HomeMy WebLinkAboutB16-0266_P114_1478900282.pdfDW
DW
22.10
22.10
22.10
22.11
22.11
P410
3C
P410
5C
22.12
22.11
P410
4C
P410
6C
22.15
22.15
22.16
PF-2,3
PF-2,3
22.15
PF-2,3
PF-4,5
1 A 2 3 4 5 6 A B C D E
1
3 4 5 6 2
COPYRIGHT 2016 BASKERVILL. USE OF THIS WORK IN WHOLE OR IN
PART IS FORBIDDEN WITHOUT EXPRESSED WRITTEN CONSENT.
B C D E
DRAWING NO.
P.O. BOX 400, RICHMOND, VA 23218-0400
DRAWING TITLE
ISSUE
PROJECT
OWNER
®
TOWN OF VAIL USE
7/11/2016
10:40:44 AM
4th FLOOR PLAN
THE WIDEWATERS
GROUP
2.160036.0
DOUBLETREE VAIL,
CO CONVERSION
GUESTROOMS &
PUBLIC SPACES
RENOVATION
07/08/16 - PERMIT SET
P114
2211 N FRONTAGE
RD, VAIL, COLORADO
81657
SCALE: 1/8" = 1'-0" DRAWING REF: E433
6A4th FLOOR - DEMOLITION
SCALE: 1/8" = 1'-0" DRAWING REF: E433
6C4th FLOOR - NEW WORK
22.10 DISCONNECT PIPING AND REMOVE LAVATORY AND FAUCET. EXISTING CW, HW,
AND WASTE ROUGH-INS TO BE REUSED FOR NEW LAVATORY AND FAUCET.
22.11 DISCONNECT PIPING AND REMOVE LAVATORY AND FAUCET. CAP PIPING WITHIN
WALL.
22.12 REMOVE BATHTUB, BATH SPOUT, SHOWERHEAD, TRIM, AND VALVE. EXISTING
PIPING TO BE REWORKED. SEE DETAIL ON DRAWING P001
22.15 INSTALL NEW LAVATORY AND FAUCET. TIE INTO EXISTING CW, HW, & WASTE
ROUGH-INS.
22.16 INSTALL NEW SHOWER PAN, VALVE, TRIM AND SHOWERHEAD. RE-WORK EXISTING
CW, HW, & WASTE PIPING TO ACCOMMODATE NEW SHOWER. SEE DETAIL 4A ON
DRAWING P001
PLAN KEYNOTES
GENERAL NOTES
1. ALL FIXTURES BEING REPLACED SHALL HAVE NEW WATER SUPPLY STOPS,
P-TRAPS, AND WALL ESCUTCHEONS.
2. ADA LAVATORIES SHALL HAVE SUPPLY STOPS AND P-TRAP INSULATION INSTALLED
EQUAL TO TRUEBRO "LAV-GUARD-2".
07/11/2016
P.O. BOX 400, RICHMOND, VA 23218-0400
®
08/16/16