 2003 MECHANICAL DRAWINGS). TURN OVER FAN TO OWNER. 23.4 REMOVE WALL MOUNTED ELECTRIC HEATER AND TURN OVER TO OWNER. 23.5 DEMOLISH ALL DUCTWORK FOR BOTH AIR HANDLER UNITS LOCATED ABOVE THE VESTIBULE. 23.9 DEMOLISH HEATING AND VENTILATION DUCTWORK SERVING THE FORMER HOT TUB AREA BACK TO THE INDICATED DUCT ELBOW. 23.10 DEMOLISH EXISTING EXHAUST AND RELIEF DUCTWORK SERVING THE FORMER HOT TUB AREA BACK TO THE INLET OF THE INDICATED FAN. 23.12 DEMOLISH INDICATED AIR HANDLING UNIT AND ALL ATTACHED DUCT AND PIPING. KEY NOTES NOT IN SCOPE OF DEMOLITION 1. UNLESS SPECIFICALLY NOTED, REMOVE ALL HVAC DISTRIBUTION SYSTEMS IN THEIR ENTIRETY. THIS INCLUDES BUT IS NOT LIMITED TO EQUIPMENT (WHERE INDICATED), DUCTWORK, PIPING, AIR DEVICES, AND ALL ASSOCIATED COMPONENTS AND SUPPORTS. PATCH AND REPAIR ALL AREAS THAT ARE TO REMAIN WHERE ITEMS WERE ATTACHED OR SUPPORTED. 2. COORDINATE EXTENT OF DEMOLITION WITH NEW WORK IN ALL LOCATIONS WHERE MECHANICAL COMPONENTS ARE TO REMAIN. 3. REMOVE THE TEMPERATURE CONTROLS SYSTEM COMPONENTS ASSOCATIED WITH ANY REMOVED EQUIPMENT. THIS INCLUDES BUT IS NOT LIMITED TO CONTROL PANELS, PANEL POWER FEEDS, DISTRIBUTION PANELS, CONTROL WIRING, AND ROOM THERMOSTATS. WHERE DAMPERS AND VALVES ARE TO REMAIN, THEIR RESPECTIVE ACTUATORS ARE TO REMAIN. 4. CONTRACTOR TO REMOVE ANY MECHANICAL COMPONENTS WITHIN WALLS INDICATED TO BE DEMOLISHED ON ARCHITECTURAL DEMOLITION PLANS. 5. PROTECT ALL EQUIPMENT TO REMAIN FROM DAMAGE DURING DEMOLITION. PROVIDE TEMPORARY COVERS AND CAP ENDS OF ALL PIPING AND DUCTWORK AT COMPLETION OF PARTIAL DEMOLITION. 6. COORDINATE WITH ELECTRICAL DEMOLITION BEFORE REMOVING DUCTWORK CONTAINING SMOKE DETECTORS OR EQUIPMENT, DEVICES AND SYSTEMS HAVING ELECTRICAL CONNECTIONS. GENERAL DEMOLITION NOTES 1 8/25/2016 FOR CONSTRUCTION SET 9 7/21/17 CCD-05 07/31/2017 08/14/17