Loading...
HomeMy WebLinkAboutB16-0266_M701_1478900265.pdfGENERAL WHEN THE UNIT IS NOT SUPPLYING AIR, THE UNIT ISOLATION DAMPERS SHALL BE CLOSED. THE SEQUENCE DESCRIBED BELOW CONSISTS OF TWO MODES: SHUTDOWN AND OCCUPIED COOLING OR HEATING. SHUTDOWN MODE IS INTENDED TO DESCRIBE STOPPING RTU FANS IN AN ORDERLY MANNER, CLOSING DAMPERS AND INDICATE SHUTDOWN INFORMATION AT THE CONTROLLER. OCCUPIED COOLING OR HEATING MODE IS DETERMINED BASED ON THE OCCUPANCY SCHEDULE AND ADJUSTED BY THE OPTIMAL START PROGRAM FROM THE CONTROLLER. INITIAL OCCUPANCY SCHEDULE SHALL BE RUNNING 24 HOURS PER DAY. SHUTDOWN MODE: WHEN THE RTU IS INDEXED FOR SHUTDOWN MODE, THE UNITS SUPPLY AND EXHAUST FANS SHALL STOP. THE RTU EXHAUST AIR DAMPER SHALL OPEN FULLY, RELIEF AIR, OUTSIDE AIR AND ISOLATION DAMPERS SHALL CLOSE. COOLING AND HEATING SHALL BE DISABLED DURING SHUTDOWN. THE SYSTEM SHALL BE INDEXED TO SHUTDOWN MODE IF ANY ONE OR MORE OF THE FOLLOWING CONDITIONS ARE MET: ● A SHUTDOWN SIGNAL FROM THE CONTROLLER CONSOLE. ● AN ALARM CONDITION FROM THE RTU SUPPLY AND EXHAUST DUCT SMOKE DETECTOR. ● UPON ALARM CONDITION FROM THE RTU FREEZESTAT. OCCUPIED MODE: HEATING OR COOLING: ● AT THE PREDETERMINED OPTIMUM START TIME, AS DETERMINED BY THE OCCUPANCY SCHEDULE, THE RTU WILL BE ENABLED. ● THE BAS SHALL NEXT COMMAND THE RTU TO RUN AND OPEN THE ISOLATION DAMPERS. ● SPACE TEMPERATURE AND HUMIDITY SETPOINTS SHALL BE LOCATED IN TWO FLOORS IN THE CORRIDORS. TEMPERATURE AND HUMIDITY SHALL BE "WORST CASE" SELECTED AS THE CRITICAL CONTROL POINT. ● WITH BOTH FANS RUNNING, THE OVERALL AIRFLOWS AT CONSTANT VOLUME SHALL PROVIDE POSITIVE PRESSURE TO THE BUILDING. A BUILDING PRESSURE SENSOR SHALL BE PROVIDED AS AN AUXILIARY INPUT TO EACH UNIT. THE SENSOR SHALL MEASURE FROM AN UPPER LEVEL CORRIDOR TO OUTSIDE AMBIENT TO ENSURE A POSITIVE READING. EACH UNIT'S CONTROLLER SHALL THEN INDICATE WITH A DIGITAL INDICATION, WHETHER OR NOT THE ASSOCIATED SENSOR IS POSITIVE OR NEGATIVE. ● (MECHANICAL COOLING) ON A RISE IN SPACE AIR TEMPERATURE ABOVE SETPOINT AND THE HEATING COIL IS DISABLED, COOLING SHALL BE STAGED TO MAINTAIN TEMPERATURE SETPOINT (ADJ, INITIAL SETPOINT 74 F RESET THE SPACE TEMPERATURE SET POINT TO 70 F WHENEVER OAT < 35 F, BOTH ADJ.). ● ON A FALL BELOW SPACE AIR TEMPERATURE SETPOINT, AND COOLING IS DISABLED, THE ELECTRIC HEATING COIL SHALL MODULATE (SCR CONTROL) TO MAINTAIN SPACE TEMPERATURE SETPOINT. ● HIGH HUMIDITY DISCHARGE CONTROL SHALL BE ACCOMPLISHED VIA THE SPACE HUMIDITY SENSOR TO MAINTAIN A MAXIMUM HUMIDITY OF 55 PERCENT (ADJ.) AND ACCOMPLISHED BY COOLING AND HOT GAS REHEAT. SMOKE SHUTDOWN: IN THE EVENT THAT SMOKE IS PRESENT IN THE RTU EXHAUST OR SUPPLY AIR DUCT: ● AN AUXILIARY CONTACT IN THE EXHAUST OR SUPPLY AIR DUCT SMOKE DETECTOR SHALL OPEN DE-ENERGIZING THE AUTO-MAINTAINED POWER SUPPLY TO THE FAN'S STARTER OR AFD OF THE RTU CAUSING THE FANS TO SHUT OFF. ● THE BAS SHALL SHUT DOWN THE EXHAUST AIR FANS UPON SHUTDOWN OF THE SUPPLY AIR FANS IN THE UNIT. ● SMOKE DETECTOR CONTACTS SHALL BE WIRED IN SERIES IN THE FAN MOTOR STARTER CIRCUIT. ● THE MECHANICAL CONTRACTOR SHALL PROVIDE AND TERMINATE THE HARD-WIRED CONNECTIONS FROM ANY DETECTOR RELAY (PROVIDED BY FIRE ALARM CONTRACTOR AND INSTALLED BY MECHANICAL CONTRACTOR) TO THE ASSOCIATED FAN TO BE SHUT DOWN, UNLESS OTHERWISE COORDINATED WITH THE UNIT MANUFACTURER. ● DURING MORNING COOL DOWN THE CHW VALVE SHALL MODULATE OPEN OR CLOSED TO MAINTAIN DISCHARGE AIR TEMPERATURE AT DISCHARGE TEMPERATURE SETPOINT (ADJUSTABLE, STARTUP SETPOINT 58 F). THE AHU CONTROLLER SHALL RESET THE SUPPLY AIR TEMPERATURE SETPOINT 1 F COLDER EVERY 10 MINUTES (ADJUSTABLE) UNTIL THE SUPPLY TEMPERATURE IS AT THE OPERATING SETPOINT TEMPERATURE (ADJUSTABLE, INITIAL SETPOINT 55 F). IF THE RETURN AIR RELATIVE HUMIDITY RISES ABOVE 50%, THE 10 MINUTE CYCLE SHALL REPEAT AT THE SAME TEMPERATURE. ● DURING MORNING WARM-UP THE BAS SHALL MODULATE THE PREHEAT COIL VALVE TO ACHIEVE DISCHARGE SETPOINT. AFTER THAT DISCHARGE SETPOINT IS ACHIEVED AND RETURN AIR FROM THE TERMINAL ZONES REACHES THE PREDETERMINED ROOM SETPOINT (68° F, ADJ), THE BAS SHALL COMMAND THE TWO-POSITION, MINIMUM OA DAMPER OPEN. GENERAL NOTE: 1.) TERMINAL UNIT LOOP BRANCH PUMP/LOOP SHALL BE ENABLED WHEN BOILER LOOP IS ENABLED AND RUNNING. HOT WATER PUMP: 1.) THE HOT WATER LOOP CONSISTS OF A CONSTANT VOLUME DEDICATED PUMP THAT SHALL INCORPORATE THREE-WAY MIXING VALVES AT THE TERMINAL UNIT HOT WATER COILS TO MAINTAIN FLOW AND DISCHARGE TEMPERATURE. 2.) WHEN ENABLED, THE PUMP SHALL RUN CONTINUOUSLY. 3.) THE THREE-WAY MIXING VALVES SHALL BE CONTROLLED TO MAINTAIN SPACE TEMPERATURE PER ZONE THROUGH THE TERMINAL UNIT CONTROLLER. VALVES SHALL BE SIZED TO ALLOW CONSTANT FLOW AT THE PUMP. ● INSULATION SHALL HAVE COMPOSITE FIRE AND SMOKE HAZARD RATINGS OF INSULATION AND JACKET OR FACING AND ADHESIVE USED TO ADHERE JACKET OR FACING TO THE INSULATION AS TESTED BY PROCEDURE ASTM E-84 NOT EXCEEDING 25 FOR FLAME SPREAD OR 50 FOR SMOKE DEVELOPMENT. ACCESSORIES, SUCH AS ADHESIVES, MASTICS, CERAMICS, TAPES AND NON-ABESTOS MINERAL FIBER CLOTH FOR FITTINGS SHALL HAVE THE SAME COMPONENT RATINGS. DUCTWORK AND ACCESSORIES: ● FABRICATE DUCTWORK AND FITTINGS ACCORDING TO SMACNA'S “HVAC DUCT CONTRUCTION STANDARDS-METAL AND FLEXIBLE” COMPLY WITH REQUIREMENTS FOR METAL THICKNESS, REINFORCING TYPES AND INTERVALS, TIE-ROD APPLICATIONS AND JOINT TYPES AND INTERVALS. ● GALVANIZED SHEET STEEL: LOCK-FORMING QUALITY; ASTM A653/ A65F3M, G90 COATING DESIGNATION; PROVIDE MILL-PHOSPHATIZED FINISH FOR SURFACES OF DUCTS EXPOSED TO VIEW. ● CLEANESS OF DUCTWORK SHALL BE IN ACCORDANCE WITH SMACNA DUCT CLEANLINESS GUIDELINE. ALL DUCT TRANSVERSE JOINTS IN RECTANGULAR DUCTS, ALL FINAL CONNECTIONS TO NEW AND EXISTING DUCT, AND ALL FINAL CONNECTIONS TO AIR DEVICES SHALL BE SEALED WITH DUCT SEALER, EXCEPT FOR GASKET TYPE JOINTS. PRESSURE SENSITIVE TAPE SHALL NOT BE USED AS THE PRIMARY SEALANT. DUCTWORK SHALL BE TESTED FOR LEAKAGE AND ALL HAND FELT AND AUDIBLE LEAKS SHALL BE SEALED BEFORE EXTERNAL INSULATION IS APPLIED TO DUCTWORK. SEAL ALL DUCT TRANSVERSE JOINTS, LONGITUDINAL SEAMS THROUGHOUT THE ENTIRE EXISTING SUPPLY, RETURN AND EXHAUST DUCT SYSTEMS. ● WHERE DUCTS ARE INSULATED, ALL QUADRANTS, CONTROLS, INDICATING INSTRUMENTS. ETC. SHALL BE PROVIDED WITH EXTENDED SHAFTS AND/OR BRACKETS THAT WILL PERMIT SUCH EQUIPMENT TO BE MOUNTED ON THE SURFACE OF THE INSULATION. PROVIDE ALL OPENINGS REQUIRED FOR PITOT TUBES AND EQUIP EACH WITH NEAT, REMOVABLE PLUGS OR CAPS FURNISHED UNDER THIS WORK. ● INSTALL FIRE-RATED ACCESS PANEL ASSEMBLIES AT EACH CHANGE IN DIRECTION AND AT MAXIMUM INTERVALS OF 12 FEET IN HORIZONTAL DUCTS. LOCATE ACCESS PANEL ON TOP OR SIDES OF DUCT A MINIMUM OF 1-1/2 INCHES FROM BOTTOM OF DUCT. ● HANGERS AND INSULATED, SUPPLY AIR DUCTWORK SHALL BE COATED WITH VAPOR BARRIER MASTIC TO PREVENT SWEATING. ● FLEXIBLE ROUND DUCT SHALL BE INSULATED FLEX-VENT KM OR EQUAL. FLEXIBLE DUCT RUNOUTS TO DIFFUSERS SHALL BE FACTORY-INSULATED FLEXIBLE DUCT. SEE LATEST VERSION OF “SMACNA FOR FLEXIBLE CONNECTION INSTALLATION REQUIREMENTS”. FLEXIBLE ROUND DUCT SHALL NOT BE OVER 5 FT. IN LENGTH UNLESS NOTED OTHERWISE AND SHALL NOT PENETRATE FIRE RESISTANCE RATED ASSEMBLIES NOR SHALL IT PASS THROUGH FLOORS WALLS OR CEILINGS. FLEXIBLE CONNECTIONS SHALL BE INSTALLED SO THERE ARE NO KINKS. SPIN-IN FITTINGS SHALL BE USED TO CONNECT SUCH FLEXIBLE ROUND DUCTS TO RECTANGULAR DUCTS. ● SPIN-IN FITTINGS WITH AIR SCOOP AND DAMPER SHALL BE USED TO CONNECT SUCH FLEXIBLE ROUND DUCTS TO RECTANGULAR DUCTS. SPIN-IN FITTINGS SHALL BE THERMAFLEX TYPE SI, WITH DAMPER AND 45 DEG. EXTRACTOR. ● PROVIDE TEMPORARY CLOSURES OF METAL OR TAPED POLYETHYLENE ON OPEN DUCTWORK DURING CONSTRUCTION TO PREVENT DUST AND DEBRIS FROM ENTERING DUCTWORK SYSTEM. ● CONTRACTOR SHALL SEAL OR RE-SEAL ALL OPENINGS AND / OR DUCT PENETRATIONS THROUGH FLOORS AND PARTITIONS, INCLUDING BOTH RATED AND NON-RATED, IN ACCORDANCE WITH ALL APPLICABLE CODES AND ORDINANCES. ● CONSTRUCT DUCTS TO THE FOLLOWING AS A MINIMUM: CONSTANT VOLUME SUPPLY DUCTS: +2” W.G., VARIABLE VOLUME SUPPLY DUCTS: +3” W.G., +2" W.G. DOWNSTREAM OF A TERMINAL UNIT, RETURN AND EXHAUST DUCTS: -1" W.G. ● VOLUME DAMPERS SHALL BE FACTORY FABRICATED WITH REQUIRED HARDWARE AND ACCESSORIES, STIFFEN DAMPER BLADES FOR STABILITY. INCLUDE LOCKING DEVICE TO HOLD SINGLE-BLADE DAMPERS IN A FIXED POSITION WITHOUT VIBRATION. CLOSE DUCT PENETRATIONS FOR DAMPER COMPONENTS TO SEAL DUCT CONSISTENT WITH PRESSURE CLASS. VOLUME DAMPERS SHALL BE EQUAL TO VENTLOK. ● INSTALL VOLUME AND SPLITTER DAMPERS AS SHOWN ON DRAWINGS, ALSO ADD DAMPERS WHERE REQUIRED FOR PROPER AIR BALANCING OF DUCTWORK SYSTEM. DAMPERS SHALL NOT BE ARRANGED SO AS TO CAUSE OBJECTIONABLE NOISE AS DETERMINED AND ACCEPTED BY THE OWNER. SHOULD THE CONTRACTOR DEEM IT NECESSARY TO PROVIDE ADDITIONAL DAMPERS IN THE SYSTEM THE CONTRACTOR SHALL ADVISE THE ENGINEER IN WRITING BEFORE PROCEEDING. ● STAINLESS STEEL: ASTM A480/ A480M, TYPE 316, SHEET FORM WITH NO.4 FINISH FOR SURFACES OF DUCTS EXPOSED TO VIEW; AND TYPE 304, SHEET FORM WITH NO. 1 FINISH FOR CONCEALED DUCTS. ● PROVIDE HANGERS AS ELECTROGALVANIZED, ALL-THREAD ROD OR GALVANIZED RODS WITH THREADS PAINTED AFTER INSTALLATION WHEN INSTALLED IN CORROSIVE ATMOSPHERES. ● STRAPS AND RODS SHALL COMPLY WITH SMACNA'S “HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE” FOR SHEET STEEL WIDTH AND THICKNESS AND FOR STEEL ROD DIAMETERS. HANGER DUCT ATTACHMENTS SHALL BE SHEET METAL SCREWS, BLIND RIVETS, OR SELF-TAPPING METAL SCREWS, COMPATIBLE WITH DUCT MATERIALS. TRAPEZE AND RISER SUPPORTS SHALL COMPLY WITH ASTM A 36/A 36M. DUCTWORK INSULATION: ● INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE -DEVELOPED RATING OF NOT MORE THAN 50 BASED ON ASTM E-84 TUNNEL TEST. ACCESSORIES SUCH AS ADHESIVES, MASTICS, CEMENTS, TAPES, AND CLOTH SHALL HAVE THE SAME RATING AS LISTED ABOVE AND SHALL HAVE ZERO VOC CONTENT. ● ALL EXTERNAL INSULATION SHALL BE 2", 1.5 LB/CU .FT. DENSITY, MINERAL FIBER BLANKET DUCT INSULATION W/ FOIL/KRAFT VAPOR BARRIER. EXTERNALLY INSULATE SUPPLY, RETURN, AND OUTDOOR AIR DUCTS WHICH ARE NOT SOUND LINED. ● MINERAL-FIBER BLANKET THERMAL INSULATION: GLASS FIBERS BONDED WITH A THERMOSETTING RESIN. COMPLY WITH ASTM C553, TYPE II, WITHOUT FACING AND WITH FSK JACKET MANUFACTURED FROM KRAFT PAPER, REINFORCING SCRIM, ALUMINUM FOIL, AND VINYL FILM. THIS WORK INCLUDES LABOR, MATERIALS, EQUIPMENT, AND SERVICES FOR THE INSTALLATION OF MECHANICAL SYSTEMS AS SHOWN ON THE HVAC DRAWINGS AND AS SPECIFIED HEREINAFTER. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE CODES AND STANDARDS INCLUDING BUT NOT LIMITED TO: ● 2012 VIRGINIA UNIFORM STATEWIDE BUILDING CODE ● 2012 INTERNATIONAL BUILDING CODE ● 2012 INTERNATIONAL MECHANICAL CODE ● 2012 INTERNATIONAL FUEL GAS CODE ● 2012 INTERNATIONAL ENERGY CONSERVATION CODE ● LATEST SMACNA STANDARDS CONTRACTOR SHALL OBTAIN AND PAY FOR ALL NECESSARY PERMITS AND SHALL ARRANGE FOR ALL INSPECTIONS AS REQUIRED. THE FOLLOWING NOTES ARE GENERAL IN NATURE AND PERTAIN TO THE ENTIRE PROJECT. WHERE THERE ARE EXCEPTIONS, ADDITIONS, OR REVISIONS TO THESE NOTES, SUCH EXCEPTIONS, ADDITIONS OR REVISIONS ARE SO NOTED ON THE PARTICULAR DRAWING WHERE THEY OCCUR. ABBREVIATIONS & SYMBOLS ON THIS SET ARE COMPREHENSIVE LISTS AND ARE NOT NECESSARILY ALL UTILIZED FOR THIS PROJECT. THE DRAWINGS ARE DIAGRAMMATIC AND SHOULD NOT BE SCALED TO ESTABLISH LOCATION OF WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND MAKE ADJUSTMENTS AS NECESSARY TO COMPLETE THE WORK. VERIFY EXISTING CONDITIONS BEFORE FABRICATION OF DUCTWORK OR OTHER NEW WORK. THESE PLANS ARE INTENDING TO SHOW GENERAL RUNS AND LOCATIONS OF DUCTWORK, EQUIPMENT AND SPECIALITIES, AND DO NOT NECESSARILY SHOW ALL REQUIRED OFFSETS AND DETAILS. WORK SHALL BE ACCURATELY LAID OUT WITH REFERENCE TO THE ARCHITECTURAL DRAWINGS AND IN COOPERATION WITH INSTALLATION, WHICH WILL AFFORD MAXIMUM ACCESSIBILITY FOR OPERATION, MAINTENANCE AND HEADROOM, FAILURE TO COORDINATE WORK WITH OTHER TRADES SHALL NOT BE CONSIDERED AS A BASIS FOR EXTRA COST CHANGES. THE CONTRACTOR SHALL FULLY COORDINATE ALL WORK WITH OTHER TRADES TO ASSURE ALL WORK CAN BE PROPERLY INSTALLED WITHOUT INTERFERENCE OR DELAY. PROTECT THE PRESENT BUILDING AND ITS APPURTENANCES FROM DAMAGE, WHICH MIGHT BE DONE OR CAUSED BY THE WORK PERFORMED. MECHANICAL CONTRACTOR SHALL INSTALL TEMPORARY FILTERS ON HVAC EQUIPMENT FOR USE DURING CONSTRUCTION AND SHALL REPLACE WITH PLEATED HIGH EFFICIENCY FILTERS AFTER COMPLETION OF WORK. REPAIR BY APPROVED METHODS ANY SUCH DAMAGE WITH OCCURS TO RESTORE DAMAGED AREAS TO THEIR ORIGINAL CONDITION. PROVIDE A FLANGED AND GASKETED "AIR-TIGHT" FITTING WITH VOLUME DAMPER AT EACH CONNECTION BETWEEN MAIN DUCT AND BRANCH DUCT. SECURE FITTING TO MAIN DUCTWORK USING SELF-ADHESIVE GASKET AND SHEET METAL SCREWS. A FACTORY-FABRICATED OVAL FITTING OF EQUIVALENT FREE AREA SHALL BE USED WHERE THE DEPTH OF THE TAPPED DUCTWORK IS LESS THAN THE TAP DIAMETER . VERIFY EXISTING DUCTWORK REUSED IS AIRTIGHT. SEAL ANY OPENINGS NOT REUSED AND ANY LEAKS AIRTIGHT, SAME AS NEW. DUCT SIZES SHOWN ON DRAWINGS ARE IN INCHES AND REPRESENT THE FREE OR UNOBSTRUCTED AREA REQUIRED ON THE INSIDE OF THE DUCT. ALL DUCT RUN-OUTS TO DIFFUSERS SHALL BE THE SAME SIZE AS THE DIFFUSER NECK UNLESS OTHERWISE NOTED. ALL DUCTWORK AND PIPING SHALL RUN AS HIGH AS POSSIBLE, UNLESS OTHERWISE NOTED. ALL EQUIPMENT INSTALLED IN THE CEILING PLENUM SHALL HAVE MAXIMUM FLAME SPREAD/SMOKE DEVELOPED RATING OF 25/50 IN ACCORDANCE WITH ASTM E84. THE CONTRACTOR SHALL NOT CORE DRILL CONCRETE SLABS WITHOUT THE KNOWLEDGE AND WRITTEN CONSENT OF THE STRUCTURAL ENGINEER AND THE BUILDING OWNER. CONTRACTOR TO RADIOGRAPH PROBABLE CORE DRILL LOCATIONS TO PREVENT CUTTING CONCEALED RE-BARS AND/OR CONDUIT IN CONCRETE MASS. ALL SPECIFIED EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. PROVIDE ONE-YEAR WARRANTY FOR ALL WORKMANSHIP AND MATERIALS AFTER THE DATE OF FINAL ACCEPTANCE. SUBMITTALS: ● 1/4" SCALE COORDINATED SHEET METAL FABRICATION SHOP DRAWINGS (COORDINATED WITH STRUCTURAL/ARCHITECTURAL CEILING HEIGHTS/LIGHTING AND PIPING). ● 1/4" COORDINATION CHANGES SUPERIMPOSING MECHANICAL, PLUMBING, ELECTRICAL AND OTHER TRADES. ● SHOP DRAWINGS FOR EQUIPMENT ● AIR BALANCE REPORT ● AS BUILT DRAWINGS - DIGITALLY SUBMITTED. ● 1 SET OF O & M MANUALS ON CD. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL HAVE ALL AIR SYSTEMS BALANCED TO INDICATED AIR FLOW QUANTITIES BY A CERTIFIED "AABC" OR "NEBB" BALANCING CONTRACTOR. BALANCING SHALL BE IN ACCORDANCE WITH NEBB'S LATEST EDITION OF “PROCEDURAL STANDARDS FOR TESTING, ADJUSTING AND BALANCING OF ENVIRONMENTAL SYSTEMS" INCLUDE ADJUSTING THE FAN SPEEDS OF AIR CONDITIONING UNITS AS NECESSARY TO ACHIEVE THE INDICATED AIR FLOW. BALANCING REPORT SHALL INCLUDE: INLET SIZE, MANUFACTURER NAME AND MODEL NO. OF THE EQUIPMENT. IF THE SUPPLY AIR IS LESS THAN 10% OF THE DESIGN CFM, THEN STATIC PRESSURE READINGS ARE REQUIRED AT THE DUCT TRAVERSES. MECHANICAL CONTRACTOR SHALL VERIFY THAT EVERY THERMOSTAT IS CONNECTED TO ITS DEDICATED EQUIPMENT AND ALL CONTROLS ARE FULLY OPERATIONAL. UNLESS OTHERWISE NOTED ALL EQUIPMENT MATERIAL AND OTHER SPECIFICATIONS SHALL MATCH WITH BASE BUILDING. COORDINATE DIFFUSER LOCATIONS WITH REFLECTED CEILING AND LIGHTING PLAN. ALL DUCTWORK AND PIPING SHALL CONNECT TO EQUIPMENT WITH FLEXIBLE CONNECTIONS. COORDINATE FRAMING OF SLAB TO SLAB PARTITIONS WITH EXISTING DUCTWORK. FRAMING SHALL NOT BE ATTACHED TO DUCTWORK. SEAL AROUND ALL PENETRATIONS THROUGH FIRE RATED FLOORS AND WALLS WITH UL LISTED FIRESTOP ASSEMBLIES. SUPPLY AND INSTALL TEMPORARY FILTERS IN ALL AC UNITS. REPLACE TEMPORARY FILTERS WITH FINAL FILTERS UPON COMPLETION OF CONSTRUCTION AND BEFORE COMMISSIONING. SUPPLY AND INSTALL VIBRATION ISOLATION HANGERS FOR ALL EQUIPMENT SUSPENDED FROM STRUCTURE. ALL ACOUSTICAL DUCT LINER SHALL BE EPOXY, ACRYLIC OR MYLAR COATED. VERIFY AND REPAIR ANY INSULATION DAMAGED AS A PART OF THIS WORK. DUCT LINER SHALL NOT BE USED FOR THERMAL INSULATION. ALL THERMOSTAT SHALL BE INSTALLED 4'-0" A.F.F. TO TOP OF DEVICE UNLESS OTHERWISE NOTED. THERMOSTATS AND TEMPERATURE SENSORS LOCATED ON PERIMETER WALLS/COLUMNS SHALL BE PROVIDED WITH INSULATED SUB-BASES. WHERE INSULATED DUCTS PENETRATE WALLS, CONTINUE THE INSULATION UNINTERRUPTED THROUGH THE WALL PENETRATIONS, EXCEPT IN CASES OF RATED WALLS. PROVIDE AUTOMATIC AIR VENTS AT ALL PIPING HIGH POINTS. INSTALL LINE SIZE VALVES AND PIPING ACCESSORIES, EXCEPT FOR MODULATING CONTROL VALVES WHICH SHALL BE SIZED FOR A 3-5 PSI PRESSURE DROP AT RATED FLOW RATE OF CONTROLLED DEVICES. MOTORIZED DAMPERS THAT ARE INTERLOCKED VIA DAMPER END SWITCHES WITH FANS OR OTHER EQUIPMENT ARE TO OPEN PRIOR TO START-UP OF ASSOCIATED FANS OR EQUIPMENT. LEAVE UNPAINTED BUT CLEAN NAMEPLATES BEARING DESCRIPTIVE DATA AND NON-FERROUS SURFACES OF MATERIALS AND EQUIPMENT. MECHANICAL CONTRACTOR SHALL PROVIDE A DURABLE LABEL ON NEW EQUIPMENT IDENTIFYING THE UNIT NUMBER AND AREA THE EQUIPMENT SERVES. USE PRECAUTIONS TO PREVENT FOREIGN MATTER FROM GETTING INTO DUCTWORK AND EQUIPMENT DURING CONSTRUCTION. THE SURFACES OF EQUIPMENT SHALL BE CLEAN UPON COMPLETION OF THE JOB. DEMOLITION: DISCONNECT, DEMOLISH, AND REMOVE MECHANICAL SYSTEMS, EQUIPMENT, AND COMPONENTS INDICATED TO BE REMOVED. PIPING TO BE REMOVED: REMOVE PORTION OF PIPING INDICATED TO BE REMOVED AND CAP OR PLUG REMAINING PIPING WITH SAME OR COMPATIBLE PIPING MATERIAL. PIPING TO BE ABANDONED IN PLACE: DRAIN PIPING AND CAP OR PLUG PIPING WITH SAME OR COMPATIBLE PIPING MATERIAL. DUCTS TO BE REMOVED: REMOVE PORTION OF DUCTS INDICATED TO BE REMOVED AND CAP REMAINING DUCTS WITH SAME OR COMPATIBLE DUCTWORK MATERIAL. DUCTS TO BE ABANDONED IN PLACE: CAP DUCTS WITH SAME OR COMPATIBLE DUCTWORK MATERIAL. EQUIPMENT TO BE REMOVED: DISCONNECT AND CAP SERVICES AND REMOVE EQUIPMENT. EQUIPMENT TO BE REMOVED AND REINSTALLED: DISCONNECT AND CAP SERVICES AND REMOVE, CLEAN, AND STORE EQUIPMENT; WHEN APPROPRIATE, REINSTALL, RECONNECT, AND MAKE EQUIPMENT OPERATIONAL. EQUIPMENT TO BE REMOVED AND SALVAGED: DISCONNECT AND CAP SERVICES AND REMOVE EQUIPMENT AND DELIVER TO OWNER. IF PIPE, INSULATION, OR EQUIPMENT TO REMAIN IS DAMAGED IN APPEARANCE OR IS UNSERVICEABLE, REMOVE DAMAGED OR UNSERVICEABLE PORTIONS AND REPLACE WITH NEW PRODUCTS OF EQUAL CAPACITY AND QUALITY. BEFORE BIDDING THE CONTRACTOR SHALL EXAMINE THE SITE AND ACQUAINT HIMSELF WITH ALL ITEMS TO BE ALTERED OR REMOVED, AS NO EXTRA CHARGE WILL BE ALLOWED FOR THE ALTERING OR REMOVAL OF PRESENT WORK. TOUCH UP WHERE NECESSARY TO REPAIR SCARS AND SCRATCHES IN PAINTED EQUIPMENT AND MATERIALS PROVIDED UNDER THIS WORK. PIPE, FITTINGS, VALVES & ACCESSORIES: ● CONDENSATE DRAIN LINES: TYPE L DRAWN-TEMPER COPPER TUBING WITH SOLDERED JOINTS OR SCHEDULE 40 PVC PIPE WITH SOLVENT-WELDED JOINTS SUITABLE FOR RETURN AIR CEILING RATINGS. ● PIPE HANGERS SHALL CONFORM TO MANUFACTURES RECOMMENDATIONS AND IN ACCORDANCE WITH INDUSTRY STANDARDS PER LATEST ADDITION OF SMACNA. PIPE HANGERS SHALL BE EQUAL TO PRODUCTS OF MICHIGAN PIPE HANGERS, INC. HANGERS SHALL BE INSTALLED WITHIN 2' OF EACH CHANGE IN DIRECTION. DUCTWORK SHALL BE SUPPORTED BY MEANS OF PHILLIPS RED HEAD SELF- DRILLING ANCHORS. ● PROVIDE PIPE HANGER AND SUPPORT INSTALLATION TO COMPLY WITH STANDARDS MSS SP- 58, 69 AND 89. INSTALL HANGERS, SUPPORTS, CLAMPS, AND ATTACHMENTS AS REQUIRED TO PROPERLY SUPPORT PIPING FROM BUILDING STRUCTURE. FIELD ASSEMBLE AND INSTALL ACCORDING TO MANUFACTURER'S WRITTEN INSTRUCTIONS. THERMAL HANGER SHEILD INSERTS SHALL MEET ASTM C 552 FOR COLD AND HOT PIPING MATERIALS. ● PROVIDE DIELECTRIC NIPPLE EQUAL TO GRANGER PFZ , NPT CONNECTION, MATERIAL OF CONSTRUCTION NON-ALLOY STEEL , SCHEDULE 40 WOG 150 AT 200 DEG F PSI, STANDARDS- ASTM A53 ANSI B120.1. PIPING INSULATION: ● INSULATION SHALL BE EQUAL TO OWENS CORNING FIBERGLAS 700 SERIES INSULATION, IN PRE-FORMED PIPE AND TANK, TYPE 1, WITH ASJ FACING TO MATCH EXISTING. INSULATION SHALL BE 1" THICK. INSULATION SHALL BE APPLIED IN FULL ACCORDANCE WITH MANUFACTURERS PUBLISHED RECOMMENDATIONS FOR THE SERVICE INTENDED WITH PARTICULAR CARE BEING PAID TO PROVIDING A PERMANENT SUBSTANTIAL VAPOR BARRIER OVER ALL COLD SURFACES. ● FITTINGS SHALL BE INSULATED AND COVERED WITH PRE MOLDED ONE-PIECE PVC INSULATED FITTING COVERS. VALVES, BONNETS, AND STRAINERS SHALL BE INSULATED WITH A HYDRAULIC SETTING CEMENT TO THE SAME THICKNESS AS ADJOINING COVERING AND SEALED WITH A VAPOR BARRIER ADHESIVE OR MASTIC. ● OUTDOOR INSULATION SHALL BE RIGID FIBERBOARD, 2" THICK, WITH WEATHERPROOF ALUMINUM JACKET. AHU SPECIFICATION BASIS OF DESIGN: ADDISON MODEL NUMBER: RCA/ HCA PART 1 — GENERAL 1.01 SYSTEM DESCRIPTION: INDOOR ELECTRONICALLY CONTROLLED, COOLING OR COOLING/HEATING UNIT UTILIZING HERMETIC SCROLL COMPRESSORS WITH CRANKCASE HEATERS FOR COOLING DUTY AND ELECTRIC FOR HEATING DUTY. UNITS SHALL DISCHARGE SUPPLY AIR VERTICALLY OR HORIZONTALLY AS SHOWN ON CONTRACT DRAWINGS. 1.02 QUALITY ASSURANCE A. UNIT SHALL BE DESIGNED TO CONFORM TO ANSI/ASHRAE 15 (LATEST EDITION), ASHRAE 62, AND UL STANDARD 1995. B. UNIT SHALL BE LISTED BY ETL AND ETL, CANADA AS A TOTAL PACKAGE. 1.03 DELIVERY, STORAGE AND HANDLING UNIT SHALL BE STORED AND HANDLED PER MANUFACTURER’S RECOMMENDATIONS. PART 2 — PRODUCTS 2.01 AIR HANDLING UNIT A. GENERAL: FACTORY-ASSEMBLED, SINGLE-PIECE HEATING AND COOLING UNIT. CONTAINED WITHIN THE UNIT ENCLOSURE SHALL BE ALL FACTORY WIRING (SINGLE POINT POWER ), B. UNIT CABINET: 1. CABINET SHALL BE CONSTRUCTED OF G-90 GALVANIZED STEEL WITH MINIMUM GAUGE THICKNESS OF: BASES; CORNER POSTS AND TOPS - 18 GAUGE; ACCESS PANELS - 20 GAUGE. THE INTERIOR OF THE CABINET IS TO THERMALLY INSULATED WITH 1 INCH THICK FIBERGLASS WITH AN R VALUE OF 4.2. 2. UNIT SHALL HAVE A FACTORY-INSTALLED SLOPED CONDENSATE DRAIN CONNECTION FABRICATED OF STAINLESS STEEL. 1.PAINT FINISH CONSTRUCTED OF HOT DIPPED GALVANIZED G90 STEEL THAT IS CHEMICALLY TREATED WITH ZINC , COATED WITH 0.2 TO 0.3 MIL POLYURETHANE PRIMER THEN FINISHED WITH .07 TO .08 MIL POLYESTER TOP COAT. FINISH SHALL MEET OR EXCEEDS 1,000 HOUR SALT SPRAY TEST PER ASTM B117 97. C. FANS: 1. INDOOR EVAPORATOR FANS: BLOWER WHEELS SHALL BE FABRICATED OF GALVANIZED OR GALVALUME. BLOWER HOUSINGS BE FABRICATED OF GALVANIZED OR EPOXY COATED STEEL. THE BLOWER WHEEL SHALL BE MOUNTED ON A SOLID STEEL SHAFT SUPPORTED BY SEALED BALL BEARINGS. THE SHAFT SHALL BE DRIVEN BY ADJUSTABLE BELT DRIVE SHEAVES CONNECTED TO A 1725RPM MOTOR WITH SEALED BALL BEARINGS. 2. CONTROL KIT FOR FIELD MOUNTING AND WIRING. TO INCLUDE THE BLOWER MOTOR CONTACTOR OR STARTER. D.COILS: 1. STANDARD EVAPORATOR COIL SHALL HAVE ENHANCED SURFACE ALUMINUM PLATE FINS MECHANICALLY BONDED TO FOUR ROWS OF SEAMLESS INTERNALLY GROOVED COPPER TUBES WITH ALL JOINTS BRAZED. 2. STANDARD CONDENSER COIL SHALL HAVE ENHANCED SURFACE ALUMINUM PLATE FINS MECHANICALLY BONDED TO SEAMLESS INTERNALLY GROOVED COPPER TUBES WITH ALL JOINTS BRAZED. 3. COILS SHALL BE PRESSURE TESTED AT 650 PSIG PRIOR TO UNIT ASSEMBLY; LEAK TESTED AT 150 PSIG AND UNDERGO FINAL TESTING AT 475 PSIG. E. OPTIONAL ACCESSORIES 1. 2-INCH FILTERS: OPTIONAL FILTER SECTION SHALL BE SUPPLIED WITH 2-IN. THICK, MERV 11, PLEATED FIBERGLASS FILTERS. F. DISCONNECT FOR AIR HANDLER SHALL BE PROVIDED UNDER DIV 26 FOR FIELD INSTALLATION AND WIRING 2.01 CONDENSING UNIT 1. FURNISH AND INSTALL AIR COOLED RECIPROCATING CONDENSING UNIT. CAPACITY AND ENERGY EFFICIENCY SHALL NOT BE LESS THAN SCHEDULED. UNIT SHALL BE PROVIDED WITH FACTORY INSTALLED OPTIONS LISTED BELOW. A MATCHING AIR HANDLER SHALL BE PROVIDED. a) APPROVALS. UNIT SHALL BE DESIGN CERTIFIED TO CONFORM TO APPROPRIATE UL STANDARDS BY APPLIED RESEARCH LABORATORIES OR OTHER NATIONALLY RECOGNIZED TESTING LABORATORY. b) CABINET. CABINET SHALL BE CONSTRUCTED OF G-90 GALVANIZED STEEL WITH MINIMUM GAUGE THICKNESS OF: BASES - 16 GAUGE; CORNER POSTS AND TOPS - 18 GAUGE; ACCESS PANELS - 20 GAUGE. THE CABINET SHALL BE MOUNTED ON TWO STEEL RAILS TO FACILITATE INSTALLATION. c) NON RUST BASE. UNIT BASE PAN SHALL BE COATED WITH A MASTIC COMPOUND TO A UNIFORM ¼" WET DEPTH AND AIR DRIED TO PREVENT RAIN OR CONDENSATE FROM CONTACTING STEEL ON THE BOTTOM OF THE BASE PAN. d) PAINT FINISH. CONSTRUCTED OF HOT DIPPED GALVANIZED G90 STEEL THAT IS CHEMICALLY TREATED WITH ZINC PHOSPHATE, COATED WITH 0.2 TO 0.3 MIL POLYURETHANE PRIMER THEN FINISHED WITH .07 TO .08 MIL POLYESTER TOP COAT. FINISH SHALL MEET OR EXCEEDS 1,000 HOUR SALT SPRAY TEST PER ASTM B117 97. e) NON-CORRODING HARDWARE. ALL EXTERIOR NUTS, BOLTS AND WASHERS SHALL BE STAINLESS STEEL TYPE 304. EXTERIOR SCREWS SHALL BE EITHER STAINLESS STEEL TYPE 304 OR CARBON STEEL COATED WITH MAGNIGARD SILVER 17, AN EPOXY FINISH CONTAINING ALUMINUM FLAKE PIGMENT THAT MEETS OR EXCEEDS 10,000 HOUR SALT SPRAY TEST PER ASTM B117 97. 2. CONDENSER FANS: A. FANS SHALL BE DIRECT-DRIVEN PROPELLER TYPE ONLY, WITH CORROSION-RESISTANT BLADES RIVETED TO CORROSION-RESISTANT STEEL SUPPORTS. B. FANS SHALL DISCHARGE AIR VERTICALLY UPWARD AND BE PROTECTED BY PVC COATED STEEL WIRE SAFETY GUARDS. C. FANS SHALL BE STATICALLY AND DYNAMICALLY BALANCED. 3. REFRIGERATION SYSTEM a) THE REFRIGERANT SYSTEMS SHALL INCLUDE THE COMPRESSOR WITH CRANKCASE HEATER, AIR-COOLED CONDENSER COIL, FILTER-DRYER, SUCTION LINE ACCUMULATOR, AND REFRIGERANT PRESSURE SERVICE VALVES. THE CONDENSER COILS ARE TO BE COPPER TUBE-ALUMINUM PLATE FIN. THE SCROLL COMPRESSORS SHALL BE DIGITAL TYPE. THE REFRIGERANT COMPRESSOR SHALL BE WARRANTED BY THE MANUFACTURER FOR 5 YEARS FROM DATE OF INSTALLATION b) FACTORY RUBBER-IN-SHEAR MOUNTED FOR VIBRATION ISOLATION. 4. REFRIGERANT COMPONENTS: 1. UNIT SHALL BE EQUIPPED WITH SINGLE REFRIGERANT CIRCUIT CONTAINING: A. SOLID CORE FILTER DRIER. B. GAGE CONNECTION PORTS 2. UNIT SHALL BE EQUIPPED WITH FAN CYCLING LOW AMBIENT HEAD PRESSURE CONTROL TO ALLOW OPERATION DOWN TO 35 F. 5. CONTROLS AND SAFETIES: 1. MICROPROCESSOR CONTROLS: A. SHALL INCLUDE A UNITARY CONTROL PANEL WITH COMMUNICATION PORT. B. BACNET, MODBUS PROTOCOL CAPABLE. C. SHALL PROVIDE A 5° F TEMPERATURE DIFFERENCE BETWEEN COOLING AND HEATING SET POINTS TO MEET ASHRAE 90.1, ENERGY STANDARD. D. SHALL PROVIDE AN ALARM INDICATOR AND AN AUDIBLE ALARM SIGNAL. E. SHALL PROVIDE AND DISPLAY A CURRENT ALARM LIST AND AN ALARM HISTORY LIST. F. COMPRESSOR MINIMUM RUN TIME (3 MINUTES) AND MINIMUM OFF TIME (5 MINUTES) SHALL BE PROVIDED. G. SHALL HAVE SERVICE RUN TEST CAPABILITY H. SHALL HAVE A SERVICE DIAGNOSTIC MODE. I. MINIMUM OF 2 CAPACITY STAGES (SINGLE CIRCUIT) OR 3 CAPACITY STAGES (DUAL CIRCUIT) OF MECHANICAL CAPACITY CONTROL (EXCLUDING HOT GAS BYPASS) CONTROLLED WITH LOGIC TO MAINTAIN SUPPLY-AIR TEMPERATURE SET POINT. J. UNIT SHALL BE COMPLETE WITH SELF-CONTAINED LOW VOLTAGE CONTROL CIRCUIT. 2. SAFETIES: A. UNIT SHALL INCORPORATE A SOLID-STATE COMPRESSOR LOCKOUT WHICH PROVIDES OPTIONAL RESET CAPABILITY AT THE SPACE THERMOSTAT SHOULD ANY OF THE FOLLOWING SAFETY DEVICES TRIP AND SHUT OFF COMPRESSOR: 1) COMPRESSOR LOCKOUT PROTECTION PROVIDED FOR EITHER INTERNAL OR EXTERNAL OVERLOAD. 2) LOW-PRESSURE PROTECTION. 3) FREEZE PROTECTION (EVAPORATOR COIL). 4) HIGH PRESSURE PROTECTION. 5) LOSS OF CHARGE PROTECTION. B. SUPPLY-AIR SENSOR SHALL BE LOCATED IN THE UNIT AND SHALL BE USED FOR COMPRESSOR STAGE CONTROL. J. ELECTRICAL REQUIREMENTS: 1.ALL UNIT POWER WIRING SHALL ENTER UNIT CABINET AT A SINGLE LOCATION. 2.TOUCH-SAFE CONTROL PANEL K. OPTIONS 1. NON-FUSED DISCONNECT SWITCH:- CONDENSING UNIT ONLY SHALL BE FACTORY-INSTALLED, INTERNALLY MOUNTED, AND UL APPROVED. NON-FUSED SWITCH SHALL PROVIDE UNIT POWER SHUTOFF TO THE OUTDOOR UNIT. SHALL BE ACCESSIBLE FROM OUTSIDE THE UNIT AND SHALL PROVIDE POWER OFF LOCKOUT CAPABILITY. 1 A 2 3 4 5 6 A B C D E 1 3 4 5 6 2 COPYRIGHT 2016 BASKERVILL. USE OF THIS WORK IN WHOLE OR IN PART IS FORBIDDEN WITHOUT EXPRESSED WRITTEN CONSENT. B C D E DRAWING NO. P.O. BOX 400, RICHMOND, VA 23218-0400 DRAWING TITLE ISSUE PROJECT OWNER ® TOWN OF VAIL USE 7/11/2016 11:05:26 AM SPECIFICATIONS THE WIDEWATERS GROUP 2.160036.0 DOUBLETREE VAIL, CO CONVERSION GUESTROOMS & PUBLIC SPACES RENOVATION 07/08/16 - PERMIT SET M701 2211 N FRONTAGE RD, VAIL, COLORADO 81657 SPECIFICATIONS - HVAC SEQUENCE OF OPERATIONS AHU VARIABLE AIR VOLUME AIR HANDLER UNIT SEQUENCE OF OPERATIONS TERMINAL UNIT HYDRONIC CONTROLS 07/11/2016 P.O. BOX 400, RICHMOND, VA 23218-0400 ® 08/16/16